期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
考虑品位不确定性的地下矿山生产计划优化模型 被引量:5
1
作者 黄树巍 胡乃联 +1 位作者 李国清 侯杰 《中国有色金属学报》 EI CAS CSCD 北大核心 2020年第12期2996-3005,共10页
针对传统矿山生产计划编制忽略品位不确定性造成的地质资源风险问题,提出构建基于条件模拟和随机规划的地下矿山生产计划风险集成优化模型。条件模拟以一组等概率的矿体模拟实现反映品位估值的不确定性,并通过随机规划将地质品位风险的... 针对传统矿山生产计划编制忽略品位不确定性造成的地质资源风险问题,提出构建基于条件模拟和随机规划的地下矿山生产计划风险集成优化模型。条件模拟以一组等概率的矿体模拟实现反映品位估值的不确定性,并通过随机规划将地质品位风险的量化评估直接集成到矿山生产计划优化建模过程。在最大化经济收益的同时有效衡量和降低由于地质不确定性带来的风险,提高生产计划的可行性,实现生产计划编制的科学可靠和合理有效。以某地下黄金矿山的生产计划编制为应用案例,对未来12个时期的生产计划进行优化。结果表明:模型在优化经济效益的同时可对地质风险进行有效管控,为矿山生产计划中地质风险评估提供新的方法。 展开更多
关键词 品位不确定性 直接序贯模拟 随机规划 生产计划 地下矿山
下载PDF
Improving performance of open-pit mine production scheduling problem under grade uncertainty by hybrid algorithms
2
作者 Kamyar TOLOUEI Ehsan MOOSAVI +2 位作者 Amir Hossein BANGIAN TABRIZI Peyman AFZAL Abbas AGHAJANI BAZZAZI 《Journal of Central South University》 SCIE EI CAS CSCD 2020年第9期2479-2493,共15页
One of the surface mining methods is open-pit mining,by which a pit is dug to extract ore or waste downwards from the earth’s surface.In the mining industry,one of the most significant difficulties is long-term produ... One of the surface mining methods is open-pit mining,by which a pit is dug to extract ore or waste downwards from the earth’s surface.In the mining industry,one of the most significant difficulties is long-term production scheduling(LTPS)of the open-pit mines.Deterministic and uncertainty-based approaches are identified as the main strategies,which have been widely used to cope with this problem.Within the last few years,many researchers have highly considered a new computational type,which is less costly,i.e.,meta-heuristic methods,so as to solve the mine design and production scheduling problem.Although the optimality of the final solution cannot be guaranteed,they are able to produce sufficiently good solutions with relatively less computational costs.In the present paper,two hybrid models between augmented Lagrangian relaxation(ALR)and a particle swarm optimization(PSO)and ALR and bat algorithm(BA)are suggested so that the LTPS problem is solved under the condition of grade uncertainty.It is suggested to carry out the ALR method on the LTPS problem to improve its performance and accelerate the convergence.Moreover,the Lagrangian coefficients are updated by using PSO and BA.The presented models have been compared with the outcomes of the ALR-genetic algorithm,the ALR-traditional sub-gradient method,and the conventional method without using the Lagrangian approach.The results indicated that the ALR is considered a more efficient approach which can solve a large-scale problem and make a valid solution.Hence,it is more effectual than the conventional method.Furthermore,the time and cost of computation are diminished by the proposed hybrid strategies.The CPU time using the ALR-BA method is about 7.4%higher than the ALR-PSO approach. 展开更多
关键词 open-pit mine long-term production scheduling grade uncertainty augmented Lagrangian relaxation particle swarm optimization algorithm bat algorithm
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部