In the process of intelligent mine construction in open-pit mine, in order to improve the safety monitoring ability of mine transportation system, solve the problems of large human interference and blind Angle detecti...In the process of intelligent mine construction in open-pit mine, in order to improve the safety monitoring ability of mine transportation system, solve the problems of large human interference and blind Angle detection by existing conventional monitoring methods, this paper establishes an open-pit mine monitoring data set, and proposes a real-time intelligent monitoring model based on UAV. The reasoning component with strong computing power and low power consumption is selected, and the lightweight object detection model is selected for the experiment. A quantitative standard of dynamic energy consumption detection by evaluation algorithm is proposed. Through experimental comparison, it is found that YOLOv4-tiny has the highest comprehensive grade in detection accuracy, speed, energy consumption and other aspects, which is suitable for application in the above model.展开更多
As the number and geometric intensity of visual satellites are susceptible to large slopes in open-pit mines, we propose integration of GPS/Pseudolites (PLs) positioning technology which can increase the number of vis...As the number and geometric intensity of visual satellites are susceptible to large slopes in open-pit mines, we propose integration of GPS/Pseudolites (PLs) positioning technology which can increase the number of visible satellites, strengthen the geometric intensity of satellites and provide a precision solution for slope deformation monitoring. However, the un-modeled systematic errors are still the main limiting factors for high precision baseline solution. In order to eliminate the un-modeled systematic error, the Empirical Mode Decomposition (EMD) theory is employed. The multi-scale decomposition and reconstruction architecture are defined here on the basis of the EMD theory and the systematic error mitigation model is demonstrated as well. A standard of the scale selection for the systematic error elimination is given in terms of the mean of the accumulated standardized modes. Thereafter, the scheme of the GPS/PLs baseline solution based on the EMD is suggested. The simulation and experiment results show that the precision factors (DOP) are reduced greatly when PLs is located suitably. The proposed scheme dramatically improves the reliability of ambiguity resolution and the precision of baseline vector after systematic error being eliminated, and provides an effective model for high precision slope deformation monitoring in open-pit mine.展开更多
Three important aspects of phase-mining must be optimized:the number of phases,the geometry and location of each phase-pit(including the ultimate pit),and the ore and waste quantities to be mined in each phase.A model...Three important aspects of phase-mining must be optimized:the number of phases,the geometry and location of each phase-pit(including the ultimate pit),and the ore and waste quantities to be mined in each phase.A model is presented,in which a sequence of geologically optimum pits is first generated and then dynamically evaluated to simultaneously optimize the above three aspects,with the objective of maximizing the overall net present value.In this model,the dynamic nature of the problem is fully taken into account with respect to both time and space,and is robust in accommodating different pit wall slopes and different bench heights.The model is applied to a large deposit consisting of 2044 224 blocks and proved to be both efficient and practical.展开更多
Monitoring the stability of steep slopes of open-pit mines is a major issue relating to production safety in mines.In order to determine the technical parameters of a new type of supervising system applied in monitori...Monitoring the stability of steep slopes of open-pit mines is a major issue relating to production safety in mines.In order to determine the technical parameters of a new type of supervising system applied in monitoring steep slopes of open-pit mines,the MSARMA method was used to establish analytical models for the monitoring system,given various parameter settings based on the description of mechanical monitoring principles.We used this sensitivity analysis to conclude that the setting of the most sensitive location of a mechanical monitoring system should be within a range of 1/5~1/2 of the lower part in a vertical direction of steep slopes,with a rational and feasible range of the dip angle setting between 0°~20°.Given the analytical results of our on-site experiments,we have shown that the parameters determined reflect the stability of steep slopes accurately and effectively.These conclusions provide a basis for the application of a new type of steep slope stability monitoring technology in open-pit mines.展开更多
The circle geometric constraint model(CGCM) was put forward for resolving the open-pit mine ore-matching problems(OMOMP).By adopting the approaches of graph theory,block model of blasted piles was abstracted into a se...The circle geometric constraint model(CGCM) was put forward for resolving the open-pit mine ore-matching problems(OMOMP).By adopting the approaches of graph theory,block model of blasted piles was abstracted into a set of nodes and directed edges,which were connected together with other nodes in the range of circle constraints,to describe the mining sequence.Also,the constructing method of CGCM was introduced in detail.The algorithm of CGCM has been realized in the DIMINE system,and applied to a short-term(5d) program calculation for ore-matching of a cement limestone mine in Hebei Province,China.The applications show that CGCM can well describe the mining sequence of ore blocks and its mining geometric constraints in the process of mining blasted piles.This model,which is applicable for resolving OMOMP under complicated geometric constraints with accurate results,provides effective ways to solve the problems of open-pit ore-matching.展开更多
In order to increase production efficiency at open-pit mines, on the basis of linear programming, a practical mathematical model for optimizing truck flow was developed, which improved the traditional fixed manual sch...In order to increase production efficiency at open-pit mines, on the basis of linear programming, a practical mathematical model for optimizing truck flow was developed, which improved the traditional fixed manual schedule method. The model has advantages from linear programming and objective programming, makes most handling points working at full capacity and keeps an optimized ratio between trucks and excavators. For ensuring feasibility of the model in practical production, four standards for feasibility test were proposed. The model satisfied all the standards. The application in a large scale open-pit iron mine indicated that the model reduced the number of required trucks by 10% compared with the fixed manual schedule method.展开更多
To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of th...To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of the 34,600 profile are obtained on the basis of hydrology, geology, and monitoring data.The residual thrust method is utilized to calculate the stability coefficients, which are 1.225 and 1.00 under sound and transfixion conditions, respectively. According to the rock damage and fragmentation and the principle of mechanical parameter degradation, the mechanical models of the slide mass development of the hard and soft rock slopes are established. An integrated model for calculating the slope stability coefficient is built considering water, vibration, and other external factors that pertain to the structural plane damage mechanism and the generating mechanism of the sliding mass. The change curve of the stability coefficient in the slide mass development is obtained from the relevant analyses,and afterwards, the stability control measures are proposed. The analysis results indicate that in the cracking stage of the hard rock, the slope stability coefficient decreases linearly with the increase in the length Lbof the hard rock crack zone. The linear slope is positively correlated to rock cohesion c. In the transfixion stage of the soft rock, the decrease speed of the stability coefficient is positively correlated to the residual strength of the soft rock. When the slope is stable, the stability coefficient is in a quadratic-linear relationship with the decreased height Dh of the side slope and in a linear relationship with anchoring force P.展开更多
Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining tech...Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized.展开更多
Based on the externality theory and the environmental value theory, the hypothesis of charging for waste dumping of open-pit metal mines was put forth. The charging methods were designed according to the characteristi...Based on the externality theory and the environmental value theory, the hypothesis of charging for waste dumping of open-pit metal mines was put forth. The charging methods were designed according to the characteristics of waste dumping of openpit metal mines, including charging based on the dumping amount of the total waste, multi-charging factors, exceeding standard punishment charging, and so on. The main charging parameter is based on the dumping area rather than the total amount of waste dumping.The charging model of waste dumping of open-pit mines was formulated, and the charging rate was divided into two parts, i.e., the standard charging rate and the differential charging rate. The standard charging rate was derived using the equilibrium dynamic model,whereas the differential one was obtained by establishing the fuzzy synthesized evaluation model.展开更多
Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which mak...Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which makes the sliding mechanism and deformation law of slope rock mass more complicated. This paper, targeting at the east slope of Antaibao Mine with the joint employment of underground mining and open-pit mining, aims to study the moving law of the slope rock mass and the damage mechanism to the overburden of the goaf by numerical simulation. It is supposed that models of possible damage to the slope could be explored for guidance to safety-production of the mine.展开更多
The design and practice in supporting the cut slope of an open-pit mine were introduced, in which the high pressure grouting method was used in reinforcing the weak formation in the slopes. Based on a detailed geologi...The design and practice in supporting the cut slope of an open-pit mine were introduced, in which the high pressure grouting method was used in reinforcing the weak formation in the slopes. Based on a detailed geological survey of the slope, a theoretical analysis was carried out, and the design parameters were proposed, where the Tresca or Mohr-Coulomb yield criteria was employed. A patent technology, named 'Technology of high pressure and multiple grouting in different levels within a single hole', was employed in the construction. Anchor bars were also installed as grouting proceeds. This method combines anchoring and grouting comprehensively and was found successful in practice.展开更多
Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical ...Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical simulations and statistical regressions were applied for analyzing the recovery processes of the backfill and its major influencing factors for the thermal equilibrium in recently backfilled open pits at the Gulian strip coalmine in Mo'he, Northeast China. Results show that the thermal recovery time of backfilled areas is positively correlated to the backfill depth(BD) of the soils, the backfilled soil temperature(BST), and the mean annual ground surface temperature(MAGST); meanwhile, climate warming can impact on thermal regimes of the backfill area. The impact of climate warming on ground temperature of the backfill will show up significantly in about 50 years afterbackfilling(BD at 10.0 and 20.0 m, BST at 20.0°C) under the climate warming scenario(CWS) of 0.025°C·year ^(-1). Grey-relation analyses show that the sensitivity of the backfill recovery time declines in the order of the BD, BST and MAGST. On the basis of the abovementioned studies, the layer-by-layer backfilling in cold seasons is advised for more effective and more rapid recovery of thermal regimes of the backfilled open-pits in cold regions.展开更多
According to the rock engineering property and stability of high-steep open-pitslopes, various factors were collected on the basis of rock engineering system (RSE) theory,and the interaction matrix of stability evalua...According to the rock engineering property and stability of high-steep open-pitslopes, various factors were collected on the basis of rock engineering system (RSE) theory,and the interaction matrix of stability evaluation was established.Then, the stabilityevaluation index (S_p) of the slope was put forward.Ranges of the S_p value and the correspondingstable state were given on the basis of thirty-six samples.It is found that the followingrelationships exist: unstable (easy landslide): S_p<-0.20; mid-stable (may be landslide):-0.20<S_p<0.63; stable (no landslide): S_p>0.63.Finally, the stability evaluation indexwas applied on the high-steep open-pit slope of one mine.Analysis results and monitoringdata indicate that the index meets the necessity of the property of slope engineering, and ithas an important engineering purpose for landslide forecasting of high-steep slopes.展开更多
露天矿区场景复杂,行车障碍物检测受扬尘和颗粒物等粉尘噪声干扰严重,难以准确识别障碍物,尤其是光线较差的夜间,不利于做出正确决策,从而影响无人作业的安全性和整体效率。针对以上问题,提出了一种基于YOLOv8n模型的露天矿区行车障碍...露天矿区场景复杂,行车障碍物检测受扬尘和颗粒物等粉尘噪声干扰严重,难以准确识别障碍物,尤其是光线较差的夜间,不利于做出正确决策,从而影响无人作业的安全性和整体效率。针对以上问题,提出了一种基于YOLOv8n模型的露天矿区行车障碍物检测算法YOLOv8n-Enhanced。该算法主要从3个方面进行了改进,具体包括:首先,针对受粉尘噪声干扰严重和夜间光线不足的问题,提出了C2fCA模块结构,提高了模型特征提取能力;其次,使用轻量级卷积技术GSConv和VoV-GSCSP模块,减轻模型复杂性,实现检测器更高的计算成本效益;最后,使用WIOU损失函数,提高了模型泛化能力。试验结果表明:改进算法在保持实时性的前提下,可将YOLOv8n的平均精度(mean Average Precision,mAP)分别提高1.8%和2.6%,实现白天与夜间场景下不同尺度的障碍物识别。展开更多
文摘In the process of intelligent mine construction in open-pit mine, in order to improve the safety monitoring ability of mine transportation system, solve the problems of large human interference and blind Angle detection by existing conventional monitoring methods, this paper establishes an open-pit mine monitoring data set, and proposes a real-time intelligent monitoring model based on UAV. The reasoning component with strong computing power and low power consumption is selected, and the lightweight object detection model is selected for the experiment. A quantitative standard of dynamic energy consumption detection by evaluation algorithm is proposed. Through experimental comparison, it is found that YOLOv4-tiny has the highest comprehensive grade in detection accuracy, speed, energy consumption and other aspects, which is suitable for application in the above model.
基金supported by the Research Fund of State Key Laboratory of Coal Resources and Mine safety, China University of Mining & Technology (No.08KF07) the Doctoral Fund of Ministry of Education for Young Scholar (No.200802901516)+4 种基金the Natural Science Foundation of Jiangsu Province (No.BK2009099)the Special Foundation of NSFC-DEST (No.50810076)the National Natural Science Foundation of China (No.40774010)the National Natural Science Foundation for Young Scholar (No.40904004)the Doctoral Fund of Ministry of Education of China (No.200802900501)
文摘As the number and geometric intensity of visual satellites are susceptible to large slopes in open-pit mines, we propose integration of GPS/Pseudolites (PLs) positioning technology which can increase the number of visible satellites, strengthen the geometric intensity of satellites and provide a precision solution for slope deformation monitoring. However, the un-modeled systematic errors are still the main limiting factors for high precision baseline solution. In order to eliminate the un-modeled systematic error, the Empirical Mode Decomposition (EMD) theory is employed. The multi-scale decomposition and reconstruction architecture are defined here on the basis of the EMD theory and the systematic error mitigation model is demonstrated as well. A standard of the scale selection for the systematic error elimination is given in terms of the mean of the accumulated standardized modes. Thereafter, the scheme of the GPS/PLs baseline solution based on the EMD is suggested. The simulation and experiment results show that the precision factors (DOP) are reduced greatly when PLs is located suitably. The proposed scheme dramatically improves the reliability of ambiguity resolution and the precision of baseline vector after systematic error being eliminated, and provides an effective model for high precision slope deformation monitoring in open-pit mine.
基金Project(50974041) supported by the National Natural Science Foundation of ChinaProject(20090042120040) supported by the Doctoral Program Foundation of the Ministry of Education, ChinaProject(20093910) supported by the Natural Science Foundation of Liaoning Province, China
文摘Three important aspects of phase-mining must be optimized:the number of phases,the geometry and location of each phase-pit(including the ultimate pit),and the ore and waste quantities to be mined in each phase.A model is presented,in which a sequence of geologically optimum pits is first generated and then dynamically evaluated to simultaneously optimize the above three aspects,with the objective of maximizing the overall net present value.In this model,the dynamic nature of the problem is fully taken into account with respect to both time and space,and is robust in accommodating different pit wall slopes and different bench heights.The model is applied to a large deposit consisting of 2044 224 blocks and proved to be both efficient and practical.
基金Project 1053G032 supported by the Youth Science Foundation of Educational Committee of Heilongjiang Province
文摘Monitoring the stability of steep slopes of open-pit mines is a major issue relating to production safety in mines.In order to determine the technical parameters of a new type of supervising system applied in monitoring steep slopes of open-pit mines,the MSARMA method was used to establish analytical models for the monitoring system,given various parameter settings based on the description of mechanical monitoring principles.We used this sensitivity analysis to conclude that the setting of the most sensitive location of a mechanical monitoring system should be within a range of 1/5~1/2 of the lower part in a vertical direction of steep slopes,with a rational and feasible range of the dip angle setting between 0°~20°.Given the analytical results of our on-site experiments,we have shown that the parameters determined reflect the stability of steep slopes accurately and effectively.These conclusions provide a basis for the application of a new type of steep slope stability monitoring technology in open-pit mines.
基金Project(2011AA060407) supported by the National High Technology Research and Development Program of ChinaProject(51074073) supported by the National Natural Science Foundation of China
文摘The circle geometric constraint model(CGCM) was put forward for resolving the open-pit mine ore-matching problems(OMOMP).By adopting the approaches of graph theory,block model of blasted piles was abstracted into a set of nodes and directed edges,which were connected together with other nodes in the range of circle constraints,to describe the mining sequence.Also,the constructing method of CGCM was introduced in detail.The algorithm of CGCM has been realized in the DIMINE system,and applied to a short-term(5d) program calculation for ore-matching of a cement limestone mine in Hebei Province,China.The applications show that CGCM can well describe the mining sequence of ore blocks and its mining geometric constraints in the process of mining blasted piles.This model,which is applicable for resolving OMOMP under complicated geometric constraints with accurate results,provides effective ways to solve the problems of open-pit ore-matching.
基金This work was financially supported by the National Key Technologies RD Program in the 10th five-year plan (No.2001BA609A-08).
文摘In order to increase production efficiency at open-pit mines, on the basis of linear programming, a practical mathematical model for optimizing truck flow was developed, which improved the traditional fixed manual schedule method. The model has advantages from linear programming and objective programming, makes most handling points working at full capacity and keeps an optimized ratio between trucks and excavators. For ensuring feasibility of the model in practical production, four standards for feasibility test were proposed. The model satisfied all the standards. The application in a large scale open-pit iron mine indicated that the model reduced the number of required trucks by 10% compared with the fixed manual schedule method.
基金financially supported by the National Natural Science Foundation of China (No. 51034005)National High Technology Research and Development Program of China (No. 2012AA062004)Program for New Century Excellent Talents in University of China (No. NCET-13-1022)
文摘To study the stability of the west slope in Buzhaoba Open-Pit Mine and determine the aging stability coefficient during slide mass development, the deformation band of the west slope and the slide mass structure of the 34,600 profile are obtained on the basis of hydrology, geology, and monitoring data.The residual thrust method is utilized to calculate the stability coefficients, which are 1.225 and 1.00 under sound and transfixion conditions, respectively. According to the rock damage and fragmentation and the principle of mechanical parameter degradation, the mechanical models of the slide mass development of the hard and soft rock slopes are established. An integrated model for calculating the slope stability coefficient is built considering water, vibration, and other external factors that pertain to the structural plane damage mechanism and the generating mechanism of the sliding mass. The change curve of the stability coefficient in the slide mass development is obtained from the relevant analyses,and afterwards, the stability control measures are proposed. The analysis results indicate that in the cracking stage of the hard rock, the slope stability coefficient decreases linearly with the increase in the length Lbof the hard rock crack zone. The linear slope is positively correlated to rock cohesion c. In the transfixion stage of the soft rock, the decrease speed of the stability coefficient is positively correlated to the residual strength of the soft rock. When the slope is stable, the stability coefficient is in a quadratic-linear relationship with the decreased height Dh of the side slope and in a linear relationship with anchoring force P.
文摘Given the conditions of residual coal from the boundary of a flat dipping open-pit mine,which uses strip areas mining and inner dumping with slope-covering,we propose an open-pit and underground integrated mining technology for residual coal of end slopes.In the proposal a conveyance road and ventilation conveyance near the slope are built,corresponding to the pit mining area and the surface coal mine dump,as well as an interval haulage tunnel and air-inlet tunnel.The outcome shows that such mining method may reduce the effect to slope stability from underground mining,it does not affect the dumping advance and has a high recovery rate of residual coal resources.The working face is timbered by single hydraulic props,transported by a scraper conveyor and supported by coal walls.This method of mining is one of layered top coal caving,with high resource recovery,low production cost where positive economic benefit can be realized.
文摘Based on the externality theory and the environmental value theory, the hypothesis of charging for waste dumping of open-pit metal mines was put forth. The charging methods were designed according to the characteristics of waste dumping of openpit metal mines, including charging based on the dumping amount of the total waste, multi-charging factors, exceeding standard punishment charging, and so on. The main charging parameter is based on the dumping area rather than the total amount of waste dumping.The charging model of waste dumping of open-pit mines was formulated, and the charging rate was divided into two parts, i.e., the standard charging rate and the differential charging rate. The standard charging rate was derived using the equilibrium dynamic model,whereas the differential one was obtained by establishing the fuzzy synthesized evaluation model.
文摘Under circumstances in which both underground mining and open-pit mining are employed, the mining effects of two approaches will be superposed and the mining slope will receive several induced stress fields, which makes the sliding mechanism and deformation law of slope rock mass more complicated. This paper, targeting at the east slope of Antaibao Mine with the joint employment of underground mining and open-pit mining, aims to study the moving law of the slope rock mass and the damage mechanism to the overburden of the goaf by numerical simulation. It is supposed that models of possible damage to the slope could be explored for guidance to safety-production of the mine.
文摘The design and practice in supporting the cut slope of an open-pit mine were introduced, in which the high pressure grouting method was used in reinforcing the weak formation in the slopes. Based on a detailed geological survey of the slope, a theoretical analysis was carried out, and the design parameters were proposed, where the Tresca or Mohr-Coulomb yield criteria was employed. A patent technology, named 'Technology of high pressure and multiple grouting in different levels within a single hole', was employed in the construction. Anchor bars were also installed as grouting proceeds. This method combines anchoring and grouting comprehensively and was found successful in practice.
基金supported by the research projects of the National Natural Science Foundation of China (Grant No. 41401081) "Thermal impacts of organic matter on properties of permafrost soils in the Da Xing'anling (Hinggan) Mountains"the State Key Laboratory of Frozen Soils Engineering, Ministry of Science and Technology, China "Impacts of human activities on the hydrothermal processes of permafrost in the Da Xing'anling (Hinggan) Mountains – a case study from the Gulian strip coal mine" (Grant No. SKLFSE-ZT-41)
文摘Timely and proper backfilling of open-pits in strip coal-mines has been an effective measurement for the recovery of the hydrothermal regimes and ecological environment in permafrost regions. In this study, numerical simulations and statistical regressions were applied for analyzing the recovery processes of the backfill and its major influencing factors for the thermal equilibrium in recently backfilled open pits at the Gulian strip coalmine in Mo'he, Northeast China. Results show that the thermal recovery time of backfilled areas is positively correlated to the backfill depth(BD) of the soils, the backfilled soil temperature(BST), and the mean annual ground surface temperature(MAGST); meanwhile, climate warming can impact on thermal regimes of the backfill area. The impact of climate warming on ground temperature of the backfill will show up significantly in about 50 years afterbackfilling(BD at 10.0 and 20.0 m, BST at 20.0°C) under the climate warming scenario(CWS) of 0.025°C·year ^(-1). Grey-relation analyses show that the sensitivity of the backfill recovery time declines in the order of the BD, BST and MAGST. On the basis of the abovementioned studies, the layer-by-layer backfilling in cold seasons is advised for more effective and more rapid recovery of thermal regimes of the backfilled open-pits in cold regions.
基金Supported by the National Natural Science Foundation of China(50874042)
文摘According to the rock engineering property and stability of high-steep open-pitslopes, various factors were collected on the basis of rock engineering system (RSE) theory,and the interaction matrix of stability evaluation was established.Then, the stabilityevaluation index (S_p) of the slope was put forward.Ranges of the S_p value and the correspondingstable state were given on the basis of thirty-six samples.It is found that the followingrelationships exist: unstable (easy landslide): S_p<-0.20; mid-stable (may be landslide):-0.20<S_p<0.63; stable (no landslide): S_p>0.63.Finally, the stability evaluation indexwas applied on the high-steep open-pit slope of one mine.Analysis results and monitoringdata indicate that the index meets the necessity of the property of slope engineering, and ithas an important engineering purpose for landslide forecasting of high-steep slopes.
文摘露天矿区场景复杂,行车障碍物检测受扬尘和颗粒物等粉尘噪声干扰严重,难以准确识别障碍物,尤其是光线较差的夜间,不利于做出正确决策,从而影响无人作业的安全性和整体效率。针对以上问题,提出了一种基于YOLOv8n模型的露天矿区行车障碍物检测算法YOLOv8n-Enhanced。该算法主要从3个方面进行了改进,具体包括:首先,针对受粉尘噪声干扰严重和夜间光线不足的问题,提出了C2fCA模块结构,提高了模型特征提取能力;其次,使用轻量级卷积技术GSConv和VoV-GSCSP模块,减轻模型复杂性,实现检测器更高的计算成本效益;最后,使用WIOU损失函数,提高了模型泛化能力。试验结果表明:改进算法在保持实时性的前提下,可将YOLOv8n的平均精度(mean Average Precision,mAP)分别提高1.8%和2.6%,实现白天与夜间场景下不同尺度的障碍物识别。