To minimize the power consumption with resources operating at multiple voltages a time-constrained algorithm is presented.The input to the scheme is an unscheduled data flow graph (DFG),and timing or resource constrai...To minimize the power consumption with resources operating at multiple voltages a time-constrained algorithm is presented.The input to the scheme is an unscheduled data flow graph (DFG),and timing or resource constraints.Partitioning is considered with scheduling in the proposed algorithm as multiple voltage design can lead to an increase in interconnection complexity at layout level.That is,in the proposed algorithm power consumption is first reduced by the scheduling step,and then the partitioning step takes over to decrease the interconnection complexity.The time-constrained algorithm has time complexity of O(n 2),where n is the number of nodes in the DFG.Experiments with a number of DSP benchmarks show that the proposed algorithm achieves the power reduction under timing constraints by an average of 46 5%.展开更多
The roof of a roadway under goal with ultra-close separation consists of thin rock strata and rocks caving in upper goal. Influenced by the mining of the upper coal seam, the roof is loose and broken, and its integ- r...The roof of a roadway under goal with ultra-close separation consists of thin rock strata and rocks caving in upper goal. Influenced by the mining of the upper coal seam, the roof is loose and broken, and its integ- rity is poor. Resin anchored bolts cannot provide an effective anchoring force in such roof conditions. By conducting free expansion tests and field pull-out tests on a hydraulic expansion bolt, this study has ana- lyzed the influencing factors and laws of radial expansion and anchoring force changes in the rod body. This has revealed the anchoring mechanism of such bolts, and has obtained reasonable water injection pressures and suitable drilling diameters (which are 20-25 MPa and 32-35 mm respectively) for the hydraulic expansion bolt (cR28 mm) used in these tests. Based on pull-out tests at different interlayer spacing, the applicability of hydraulic expansion bolts had been verified for controlling the roof of road- ways under goal with ultra-close distance. Combined with the deformation and failure characteristics of the test roadway roof, this paper proposes a united roof-control technology based on the use of hydraulic expansion bolts and advancing intubation for the roof. Engineering practice indicated that the roof of the test roadway did not generate leaking and caving phenomenon, and the amount of roof deformation was controlled to within 150 mm. Maintenance of the roadway roof has been improved significantly, which ensures safe mining in coal seams with ultra-close separation.展开更多
The front abutment pressure of a fully-mechanized workface of 11061 soft coal isolated island of Liangbei Coal Mine was measured and studied using a self-developed mining-induced stress monitoring system associated wi...The front abutment pressure of a fully-mechanized workface of 11061 soft coal isolated island of Liangbei Coal Mine was measured and studied using a self-developed mining-induced stress monitoring system associated with electromagnetic radiation technology, and the effects of abutment pressure distribution on strata behavior we discussed. The results indicate that the miningdnduced influencing distance advanced at the fully-mechanized working face of soft coal isolated island is larger than that at the gen- eral working face at the isolated island, besides the fracture zone in front of working face was widened to some extent, and the influencing range caused by relaxations on both roadways became bigger with the advancing working face. Moreover, it can be indicated that mining has significant effect on strata behav- ior of fully-mechanized working face of soft coal isolated island, which is mostly distributed in the area of stress concentration. The research results have an important reference value for revealing the distribution pattern of the front abutment pressure of a fully-mechanized working face of soft coal isolated island, and controlling the coal-rock dynamic disaster occurrence under similar mining conditions.展开更多
Objective: To explore a new effective approach for treatment of the local irritable symptoms and signs resulted from myoporthosis operation. Methods: 263 cases of radial keratotomy outpatients were divided into contro...Objective: To explore a new effective approach for treatment of the local irritable symptoms and signs resulted from myoporthosis operation. Methods: 263 cases of radial keratotomy outpatients were divided into control group (n=49, 90 eyes) and treatment group (n=214, 412 eyes). Patients of control group were treated with 0.5% Chloramphenicol eye drops, 3 times daily, 1-2 drops/time, and with 0.5% Erythromycine eye ointment every night. In treatment group, patients were treated with acupoint and hand reflection area digital pressing method except with the same eye drops and eye ointment. Body acupoints used were Cuanzhu (BL 2), Yuyao (EX HN 4), Sizhukong (TE 23), Sibai (ST 2) and Taiyang (EX HN 5). The hand reflex areas used were Eye Area, Liver Area, Kidney Area, Spleen Area, Heart Area and Lung Area. Five days constituted a therapeutic course. Results: Following 3 courses (15 days) of treatment, the markedly effective rate and total effective rate of treatment group and control group were 74.51% and 38.89%, 94.17% and 66.67% respectively. There was a significant difference between two groups in the total effective rate (P<0.05), showing the therapeutic effect of treatment group being better than that of control group. Conclusion: Acupoint digital pressing is rather effective in treatment of myoporthosis post operation irritable symptoms and signs.展开更多
文摘To minimize the power consumption with resources operating at multiple voltages a time-constrained algorithm is presented.The input to the scheme is an unscheduled data flow graph (DFG),and timing or resource constraints.Partitioning is considered with scheduling in the proposed algorithm as multiple voltage design can lead to an increase in interconnection complexity at layout level.That is,in the proposed algorithm power consumption is first reduced by the scheduling step,and then the partitioning step takes over to decrease the interconnection complexity.The time-constrained algorithm has time complexity of O(n 2),where n is the number of nodes in the DFG.Experiments with a number of DSP benchmarks show that the proposed algorithm achieves the power reduction under timing constraints by an average of 46 5%.
基金supports from the National Natural Science Foundation of China (Nos. 51204166 and 51174195)the Advantage Disciplines Construction Fund Program of Jiangsu Universities (No. SZBF2011-6-B35)
文摘The roof of a roadway under goal with ultra-close separation consists of thin rock strata and rocks caving in upper goal. Influenced by the mining of the upper coal seam, the roof is loose and broken, and its integ- rity is poor. Resin anchored bolts cannot provide an effective anchoring force in such roof conditions. By conducting free expansion tests and field pull-out tests on a hydraulic expansion bolt, this study has ana- lyzed the influencing factors and laws of radial expansion and anchoring force changes in the rod body. This has revealed the anchoring mechanism of such bolts, and has obtained reasonable water injection pressures and suitable drilling diameters (which are 20-25 MPa and 32-35 mm respectively) for the hydraulic expansion bolt (cR28 mm) used in these tests. Based on pull-out tests at different interlayer spacing, the applicability of hydraulic expansion bolts had been verified for controlling the roof of road- ways under goal with ultra-close distance. Combined with the deformation and failure characteristics of the test roadway roof, this paper proposes a united roof-control technology based on the use of hydraulic expansion bolts and advancing intubation for the roof. Engineering practice indicated that the roof of the test roadway did not generate leaking and caving phenomenon, and the amount of roof deformation was controlled to within 150 mm. Maintenance of the roadway roof has been improved significantly, which ensures safe mining in coal seams with ultra-close separation.
基金supported by the National Natural Science Foundation of China (Nos. 40874070,40904028 and 51104156)the Self-Researched Subject of State Key Laboratory of Coal Resources and Mine Safety (No. SKLCRSM09X01)the Specialized Fund for the Basic Research Operating Expenses Program of Central College (No. 2010QNB01)
文摘The front abutment pressure of a fully-mechanized workface of 11061 soft coal isolated island of Liangbei Coal Mine was measured and studied using a self-developed mining-induced stress monitoring system associated with electromagnetic radiation technology, and the effects of abutment pressure distribution on strata behavior we discussed. The results indicate that the miningdnduced influencing distance advanced at the fully-mechanized working face of soft coal isolated island is larger than that at the gen- eral working face at the isolated island, besides the fracture zone in front of working face was widened to some extent, and the influencing range caused by relaxations on both roadways became bigger with the advancing working face. Moreover, it can be indicated that mining has significant effect on strata behav- ior of fully-mechanized working face of soft coal isolated island, which is mostly distributed in the area of stress concentration. The research results have an important reference value for revealing the distribution pattern of the front abutment pressure of a fully-mechanized working face of soft coal isolated island, and controlling the coal-rock dynamic disaster occurrence under similar mining conditions.
文摘Objective: To explore a new effective approach for treatment of the local irritable symptoms and signs resulted from myoporthosis operation. Methods: 263 cases of radial keratotomy outpatients were divided into control group (n=49, 90 eyes) and treatment group (n=214, 412 eyes). Patients of control group were treated with 0.5% Chloramphenicol eye drops, 3 times daily, 1-2 drops/time, and with 0.5% Erythromycine eye ointment every night. In treatment group, patients were treated with acupoint and hand reflection area digital pressing method except with the same eye drops and eye ointment. Body acupoints used were Cuanzhu (BL 2), Yuyao (EX HN 4), Sizhukong (TE 23), Sibai (ST 2) and Taiyang (EX HN 5). The hand reflex areas used were Eye Area, Liver Area, Kidney Area, Spleen Area, Heart Area and Lung Area. Five days constituted a therapeutic course. Results: Following 3 courses (15 days) of treatment, the markedly effective rate and total effective rate of treatment group and control group were 74.51% and 38.89%, 94.17% and 66.67% respectively. There was a significant difference between two groups in the total effective rate (P<0.05), showing the therapeutic effect of treatment group being better than that of control group. Conclusion: Acupoint digital pressing is rather effective in treatment of myoporthosis post operation irritable symptoms and signs.