This paper presents the present status of sulfur dioxide emission from thermal plants in China, tells the main problems existing in its emission control and finally gives out suggestions to the problems, that is, to c...This paper presents the present status of sulfur dioxide emission from thermal plants in China, tells the main problems existing in its emission control and finally gives out suggestions to the problems, that is, to constitute complete standards and regulations and enhancesupervision accordingly.展开更多
In China, a number of power plants are installed with large imported FGD equipment. As from 1990s, China has built several demonstration projects with wet limestone-gypsum, simplified wet limestonegypsum, spray semi-d...In China, a number of power plants are installed with large imported FGD equipment. As from 1990s, China has built several demonstration projects with wet limestone-gypsum, simplified wet limestonegypsum, spray semi-drying, seawater, LIFAC and EBA processes along with vigorous introduction of foreign FGD equipment and technologies. As seen by FGD projects being under invitation for bid, large-sized units will generally be fitted with limestone-gypsum FGD equipment. Although theefficiency of FGD equipment is being raised rapidly, especially that of limestone/gypsum FGD equipment can reach 90%, such a technology has much room for improvement. In the coming ten years, China should exert itself to institute design and construction specification and standards, improve operation and maintenance techniques and develop new materials, etc.展开更多
文摘This paper presents the present status of sulfur dioxide emission from thermal plants in China, tells the main problems existing in its emission control and finally gives out suggestions to the problems, that is, to constitute complete standards and regulations and enhancesupervision accordingly.
文摘In China, a number of power plants are installed with large imported FGD equipment. As from 1990s, China has built several demonstration projects with wet limestone-gypsum, simplified wet limestonegypsum, spray semi-drying, seawater, LIFAC and EBA processes along with vigorous introduction of foreign FGD equipment and technologies. As seen by FGD projects being under invitation for bid, large-sized units will generally be fitted with limestone-gypsum FGD equipment. Although theefficiency of FGD equipment is being raised rapidly, especially that of limestone/gypsum FGD equipment can reach 90%, such a technology has much room for improvement. In the coming ten years, China should exert itself to institute design and construction specification and standards, improve operation and maintenance techniques and develop new materials, etc.