Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excav...Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excavation process is dynamically simulated to analyze the stress and strain field status of surrounding rock and segment.The maximum tensile stress of segment ring caused by tunnel construction mainly lies in arch bottom and presents zonal distribution.The stress increases slightly and limitedly in the course of excavation.The maximum and minimum displacements of segment,manifesting as zonal distribution,distribute in arch bottom and vault respectively.The displacements slightly increase with the advance of TBM and gradually tend to stability.展开更多
In situ stress state becomes more and more significant with in-depth research on geodynamics and energy development.However,there has not been an economic and effective method developed to determine deep three-dimensi...In situ stress state becomes more and more significant with in-depth research on geodynamics and energy development.However,there has not been an economic and effective method developed to determine deep three-dimensional in situ stress.The Anelastic Strain Recovery(ASR)method is a newly developed technique that can determine three-dimensional in situ stresses.After the 12 May 2008 Ms8.0 Wenchuan earthquake,the ASR method was used for the first time in China's Mainland to measure the in situ stresses in the WFSD scientific boreholes in Sichuan Province,China.In this paper,the basic procedure of the ASR method is introduced in detail and the compliances of ASR for boring cores are investigated.The results show that the maximum principal stress direction was NW64°at a measured depth(MD)of 1173 m(vertical depth 1151 m)in WFSD-1.The ratio of shear mode to the volume mode compliance of ASR was 2.9.And the three principal stresses at 1173 m MD in WFSD-1are 43,28 and 25 MPa.Combined with stress measurement results determined using other in situ measurement methods along the Longmenshan fault zone,the directions of the maximum horizontal principal stress changes from E-W to NEE-SWW to NWW-SEE when moving from NE to SW along the Longmenshan fault zone.This change is in agreement with the stress regime of the Longmenshan fault zone of the Wenchuan Earthquake,which supports a stress regime consisting predominantly of thrusts in the southwest and strike-slip in the northeast.展开更多
基金Supported by National Natural Science Foundation of China(No.90815019)National Key Basic Research Program of China("973" Program,No.2007CB714101)Key Project in the National Science and Technology Pillar Program during the Eleventh Five-Year Plan Period(No.2006BAB04A13)
文摘Applying stiffness migration method,a 3D finite element mechanical model is established to simulate the excavation and advance processes.By using 3D nonlinear finite element method,the tunnel boring machine(TBM) excavation process is dynamically simulated to analyze the stress and strain field status of surrounding rock and segment.The maximum tensile stress of segment ring caused by tunnel construction mainly lies in arch bottom and presents zonal distribution.The stress increases slightly and limitedly in the course of excavation.The maximum and minimum displacements of segment,manifesting as zonal distribution,distribute in arch bottom and vault respectively.The displacements slightly increase with the advance of TBM and gradually tend to stability.
基金financially supported by the"Wenchuan Earthquake Fault Scientific Drilling"of the National Science and Technology Planning Project,Sinoprobe Deep Exploration in China Project(Grant No.SinoProbe-07)Fundamental Research Fund for Chinese Academy of Geological Sciences(Grant No.SYS1301)+1 种基金Grant-in-Aid for Scientific Research of Japan Society for the Promotion of Science(JSPS)(Grant No.25287134)Ministry of Education,Culture,Sports,Science and Technology(MEXT),Japan(Grant No.21107006)
文摘In situ stress state becomes more and more significant with in-depth research on geodynamics and energy development.However,there has not been an economic and effective method developed to determine deep three-dimensional in situ stress.The Anelastic Strain Recovery(ASR)method is a newly developed technique that can determine three-dimensional in situ stresses.After the 12 May 2008 Ms8.0 Wenchuan earthquake,the ASR method was used for the first time in China's Mainland to measure the in situ stresses in the WFSD scientific boreholes in Sichuan Province,China.In this paper,the basic procedure of the ASR method is introduced in detail and the compliances of ASR for boring cores are investigated.The results show that the maximum principal stress direction was NW64°at a measured depth(MD)of 1173 m(vertical depth 1151 m)in WFSD-1.The ratio of shear mode to the volume mode compliance of ASR was 2.9.And the three principal stresses at 1173 m MD in WFSD-1are 43,28 and 25 MPa.Combined with stress measurement results determined using other in situ measurement methods along the Longmenshan fault zone,the directions of the maximum horizontal principal stress changes from E-W to NEE-SWW to NWW-SEE when moving from NE to SW along the Longmenshan fault zone.This change is in agreement with the stress regime of the Longmenshan fault zone of the Wenchuan Earthquake,which supports a stress regime consisting predominantly of thrusts in the southwest and strike-slip in the northeast.