期刊文献+
共找到106篇文章
< 1 2 6 >
每页显示 20 50 100
Non-explosive mining and waste utilization for achieving green mining in underground hard rock mine in China 被引量:28
1
作者 Shao-feng WANG Li-cheng SUN +4 位作者 Lin-qi HUANG Xi-bing LI Ying SHI Jin-rui YAO Shao-lun DU 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2019年第9期1914-1928,共15页
Innovations of mining technologies were proposed by beneficial utilizations of unfavorable factors such as high geostress,high geotemperature and high mining depth to achieve green mining as mining depth increases ine... Innovations of mining technologies were proposed by beneficial utilizations of unfavorable factors such as high geostress,high geotemperature and high mining depth to achieve green mining as mining depth increases inevitably.Cuttability of deep hard rock was investigated by experimental and regressed analyses to find the reasonable stress adjustment method to improve non-explosive mechanized fragmentation for hard ore-rock.A non-explosive mechanized and intellectualized mining method was proposed to continuously and precisely exploit phosphate underground,which promoted the high-recovery,low-waste and high-efficiency exploitation of phosphate with recovery rate over 90%,dilution rate near 5%and cutting efficiency about 107.7 t/h.A circular economy model and the backfill system were proposed to conduct resource utilizations of solid waste,by which the utilization amount of waste increased year after year.In 2018,the utilization amounts of phosphogypsum,yellow phosphorus slag and waste rock increased to 1853.6×10^3 t/a,291.1×10^3 t/a and 1493.8×10^3 t/a,respectively. 展开更多
关键词 hard rock mine non-explosive mining waste backfilling circular economy waste utilization green mining
下载PDF
Mining pressure monitoring and analysis in fully mechanized backfilling coal mining face-A case study in Zhai Zhen Coal Mine 被引量:14
2
作者 张强 张吉雄 +2 位作者 康涛 孙强 李伟康 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第5期1965-1972,共8页
Fully mechanized solid backfill mining(FMSBM) technology adopts dense backfill body to support the roof. Based on the distinguishing characteristics and mine pressure control principle in this technology, the basic pr... Fully mechanized solid backfill mining(FMSBM) technology adopts dense backfill body to support the roof. Based on the distinguishing characteristics and mine pressure control principle in this technology, the basic principles and methods for mining pressure monitoring were analyzed and established. And the characteristics of overburden strata movement were analyzed by monitoring the support resistance of hydraulic support, the dynamic subsidence of immediate roof, the stress of backfill body, the front abutment pressure, and the mass ratio of cut coal to backfilled materials. On-site strata behavior measurements of 7403 W solid backfilling working face in Zhai Zhen Coal Mine show that the backfill body can effectively support the overburden load, obviously control the overburden strata movement, and weaken the strata behaviors distinctly. Specific performances are as follows. The support resistance decreases obviously; the dynamic subsidence of immediate roof keeps consistent to the variation of backfill body stress, and tends to be stable after the face retreating to 120-150 m away from the cut. The peak value of front abutment pressure arises at 5-12 m before the operating face, and mass ratio is greater than the designed value of 1.15, which effectively ensures the control of strata movement. The research results are bases for intensively studying basic theories of solid backfill mining strata behaviors and its control, and provide theoretical guidance for engineering design in FMSBM. 展开更多
关键词 fully mechanized solid backfill mining(FMSBM) strata movement strata behavior mining pressure monitoring
下载PDF
Settlement behavior of coal mine waste in different surrounding rock conditions 被引量:1
3
作者 马春德 李夕兵 +3 位作者 胡炳南 陈枫 徐纪成 李地元 《Journal of Central South University of Technology》 EI 2008年第3期350-355,共6页
In order to investigate the influence of complex conditions of in-situ surrounding rocks on the settlement behavior of nubbly coal mine waste subjected to high gravity pressure,four kinds of loading chambers made of d... In order to investigate the influence of complex conditions of in-situ surrounding rocks on the settlement behavior of nubbly coal mine waste subjected to high gravity pressure,four kinds of loading chambers made of different similar materials with different elastic moduli in experiments were used to simulate the deformation features of in-site rocks,including soft,moderate hardness,hard and extra-hard rocks. The results show that all the settlement-axial load (or axial strain-stress) curves obtained under four different surrounding rock conditions present power-exponential function feature. The final settlement of coal mine waste under the same axial load is closely related to the lumpiness gradations and the deformation behavior of chamber materials used to simulate behaviors of different in-situ surrounding rocks. In the same surrounding rock condition,the final settlement under the same maximum axial load decreases with the decrease of the proportion of larger gradation of coal mine waste. While for the same lumpiness gradation case,the settlement increases with the decrease of elastic modulus of simulated surrounding rocks and the lateral pressure induced by axial load increases with the increase of elastic modulus of loading chambers that are used to simulate different surrounding rocks. The test results also reveal that both the compaction curve and lateral pressure curve show a three-stage behavior,and the duration of each stage,which is closely related to gradations and the deformation feature of loading chamber materials,decreases with the increase of the proportion of the small size of coal mine waste and elastic modulus of the simulated rock materials. 展开更多
关键词 coal mine waste settlement behavior surrounding rock conditions final settlement lateral pressure
下载PDF
Waste-filling in fully-mechanized coal mining and its application 被引量:27
4
作者 MIAO Xie-xing ZHANG Ji-xiong FENG Mei-mei 《Journal of China University of Mining and Technology》 EI 2008年第4期479-482,共4页
A fully-mechanized coal mining (FMCM) technology capable of filling up the goaf with wastes (including solid wastes) is described. Industrial tests have proved that by using this technology not only can waste be re-us... A fully-mechanized coal mining (FMCM) technology capable of filling up the goaf with wastes (including solid wastes) is described. Industrial tests have proved that by using this technology not only can waste be re-used but also coal resources can be exploited with a higher recovery rate without removing buildings located over the working faces. Two special devices, a hydraulic support and a scraper conveyor, run side-by-side on the same working face to simultaneously realize mining and filling. These are described in detail. The tests allow analysis of rock pressure and ground subsidence when backfilling techniques are employed. These values are compared to those from mining without using backfilling techniques, under the same geological conditions. The concept of equivalent mining height is proposed based on theoretical analysis of rock pressure and ground subsidence. The upper limits of the rock pressure and ground subsidence can be estimated in backfilling mining using this concept along with traditional engineering formulae. 展开更多
关键词 fully-mechanized coal mining coal mining with gangue backfilling mining under buildings railways and water bodies rock pressure around coal face control of ground subsidence
下载PDF
基于3Dmine的采空区治理工程实践
5
作者 时传龙 《黄金》 CAS 2024年第10期68-71,共4页
通过对某金矿采空区资料收集及现场调查,利用3Dmine软件建立了该金矿采空区+巷道三维数字模型,准确获得了各中段采空区的实际边界和采空区形态等相关信息。针对采空区情况,结合矿区生产实际,经综合分析研究,提出了采空区治理方案,即:对... 通过对某金矿采空区资料收集及现场调查,利用3Dmine软件建立了该金矿采空区+巷道三维数字模型,准确获得了各中段采空区的实际边界和采空区形态等相关信息。针对采空区情况,结合矿区生产实际,经综合分析研究,提出了采空区治理方案,即:对矿区已经贯通连成一体的采空区群/塌陷坑(四中段以上)采用地表废石充填,四中段未贯通的采空区采用中深孔强制崩落顶板,将上部自地表“灌入”的废石充填到采空区,同时采取密闭隔离的方式联合治理;对于其余地段的采空区,已经结束回采且无法进入的区域采取在中段石门密闭隔离的方式进行治理,尚在开采的其他采空区采取施工措施工程进行坑内毛石回填并密闭隔离方式治理。通过多项措施的综合运用,彻底消除了发生大面积地压活动并引起地面塌陷的隐患,为井下正常生产作业创造了良好的条件。 展开更多
关键词 金属矿山 空场采矿法 采空区治理 3Dmine软件 地压控制 废石充填 崩落法
下载PDF
Recovery of Mining Wastes in Building Materials: A Review
6
作者 Alinabiwe Nyamuhanga Ally Manjia Marcelline Blanche +3 位作者 Ursula Joyce Pettang Nana Masika Muhiwa Grâce Ngapgue François Chrispin Pettang 《Open Journal of Civil Engineering》 2021年第4期379-397,共19页
The use of materials from waste in buildings compensates for the lack of natural resources, solves the problem of waste management and provides an altern<span style="font-family:Verdana;">ative techniq... The use of materials from waste in buildings compensates for the lack of natural resources, solves the problem of waste management and provides an altern<span style="font-family:Verdana;">ative technique for protection of the environment. There are a lar</span><span style="font-family:Verdana;">ge number of industrial wastes that are used for full or partial replacement of raw materials in some construction materials. This review assesses mining waste in concrete as a substitute for aggregates and cement;in fired bricks as a substitute for soil;and in road backfill as a substitute for soil. This paper reviews some mining tailings, mine waste rocks and some slags obtained in the exploitation and/or processing of some ores including iron, gold, lead, phosphate, copper, coal, etc. Different physical properties, mechanical properties, chemical properties, heavy metal content, mineralogic composition, geotechnical properties and environmental properties (leaching test) of the mine wastes were examined. The physical, mechanical and environmental properties of the materials obtained by substitution of raw materials by mine waste were examined and compared to reference materials. Mining waste in cementitious materials offers good compressive strengths, while the porosity of the concrete and/or mortar is a factor influencing its toxicity. As for the waste in fired bricks, fired at a temperature of 900°</span><span><span><span style="font-family:;" "=""><span style="font-family:Verdana;">C</span><span style="font-family:Verdana;"> or more, it offers convincing compressive and flexural strengths. The few research studies obtained on the use of mining waste in road embankments have shown that mining waste can be used as a sub-base layer and backfill as long as it is not toxic. In addition, several other mining wastes require special attention as substitutes for raw materials in construction materials, such as coltan, cobalt.</span></span></span></span> 展开更多
关键词 mining waste TAILinGS waste rock SLUG Fired Brick Backfill Material Cement Materials
下载PDF
两次采动影响下小煤柱巷道切顶卸压围岩控制技术 被引量:2
7
作者 李汉璞 张百胜 +2 位作者 郭俊庆 杨依卓 崔俊彪 《矿业安全与环保》 CAS 北大核心 2024年第2期90-97,共8页
为解决多次采动影响下留小煤柱巷道矿压显现剧烈、围岩变形量大的问题,提出了“切顶卸压+顶、帮锚索补强”联合控制技术。以贾家沟煤矿10115运输巷为工程背景,分析了切顶卸压位置、高度与巷道围岩垂直应力分布的关系,给出切顶卸压关键参... 为解决多次采动影响下留小煤柱巷道矿压显现剧烈、围岩变形量大的问题,提出了“切顶卸压+顶、帮锚索补强”联合控制技术。以贾家沟煤矿10115运输巷为工程背景,分析了切顶卸压位置、高度与巷道围岩垂直应力分布的关系,给出切顶卸压关键参数,并研究了留小煤柱巷道在切顶卸压后受两次采动影响下的矿压显现规律。结果表明:切顶卸压后,煤柱上的应力峰值随切顶深度的增加呈指数降低;10115运输巷在邻近工作面一次采动过程中巷道围岩变形依次呈现出无变形、缓慢变形、快速变形和围岩稳定的变化规律,本工作面二次采动过程中巷道围岩变形依次呈现出明显变形和剧烈变形的规律;巷道围岩在受二次采动影响时变形更加剧烈,巷道变形量为一次采动时的3.0~7.5倍。 展开更多
关键词 切顶卸压 小煤柱 矿压显现 二次采动 综放工作面 围岩控制
下载PDF
不同加载速率下废石胶结充填体的力学特性及破裂特征研究
8
作者 陈元广 陈彦龙 +4 位作者 吕承贤 顾军 张家龙 张亚飞 李强 《煤矿安全》 CAS 北大核心 2024年第5期160-169,共10页
为研究不同加载速率与骨料粒径级配对废石胶结充填体的力学特性以及破裂特征变化规律;对不同骨料粒径级配的废石胶结充填体进行不同加载速率的单轴压缩试验,分析其力学特性的变化规律;并辅以声发射系统,研究废石胶结充填体内部裂纹的发... 为研究不同加载速率与骨料粒径级配对废石胶结充填体的力学特性以及破裂特征变化规律;对不同骨料粒径级配的废石胶结充填体进行不同加载速率的单轴压缩试验,分析其力学特性的变化规律;并辅以声发射系统,研究废石胶结充填体内部裂纹的发展演化规律。结果表明:废石胶结充填体的单轴抗压强度与弹性模量随着加载速率的增大呈线性增长趋势;废石胶结充填体的单轴抗压强度与弹性模量随着骨料级配指数的增大呈现先增长后降低的趋势;随着骨料级配指数和加载速率的增大,试样破坏模式由张拉破坏逐渐转变为剪切破坏,破坏程度加剧,完整度降低;试样内部裂纹的发展演化总体分为压密阶段、弹性阶段、稳定扩展阶段及非稳定扩展阶段。 展开更多
关键词 废石胶结充填体 充填材料 充填开采 骨料粒径级配 力学特性
下载PDF
泥岩巷道跨越大巷立交段围岩变形影响因素与控制对策
9
作者 徐春辉 钱德雨 +4 位作者 黄森 廉贵龙 刘嘉晨 芦蓝成 王俊杰 《煤炭技术》 CAS 2024年第11期76-79,共4页
立交巷道由于掘进扰动相互叠加影响,岩柱承受应力复杂,立交巷道围岩维护困难。为解决巷道立交段围岩控制难题,以里必煤矿岩石底板抽放巷跨越中央辅助运输大巷立交段为工程背景,基于现场试验与矿压监测分析,明确了立交段矿压显现异常的... 立交巷道由于掘进扰动相互叠加影响,岩柱承受应力复杂,立交巷道围岩维护困难。为解决巷道立交段围岩控制难题,以里必煤矿岩石底板抽放巷跨越中央辅助运输大巷立交段为工程背景,基于现场试验与矿压监测分析,明确了立交段矿压显现异常的主要影响因素,提出了立交围岩加强支护与施工优化方案,两巷立交段掘进过程中频繁爆破施工,原支护方案难以维持巷道围岩稳定,采用加强支护方案后,锚杆(索)压力趋于稳定,顶板离层量较小,有效控制巷道围岩变形,维护效果良好。 展开更多
关键词 立交巷道 泥质软岩 矿压显现 锚杆破断 加强支护
原文传递
某磷矿房柱法开采空区治理技术研究与应用
10
作者 万飞 王青松 +5 位作者 董承旺 李天杰 尹里刚 刘豪 王德华 齐炎 《现代矿业》 CAS 2024年第9期72-76,共5页
某磷矿采用脉内开拓盘区房柱法开采,在开采过程中形成了一定规模的采空区,给未来生产造成了较大的安全隐患。为了消除或减小采空区对矿山安全开采的危害,针对采空区存在的现状,进行工程地质调查,采空区治理及安全监测措施等研究,提出了... 某磷矿采用脉内开拓盘区房柱法开采,在开采过程中形成了一定规模的采空区,给未来生产造成了较大的安全隐患。为了消除或减小采空区对矿山安全开采的危害,针对采空区存在的现状,进行工程地质调查,采空区治理及安全监测措施等研究,提出了采用废石干式充填方法进行空区治理方案,并对充填准备和充填步骤进行详细部署;同时,对空区封堵工艺及封堵墙规格进行设计,根据采空区分布特点布置位移监控报警仪和地压监测报警仪,实现采空区地压活动实时监测和预警预报。研究结果为矿山的采空区治理和安全有序生产提供决策依据和技术保障,也为类似条件矿山提供一定的借鉴。 展开更多
关键词 房柱采矿法 采空区治理 废石干式充填 地压监测
下载PDF
切顶卸压沿空留巷无煤柱开采技术实践
11
作者 赵磊 《陕西煤炭》 2024年第8期57-61,共5页
为缓解晋邦德煤矿采掘接替紧张的问题,消除区段煤柱应力集中,提高煤炭采出率,保持巷道的稳定性,以10404回风巷为研究对象,通过理论分析、数值模拟、现场测试等方法,对综放工作面沿空巷道的顶板结构特征、顶板切顶参数、围岩控制技术与... 为缓解晋邦德煤矿采掘接替紧张的问题,消除区段煤柱应力集中,提高煤炭采出率,保持巷道的稳定性,以10404回风巷为研究对象,通过理论分析、数值模拟、现场测试等方法,对综放工作面沿空巷道的顶板结构特征、顶板切顶参数、围岩控制技术与配套设备、沿空巷道的矿压显现规律等进行深入研究,形成一套适合综放工作面的切顶留巷技术。通过矿压监测结果分析可知,在滞后工作面80 m距离时,由于采空区一侧的顶板随回采的进行逐渐被切落、充填和挤压,巷道的围岩变形逐渐变得稳定,证明取得了良好的留巷效果,保证下一工作面综放开采的顺利开展。 展开更多
关键词 切顶卸压 无煤柱开采 沿空留巷 矿压显现 围岩补强
下载PDF
浅埋深大采高工作面矿压规律与影响因素分析 被引量:9
12
作者 曹健 师世图 +4 位作者 闫祎炜 高斌 段军 王汉元 管隆刚 《煤炭技术》 CAS 北大核心 2023年第2期34-38,共5页
为研究浅埋深大采高工作面矿压规律,分析其主要影响因素,以大柳塔煤矿1-2上煤层开采为背景,结合统计分析、物理模拟、数值计算与工程实践的方法,掌握了工作面初次来压与周期来压的矿压显现规律,揭示了煤层采高、埋深对来压规律的影响。... 为研究浅埋深大采高工作面矿压规律,分析其主要影响因素,以大柳塔煤矿1-2上煤层开采为背景,结合统计分析、物理模拟、数值计算与工程实践的方法,掌握了工作面初次来压与周期来压的矿压显现规律,揭示了煤层采高、埋深对来压规律的影响。研究表明,来压期间支架工作阻力随采高的增大而增大,动载系数、周期来压步距与采高没有直接的关系。来压期间支架平均工作阻力、动载系数随埋深的增大而增大,周期来压步距与埋深没有直接的关系。1-2上煤层工作面开采的初次来压步距为60 m,平均周期来压步距为12 m,来压期间支架工作阻力一般在6500~8500 k N,少数支架工作阻力会升到9300 kN左右,工作面支护效果良好。 展开更多
关键词 浅埋深大采高 矿压显现 影响因素 支架载荷 来压步距
原文传递
厚顶煤软岩巷道破坏规律与支护技术
13
作者 李伟涛 《能源与节能》 2023年第8期145-147,共3页
以马兰矿为工程背景,在煤厚多变和围岩“三软”条件下,对马兰矿厚顶煤软岩巷道矿压显现规律和软岩巷道锚固失效原因进行分析。现场调研发现,回采巷道顶底板变形明显,顶板锚固失效;在理论分析的基础上,认为围岩强度低和水对锚固剂、围岩... 以马兰矿为工程背景,在煤厚多变和围岩“三软”条件下,对马兰矿厚顶煤软岩巷道矿压显现规律和软岩巷道锚固失效原因进行分析。现场调研发现,回采巷道顶底板变形明显,顶板锚固失效;在理论分析的基础上,认为围岩强度低和水对锚固剂、围岩的弱化作用是造成回采巷道锚杆(索)失效的主要原因;针对锚固失效问题,现场试验扩孔锚固效果,扩孔锚固后,锚固力整体提高25.0%~93.8%;在以上数据基础上,依据顶煤厚度的不同,提出差异性支护方案,以“端锚+注浆全长锚固”作为锚固增效技术手段,掘进期间巷道顶板下沉量相对较小。 展开更多
关键词 软岩 矿压显现 回采巷道 锚固失效 锚固增效技术
下载PDF
矸石(固体废物)直接充填采煤技术发展现状 被引量:168
14
作者 张吉雄 缪协兴 郭广礼 《采矿与安全工程学报》 EI 北大核心 2009年第4期395-401,共7页
总结了矸石直接充填采煤的技术框架,系统地介绍了综采矸石充填技术、普采矸石充填技术和掘巷充填技术的充填开采系统布置、关键设备及充填开采工艺;研发了矸石直接充填采煤技术中矸石自地表向井下运输的大垂深投料系统,并对其进行了优... 总结了矸石直接充填采煤的技术框架,系统地介绍了综采矸石充填技术、普采矸石充填技术和掘巷充填技术的充填开采系统布置、关键设备及充填开采工艺;研发了矸石直接充填采煤技术中矸石自地表向井下运输的大垂深投料系统,并对其进行了优化设计;以综采矸石充填技术为例,分析矸石直接充填开采矿压规律的等价采高模型,得到了充填综采采场所需支护强度,以及充填综采与传统综采支护强度修正系数η,并对充填开采后的地表沉陷进行了预计和实测分析,得出了充填开采较传统综采采场矿压显现减弱、地表变形等级仅为轻微的结论;从实现煤炭资源绿色开采应重视的基础科学研究、重点技术攻关等方面对今后矸石(固体废物)直接充填采煤技术相关研究进行了展望. 展开更多
关键词 矸石直接充填采煤方法 绿色开采 充填开采矿压规律 等价采高模型
下载PDF
矸石充填综采工作面矿压显现规律 被引量:60
15
作者 张吉雄 吴强 +1 位作者 黄艳利 周跃进 《煤炭学报》 EI CAS CSCD 北大核心 2010年第S1期1-4,共4页
在分析充填综采顶板运动特征的基础上,建立了充填综采基本顶关键块力学模型,并通过分析矸石充填体与破碎直接顶压实变形规律,推导出了充填综采工作面支护强度力学关系式。对比传统综采,引入了充填综采工作面支护强度修正系数η,理论分... 在分析充填综采顶板运动特征的基础上,建立了充填综采基本顶关键块力学模型,并通过分析矸石充填体与破碎直接顶压实变形规律,推导出了充填综采工作面支护强度力学关系式。对比传统综采,引入了充填综采工作面支护强度修正系数η,理论分析得出工作面采高变化在1.6~3.5m时,修正系数η的变化范围为0.49~0.84,得出充填综采工作面所需支护强度明显小于传统综采的结论。现场工程应用进一步证实了充填综采工作面没有明显的矿压显现。 展开更多
关键词 矸石 充填综采 矿压显现 力学模型 支护强度 修正系数
下载PDF
巷道矸石充填控制覆岩变形的力学机理研究 被引量:27
16
作者 李强 茅献彪 +1 位作者 卜万奎 马占国 《中国矿业大学学报》 EI CAS CSCD 北大核心 2008年第6期745-750,共6页
建立了巷道矸石充填的力学模型,并应用Ritz法求解了煤柱位移场的弹性解.根据弹性-黏弹性对应原理,通过引入Maxwell体流变模型,求解了煤柱位移场的黏弹性解.得到了煤柱的压缩变形、侧向变形等随时间及充填体材料特性的变化规律,由此可确... 建立了巷道矸石充填的力学模型,并应用Ritz法求解了煤柱位移场的弹性解.根据弹性-黏弹性对应原理,通过引入Maxwell体流变模型,求解了煤柱位移场的黏弹性解.得到了煤柱的压缩变形、侧向变形等随时间及充填体材料特性的变化规律,由此可确定充填巷采煤柱的变形特征,并估计了煤柱最终变形量及变形稳定时间等.将研究结果与某矿区充填开采实测变形规律比较,两者具有较好的吻合. 展开更多
关键词 煤柱 矸石 充填开采 力学分析
下载PDF
煤矿井下高浓度胶结充填开采技术 被引量:34
17
作者 杨宝贵 王俊涛 +2 位作者 李永亮 李文超 李峥 《煤炭科学技术》 CAS 北大核心 2013年第8期22-26,共5页
为有效控制煤层开采引起的地表移动,进一步提高煤炭资源采出率,结合煤矿充填开采现状,提出煤矿高浓度胶结充填开采方法。运用相似模拟方法,从上覆岩层的移动形式、超前支承压力的影响范围、工作面周期来压强度及合理支架工作阻力等多个... 为有效控制煤层开采引起的地表移动,进一步提高煤炭资源采出率,结合煤矿充填开采现状,提出煤矿高浓度胶结充填开采方法。运用相似模拟方法,从上覆岩层的移动形式、超前支承压力的影响范围、工作面周期来压强度及合理支架工作阻力等多个方面,研究了高浓度胶结充填开采工作面的矿压显现规律。以此矿压显现规律为依据,设计出与之相适应的充填开采液压支架和隔离支架,使之能够在形成较大充填空间的同时,减小工作面充填前顶板下沉量。同时阐述了高浓度胶结充填工作面布置形式及充填基本工艺,实现采煤和充填材料凝固平行作业,有效提高了工作面充填效率。 展开更多
关键词 高浓度胶结充填 矿压显现规律 充填液压支架 采出率 充填效率
下载PDF
充填开采工作面矿压显现规律数值模拟分析 被引量:21
18
作者 杨宝贵 李永亮 +3 位作者 宋晓波 李峥 杨鹏飞 李文超 《煤炭工程》 北大核心 2013年第4期69-70,73,共3页
为了研究充填开采工作面矿压显现规律,以新阳矿10203充填开采工作面为试验背景,运用数值模拟软件,对工作面不同推进距离下,沿倾斜和走向方向的受力以及充填体上覆岩层的垂直位移进行了模拟分析。结果表明:与传统垮落法开采相比,充填开... 为了研究充填开采工作面矿压显现规律,以新阳矿10203充填开采工作面为试验背景,运用数值模拟软件,对工作面不同推进距离下,沿倾斜和走向方向的受力以及充填体上覆岩层的垂直位移进行了模拟分析。结果表明:与传统垮落法开采相比,充填开采来压步距增大,矿压显现缓和;采后及时充填可降低顶板下沉量。 展开更多
关键词 充填开采 数值模拟 矿压显现
下载PDF
矸石-粉煤灰充填采煤覆岩结构与变形规律 被引量:11
19
作者 范超军 李胜 +2 位作者 海龙 杜文璋 杨振华 《地下空间与工程学报》 CSCD 北大核心 2018年第1期117-123,共7页
矸石-粉煤灰充填采煤可解决"三下"压煤和固体废弃物排放造成的环境污染问题。根据充填采煤工作面覆岩移动规律,提出矸石-粉煤灰充填采煤覆岩存在3类结构;在弹性地基薄板理论基础上,建立了基本顶力学模型,推导出了基本顶弯曲... 矸石-粉煤灰充填采煤可解决"三下"压煤和固体废弃物排放造成的环境污染问题。根据充填采煤工作面覆岩移动规律,提出矸石-粉煤灰充填采煤覆岩存在3类结构;在弹性地基薄板理论基础上,建立了基本顶力学模型,推导出了基本顶弯曲下沉的理论公式,给出了基本顶破断的临界条件;据此,分析了基本顶变形影响因素,并进行了工程实践。结果表明,基本顶最大下沉量理论计算值与实测值基本一致,各因素对基本顶弯曲下沉影响大小依次为:基本顶弹性模量、覆岩载荷、直接顶弹性模量、充填体弹性模量。邢台矿7606工作面采空区基本顶的最大下沉量为234 mm,沿专用铁路线地表最大下沉量为16 mm,仅直接顶产生了局部裂隙和离层,基本顶完整性较好,覆岩属于第II类结构,地表变形得到了有效控制。 展开更多
关键词 矸石-粉煤灰 充填开采 覆岩结构 变形规律 力学模型
原文传递
智能化高强度开采超长工作面围岩灾变预警技术 被引量:18
20
作者 范志忠 潘黎明 +1 位作者 徐刚 尹希文 《煤炭科学技术》 CAS CSCD 北大核心 2019年第10期125-130,共6页
针对高强度开采工作面矿压显现剧烈,难以精准预测,围岩控制手段薄弱等一系列技术难题,提出基于顶板状态动态感知、片帮形态实时判识及采场多源监测信息相融合的智能化工作面围岩灾变预警策略;开发了工作面顶板状态实时监测与动态感知技... 针对高强度开采工作面矿压显现剧烈,难以精准预测,围岩控制手段薄弱等一系列技术难题,提出基于顶板状态动态感知、片帮形态实时判识及采场多源监测信息相融合的智能化工作面围岩灾变预警策略;开发了工作面顶板状态实时监测与动态感知技术,实现了顶板来压位置、持续时间及来压强度的模式识别;研发基于大数据平台的矿压数据智能自学习技术,结合岩层柱状图可实时反演覆岩关键层断裂、结构形成及失稳等状态,实现工作面顶板大面积来压的精准预测;研发基于三维激光扫描的煤壁稳定性判识技术,可实现煤壁位移变化及节理裂隙演化进程的高精度监测,还可对煤壁失稳后片帮体的形态、位置及片帮强度实现定量化描述,突破以往工作面大面积来压和煤壁片帮无法准确预测的难题;进一步将采煤机割煤速度、支架工作阻力与瓦斯体积分数等采场多源监测信息相互融合,构建工作面回采工艺与煤壁片帮、瓦斯不均衡涌出、顶板大面积失稳垮落耦合联动的智能感知系统;该技术思路在阳煤集团寺家庄矿15106智能化超长工作面得到成功验证,保障了工作面安全。 展开更多
关键词 智能化开采 围岩灾变 煤壁片帮 矿压显现 监测预警 智能矿山
下载PDF
上一页 1 2 6 下一页 到第
使用帮助 返回顶部