期刊文献+
共找到25篇文章
< 1 2 >
每页显示 20 50 100
Synthesis Scheme for Low Power Designs Under Timing Constraints 被引量:5
1
作者 王玲 温东新 +1 位作者 杨孝宗 蒋颖涛 《Journal of Semiconductors》 EI CAS CSCD 北大核心 2005年第2期287-293,共7页
To minimize the power consumption with resources operating at multiple voltages a time-constrained algorithm is presented.The input to the scheme is an unscheduled data flow graph (DFG),and timing or resource constrai... To minimize the power consumption with resources operating at multiple voltages a time-constrained algorithm is presented.The input to the scheme is an unscheduled data flow graph (DFG),and timing or resource constraints.Partitioning is considered with scheduling in the proposed algorithm as multiple voltage design can lead to an increase in interconnection complexity at layout level.That is,in the proposed algorithm power consumption is first reduced by the scheduling step,and then the partitioning step takes over to decrease the interconnection complexity.The time-constrained algorithm has time complexity of O(n 2),where n is the number of nodes in the DFG.Experiments with a number of DSP benchmarks show that the proposed algorithm achieves the power reduction under timing constraints by an average of 46 5%. 展开更多
关键词 low power multiple supply voltages partitioning timing constraints SCHEDULING
下载PDF
An intelligent automatic correlation method of oilbearing strata based on pattern constraints:An example of accretionary stratigraphy of Shishen 100 block in Shinan Oilfield of Bohai Bay Basin,East China
2
作者 WU Degang WU Shenghe +1 位作者 LIU Lei SUN Yide 《Petroleum Exploration and Development》 SCIE 2024年第1期180-192,共13页
Aiming at the problem that the data-driven automatic correlation methods which are difficult to adapt to the automatic correlation of oil-bearing strata with large changes in lateral sedimentary facies and strata thic... Aiming at the problem that the data-driven automatic correlation methods which are difficult to adapt to the automatic correlation of oil-bearing strata with large changes in lateral sedimentary facies and strata thickness,an intelligent automatic correlation method of oil-bearing strata based on pattern constraints is formed.We propose to introduce knowledge-driven in automatic correlation of oil-bearing strata,constraining the correlation process by stratigraphic sedimentary patterns and improving the similarity measuring machine and conditional constraint dynamic time warping algorithm to automate the correlation of marker layers and the interfaces of each stratum.The application in Shishen 100 block in the Shinan Oilfield of the Bohai Bay Basin shows that the coincidence rate of the marker layers identified by this method is over 95.00%,and the average coincidence rate of identified oil-bearing strata reaches 90.02% compared to artificial correlation results,which is about 17 percentage points higher than that of the existing automatic correlation methods.The accuracy of the automatic correlation of oil-bearing strata has been effectively improved. 展开更多
关键词 oil-bearing strata automatic correlation contrastive learning stratigraphic sedimentary pattern marker layer similarity measuring machine conditional constraint dynamic time warping algorithm
下载PDF
Missile guidance law design based on free-time convergent error dynamics
3
作者 LIU Yuanhe XIE Nianhao +1 位作者 LI Kebo LIANG Yan’gang 《Journal of Systems Engineering and Electronics》 SCIE CSCD 2024年第5期1315-1325,共11页
To solve the finite-time error-tracking problem in mis-sile guidance,this paper presents a unified design approach through error dynamics and free-time convergence theory.The proposed approach is initiated by establis... To solve the finite-time error-tracking problem in mis-sile guidance,this paper presents a unified design approach through error dynamics and free-time convergence theory.The proposed approach is initiated by establishing a desired model for free-time convergent error dynamics,characterized by its independence from initial conditions and guidance parameters,and adjustable convergence time.This foundation facilitates the derivation of specific guidance laws that integrate constraints such as leading angle,impact angle,and impact time.The theoretical framework of this study elucidates the nuances and synergies between the proposed guidance laws and existing methodologies.Empirical evaluations through simulation comparisons underscore the enhanced accuracy and adaptability of the proposed laws. 展开更多
关键词 guidance design free-time convergence error dynamics approach impact angle constraint impact time constraint
下载PDF
Scheduling algorithm of dual-armed cluster tools with residency time and reentrant constraints 被引量:6
4
作者 周炳海 高忠顺 陈佳 《Journal of Central South University》 SCIE EI CAS 2014年第1期160-166,共7页
To solve the scheduling problem of dual-armed cluster tools for wafer fabrications with residency time and reentrant constraints,a heuristic scheduling algorithm was developed.Firstly,on the basis of formulating sched... To solve the scheduling problem of dual-armed cluster tools for wafer fabrications with residency time and reentrant constraints,a heuristic scheduling algorithm was developed.Firstly,on the basis of formulating scheduling problems domain of dual-armed cluster tools,a non-integer programming model was set up with a minimizing objective function of the makespan.Combining characteristics of residency time and reentrant constraints,a scheduling algorithm of searching the optimal operation path of dual-armed transport module was presented under many kinds of robotic scheduling paths for dual-armed cluster tools.Finally,the experiments were designed to evaluate the proposed algorithm.The results show that the proposed algorithm is feasible and efficient for obtaining an optimal scheduling solution of dual-armed cluster tools with residency time and reentrant constraints. 展开更多
关键词 dual-armed cluster tools scheduling residency time constraints reentrancy heuristic algorithm
下载PDF
Task assignment under constraint of timing sequential for cooperative air combat 被引量:6
5
作者 Chengwei Ruan Zhongliang Zhou +1 位作者 Hongqiang Liu Haiyan Yang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2016年第4期836-844,共9页
According to the previous achievement, the task assignment under the constraint of timing continuity for a cooperative air combat is studied. An extensive task assignment scenario with the background of the cooperativ... According to the previous achievement, the task assignment under the constraint of timing continuity for a cooperative air combat is studied. An extensive task assignment scenario with the background of the cooperative air combat is proposed. The utility and time of executing a task as well as the continuous combat ability are defined. The concept of the matching method of weapon and target is modified based on the analysis of the air combat scenario. The constraint framework is also redefined according to a new objective function. The constraints of timing and continuity are formulated with a new method, at the same time, the task assignment and integer programming models of the cooperative combat are established. Finally, the assignment problem is solved using the integrated linear programming software and the simulation shows that it is feasible to apply this modified model in the cooperative air combat for tasks cooperation and it is also efficient to optimize the resource assignment. 展开更多
关键词 cooperative air combat task assignment timing constraint task utility integer programming
下载PDF
Zircon and Apatite U-Pb Geochronology and Geochemistry of the Mafic Dykes in the Shuangxiwu Area, Northwestern Zhejiang Province: Constraints on the Initial Time of Neoproterozoic Rifting in South China
6
作者 ZHANG Fengfeng WANG Xiaolei 《Acta Geologica Sinica(English Edition)》 SCIE CAS CSCD 2016年第S1期135-,共1页
Previous studies have shown that there are some ca.770–750 Ma mafic dykes at the western segment of the Neoproterozoic Jiangnan orogen(JO),and they represent post-orogenic magmatism due to orogenic collapse(Wang
关键词 Pb Northwestern Zhejiang Province Zircon and Apatite U-Pb Geochronology and Geochemistry of the Mafic Dykes in the Shuangxiwu Area constraints on the Initial Time of Neoproterozoic Rifting in South China
下载PDF
Network-based structure optimization method of the anti-aircraft system 被引量:2
7
作者 ZHAO Qingsong DING Junyi +2 位作者 LI Jichao LI Huachao XIA Boyuan 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2023年第2期374-395,共22页
The anti-aircraft system plays an irreplaceable role in modern combat. An anti-aircraft system consists of various types of functional entities interacting to destroy the hostile aircraft moving in high speed. The con... The anti-aircraft system plays an irreplaceable role in modern combat. An anti-aircraft system consists of various types of functional entities interacting to destroy the hostile aircraft moving in high speed. The connecting structure of combat entities in it is of great importance for supporting the normal process of the system. In this paper, we explore the optimizing strategy of the structure of the anti-aircraft network by establishing extra communication channels between the combat entities.Firstly, the thought of combat network model(CNM) is borrowed to model the anti-aircraft system as a heterogeneous network. Secondly, the optimization objectives are determined as the survivability and the accuracy of the system. To specify these objectives, the information chain and accuracy chain are constructed based on CNM. The causal strength(CAST) logic and influence network(IN) are introduced to illustrate the establishment of the accuracy chain. Thirdly, the optimization constraints are discussed and set in three aspects: time, connection feasibility and budget. The time constraint network(TCN) is introduced to construct the timing chain and help to detect the timing consistency. Then, the process of the multi-objective optimization of the structure of the anti-aircraft system is designed.Finally, a simulation is conducted to prove the effectiveness and feasibility of the proposed method. Non-dominated sorting based genetic algorithm-Ⅱ(NSGA2) is used to solve the multiobjective optimization problem and two other algorithms including non-dominated sorting based genetic algorithm-Ⅲ(NSGA3)and strength Pareto evolutionary algorithm-Ⅱ(SPEA2) are employed as comparisons. The deciders and system builders can make the anti-aircraft system improved in the survivability and accuracy in the combat reality. 展开更多
关键词 anti-aircraft system optimization combat network model(CNM) causal strength(CAST)logic influence network(IN) time constraint network(TCN)
下载PDF
Dwell scheduling algorithm for multifunction phased array radars based on the scheduling gain 被引量:18
8
作者 Cheng Ting He Zishu Tang Ting 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2008年第3期479-485,共7页
A real-time dwell scheduling model, which takes the time and energy constraints into account is founded from the viewpoint of scheduling gain. Scheduling design is turned into a nonlinear programming procedure. The re... A real-time dwell scheduling model, which takes the time and energy constraints into account is founded from the viewpoint of scheduling gain. Scheduling design is turned into a nonlinear programming procedure. The real-time dwell scheduling algorithm based on the scheduling gain is presented with the help of two heuristic rules. The simulation results demonstrate that compared with the conventional adaptive scheduling method, the algorithm proposed not only increases the scheduling gain and the time utility but also decreases the task drop rate. 展开更多
关键词 multifunction phased array radar dwell scheduling pulse interleaving time and energy constraint.
下载PDF
MIMO radar dwell scheduling based on novel pulse interleaving technique 被引量:2
9
作者 Ting Cheng Wenwen Liao Zishu He 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2013年第2期234-241,共8页
According to the signal processing characteristic of MIMO radars,an adaptive dwell scheduling algorithm is proposed.It is based on a novel pulse interleaving technique,which makes full use of transmitting,waiting and ... According to the signal processing characteristic of MIMO radars,an adaptive dwell scheduling algorithm is proposed.It is based on a novel pulse interleaving technique,which makes full use of transmitting,waiting and receiving durations of radar dwells.The utilization of transmitting duration is unique for MIMO radars and is realized through transmitting duration overlapping.Simulation results show that,compared with the conventional scheduling algorithm,the scheduling performance of MIMO radars can be improved effectively by the proposed algorithm,and the scheduling rule can be chosen arbitrarily when using the proposed algorithm. 展开更多
关键词 multiple input multiple output(MIMO) radar dwell scheduling pulse interleaving time constraint energy constraint
下载PDF
A hybrid algorithm based on ILP and genetic algorithm for time-aware test case prioritization 被引量:1
10
作者 Sun Jiaze Wang Gang 《Journal of Southeast University(English Edition)》 EI CAS 2018年第1期28-35,共8页
To solve the problem of time-awarc test case prioritization,a hybrid algorithm composed of integer linear programming and the genetic algorithm(ILP-GA)is proposed.First,the test case suite which cm maximize the number... To solve the problem of time-awarc test case prioritization,a hybrid algorithm composed of integer linear programming and the genetic algorithm(ILP-GA)is proposed.First,the test case suite which cm maximize the number of covered program entities a d satisfy time constraints is selected by integer linea progamming.Secondly,the individual is encoded according to the cover matrices of entities,and the coverage rate of program entities is used as the fitness function and the genetic algorithm is used to prioritize the selected test cases.Five typical open source projects are selected as benchmark programs.Branch and method are selected as program entities,and time constraint percentages a e 25%and 75%.The experimental results show that the ILP-GA convergence has faster speed and better stability than ILP-additional and IP-total in most cases,which contributes to the detection of software defects as early as possible and reduces the software testing costs. 展开更多
关键词 test case prioritization integer linear programming(I LP) genetic algorithm time constraint
下载PDF
Implementing Discretionary Access Control with Time Character in Linux and Performance Analysis 被引量:1
11
作者 谭良 周明天 《Journal of Electronic Science and Technology of China》 CAS 2006年第3期274-280,共7页
DAC (Discretionary Access Control Policy) is access control based on ownership relations between subject and object, the subject can discretionarily decide on that who, by what methods, can access his owns object. I... DAC (Discretionary Access Control Policy) is access control based on ownership relations between subject and object, the subject can discretionarily decide on that who, by what methods, can access his owns object. In this paper, the system time is looked as a basic secure element. The DAC_T (Discretionary Access Control Policy with Time Character) is presented and formalized. The DAC_T resolves that the subject can discretionarily decide that who, on when, can access his owns objects. And then the DAC_T is implemented on Linux based on GFAC (General Framework for Access Control), and the algorithm is put forward. Finally, the performance analysis for the DAC T Linux is carried out. It is proved that the DAC T Linux not only can realize time constraints between subject and object but also can still be accepted by us though its performance have been decreased. 展开更多
关键词 information security access control time constraint discretionary accesscontrol policy
下载PDF
Observation Mode and Region Segmentation of New Generation Geostationary Meteorological Satellite of China 被引量:1
12
作者 Shang Jian Liu Chengbao +2 位作者 Zhao Lei Zhang Zhiqing Yang Lei 《Meteorological and Environmental Research》 CAS 2018年第4期1-4,10,共5页
Three-axis stabilized Fengyun-4 (FY-4) satellite scries is the new generation of geostationary meteorological satellite in China. The ob-servation flexibility brought by three-axis stabilization makes it possible to... Three-axis stabilized Fengyun-4 (FY-4) satellite scries is the new generation of geostationary meteorological satellite in China. The ob-servation flexibility brought by three-axis stabilization makes it possible to design different observation modes for different targets. Important observation modes of the Advanced Geosynchronous Radiation Imager (AGRI), the core instrument onboard FY-4A, are presented, from the earth obser- vation, navigation and calibration perspective. As the time consumed in full disk and hemisphere observations exceed the time limitation, different region segmentation methods are proposed. Results show the methods are effective, and the full disk as well as hemisphere observations can both be accomplished in the given time. Finally the three-region segmentation method and two-region segmentation method are chosen for full disk and hemisphere observations, respectively, in view of the observation instructions' complexity as well as the time consuming. The research results paved the way for the core instrument's daily operation, and have been used in FY-4A in-orbit test. 展开更多
关键词 FY-4 Observation mode Region segmentation Time constraint Full disk Hemisphere observation
下载PDF
Broadcast Scheduling Strategy Based on the Priority of Real-Time Data in a Mobile Environment
13
作者 Yang Jin-cai, Liu Yun-shengSchool of Computer Science and Technology, Huazhong University of Science and Technology , Wuhan 430074, Hu-bei, China 《Wuhan University Journal of Natural Sciences》 EI CAS 2003年第02A期368-372,共5页
Data broadcast is an important data dissemination approach in mobile environment. On broadcast channel, scalability and efficiency of data transmission are satisfied. In a mobile environment, there exists a kind of re... Data broadcast is an important data dissemination approach in mobile environment. On broadcast channel, scalability and efficiency of data transmission are satisfied. In a mobile environment, there exists a kind of real-time database application in which both the transactions and data can have their timing constraints and priorities of different levels. In order to meet the requirement of real-time data disseminating and retrieving, a broadcast scheduling strategy HPF-ED F (Highest Priority First with Earlier Deadline and Frequency) is proposed under the BoD (Broadcast on Demand) model. Using the strategy, data items are scheduled according to their priority the transaction imposed on them or system set for them. The strategy also considers other characteristics of data items such as deadline and popularity of data. The extensive simulation experiments have been conducted to evaluate the performance of the proposed algorithm. Results show that it can achieve excellent performance compared with existing strategies. 展开更多
关键词 mobile computing REAL-TIME timing constraint PRIORITY broadcast scheduling
下载PDF
Economical Requirements Elicitation Techniques During COVID-19: A Systematic Literature Review
14
作者 Tauqeer ul Amin Basit Shahzad +1 位作者 Fazal-e-Amin Muhammad Shoaib 《Computers, Materials & Continua》 SCIE EI 2021年第5期2665-2680,共16页
Requirements elicitation is a fundamental phase of software development in which an analyst discovers the needs of different stakeholders and transforms them into requirements.This phase is cost-and time-intensive,and... Requirements elicitation is a fundamental phase of software development in which an analyst discovers the needs of different stakeholders and transforms them into requirements.This phase is cost-and time-intensive,and a project may fail if there are excessive costs and schedule overruns.COVID-19 has affected the software industry by reducing interactions between developers and customers.Such a lack of interaction is a key reason for the failure of software projects.Projects can also fail when customers do not know precisely what they want.Furthermore,selecting the unsuitable elicitation technique can also cause project failure.The present study,therefore,aimed to identify which requirements elicitation technique is the most cost-effective for large-scale projects when time to market is a critical issue or when the customer is not available.To that end,we conducted a systematic literature review on requirements elicitation techniques.Most primary studies identified introspection as the best technique,followed by survey and brainstorming.This finding suggests that introspection should be the first choice of elicitation technique,especially when the customer is not available or the project has strict time and cost constraints.Moreover,introspection should also be used as the starting point in the elicitation process of a large-scale project,and all known requirements should be elicited using this technique. 展开更多
关键词 COVID-19 software engineering requirements engineering requirements elicitation INTROSPECTION project failure SLR on elicitation techniques large-scale projects economical elicitation techniques costeffective time constraints
下载PDF
Monitoring time property in time-sensitive LSC
15
作者 Haiyang Xu Yi Zhuang Jingjing Gu 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2015年第4期857-867,共11页
In order to accurately describe the software require- ments and automatically extract property formulas, the time prop- erty of the live sequence chart (LSC) is focused. For the time- sensitive LSC (TLSC), the for... In order to accurately describe the software require- ments and automatically extract property formulas, the time prop- erty of the live sequence chart (LSC) is focused. For the time- sensitive LSC (TLSC), the formal syntax and semantic are defined by introducing the formal definitions of clock and timing constraints. The main function of the TLSC is to extract the temporal logic formula, so basic rules and combination rules are proposed to translate the TLSC into the universal fragment of computation tree logic (CTL) formula. To improve the efficiency of model check, transitivity is also used to optimize the formula. The optimization method could reduce the size of the formula under the condition of equivalence. Finally, a case study is introduced to illustrate how to establish the TLSC of requirements. In terms of the proposed transformation rules, the time property formula is extracted from the TLSC, and the design model is assured which is consistent with the property formula. The results show that the method with respect to the automatic extraction of the logic formula from the TLSC can efficiently monitor the time property of software systems. 展开更多
关键词 live sequence chart (LSC) timing constraint temporallogic transformation rule.
下载PDF
Performance Comparison of a QoS Aware Routing Protocol for Wireless Sensor Networks
16
作者 Bhaskar Bhuyan Nityananda Sarma 《Communications and Network》 2016年第1期45-55,共11页
Quality of Service (QoS) in Wireless Sensor Networks (WSNs) is a challenging area of research because of the limited availability of resources in WSNs. The resources in WSNs are processing power, memory, bandwidth, en... Quality of Service (QoS) in Wireless Sensor Networks (WSNs) is a challenging area of research because of the limited availability of resources in WSNs. The resources in WSNs are processing power, memory, bandwidth, energy, communication capacity, etc. Delay is an important QoS parameter for delivery of delay sensitive data in a time constraint sensor network environment. In this paper, an extended version of a delay aware routing protocol for WSNs is presented along with its performance comparison with different deployment scenarios of sensor nodes, taking IEEE802.15.4 as the underlying MAC protocol. The performance evaluation of the protocol is done by simulation using ns-2 simulator. 展开更多
关键词 Wireless Sensor Networks Quality of Service DELAY Time Constraint
下载PDF
Growing Sandpile Problem with Local and Non-Local Boundaries Conditions
17
作者 Urbain Traoré 《Journal of Applied Mathematics and Physics》 2021年第10期2414-2429,共16页
In this paper, we study a class of Prigozhin equation for growing sandpile problem subject to local and a non-local boundary condition. The problem is a generalized model for a growing sandpile problem with Neumann bo... In this paper, we study a class of Prigozhin equation for growing sandpile problem subject to local and a non-local boundary condition. The problem is a generalized model for a growing sandpile problem with Neumann boundary condition (see <a href="#ref1">[1]</a>). By the semi-group theory, we prove the existence and uniqueness of the solution for the model and thanks to a duality method we do the numerical analysis of the problem. We finish our work by doing numerical simulations to validate our theoretical results. 展开更多
关键词 SANDPILE COLLAPSING AVALANCHE Nonlinear Semi-Group Nonlocal Boundary Conditions Euler Discretization in Time Time Dependent Gradient constraints
下载PDF
A method for timing constrained redundant via insertion
18
作者 王俊平 许丹 苏永邦 《Journal of Semiconductors》 EI CAS CSCD 2014年第4期146-150,共5页
Redundant via (RV) insertion is a useful mechanism to enhance via reliability. However, when extra vias are inserted into the design, the circuit timing might be changed. Therefore, how to insert RV under the timing... Redundant via (RV) insertion is a useful mechanism to enhance via reliability. However, when extra vias are inserted into the design, the circuit timing might be changed. Therefore, how to insert RV under the timing constraints is the main challenge. In this paper, we introduce a new model to compute the distance between a RV and the corresponding single via, put forward a new RV type, which is called the long length via (LLV), and then present an improved RV insertion method considering the timing constraints. This computing model can certify that the timing, which is obtained aider inserting a RV, is not greater than the original timing. Meanwhile, the new RV type LLV can increase the possibility of RV insertion; this method provides a global perspective for the RV insertion. Considering the timing constraints, the total redundant via insertion rate is 85.38% in the MIS-based method, while our proposed method can obtain a high insertion rate 88.79% for the tested circuits. 展开更多
关键词 redundant via timing constraints integrated circuit
原文传递
Schedulability Analysis Method of Timing Constraint Petri Nets
19
作者 李慧芳 范玉顺 《Tsinghua Science and Technology》 SCIE EI CAS 2002年第6期596-601,共6页
Timing constraint Petri nets (TCPNs) can be used to model a real-time system specification and to verify the timing behavior of the system. This paper describes the limitations of the reachability analysis method in ... Timing constraint Petri nets (TCPNs) can be used to model a real-time system specification and to verify the timing behavior of the system. This paper describes the limitations of the reachability analysis method in analyzing complex systems for existing TCPNs. Based on further research on the schedulability analysis method with various topology structures, a more general state reachability analysis method is proposed. To meet various requirements of timely response for actual systems, this paper puts forward a heuristic method for selecting decision-spans of transitions and develops a heuristic algorithm for schedulability analysis of TCPNs. Examples are given showing the practicality of the method in the schedulability analysis for real-time systems with various structures. 展开更多
关键词 timing constraint Petri nets schedulability analysis decision-span
原文传递
Accuracy optimization of virtual iterative reduction algorithm under time constraint
20
作者 Luo Zhiyong Liu Xintong +2 位作者 Xu haifeng Xie Zhiqiang Li Jie 《The Journal of China Universities of Posts and Telecommunications》 EI CSCD 2023年第2期49-60,共12页
The factors like production accuracy and completion time are the determinants of the optimal scheduling of the complex products work-flow,so the main research direction of modern work-flow technology is how to assure ... The factors like production accuracy and completion time are the determinants of the optimal scheduling of the complex products work-flow,so the main research direction of modern work-flow technology is how to assure the dynamic balance between the factors.Based on the work-flow technology,restraining the completion time,and analyzing the deficiency of traditional minimum critical path algorithm,a virtual iterative reduction algorithm(VIRA)was proposed,which can improve production accuracy effectively with time constrain.The VIRA with simplification as the core abstracts a virtual task that can predigest the process by combining the complex structures which are cyclic or parallel,finally,by using the virtual task and the other task in the process which is the iterative reduction strategy,determines a path which can make the production accuracy and completion time more balanced than the minimum critical path algorithm.The deadline,the number of tasks,and the number of cyclic structures were used as the factors affecting the performance of the algorithm,changing the influence factors can improve the performance of the algorithm effectively through the analysis of detailed data.Consequently,comparison experiments proved the feasibility of the VIRA. 展开更多
关键词 work-flow virtual iterative reduction time constraint accuracy optimization optimized scheduling
原文传递
上一页 1 2 下一页 到第
使用帮助 返回顶部