期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
回采工作面过地质构造带技术研究 被引量:2
1
作者 李君建 《山西冶金》 CAS 2019年第1期80-82,共3页
以某矿1300工作面为研究对象,分析了工作面回采过地质构造带时断层、陷落柱等影响机制,并对回采工作面过地质构造带技术研究,采用爆破破岩技术进行工作回采,并及时对工作面支护、卸压以及防突水,避免工作面过地质构造带时出现安全事故,... 以某矿1300工作面为研究对象,分析了工作面回采过地质构造带时断层、陷落柱等影响机制,并对回采工作面过地质构造带技术研究,采用爆破破岩技术进行工作回采,并及时对工作面支护、卸压以及防突水,避免工作面过地质构造带时出现安全事故,保障工作面安全回采。 展开更多
关键词 地质构造带 破岩支护 安全回采
下载PDF
Study on mechanism and practice of surrounding rock control of high stress coal roadway
2
作者 王卫军 杨磊 欧阳广斌 《Journal of Coal Science & Engineering(China)》 2006年第2期6-10,共5页
The mechanical principle and surrounding rock deformation feature of highstress coal roadway was analyzed.The condition of stress balance of the kind of theroadway was put forward.The surrounding rock control principl... The mechanical principle and surrounding rock deformation feature of highstress coal roadway was analyzed.The condition of stress balance of the kind of theroadway was put forward.The surrounding rock control principle and supporting techniqueof high stress coal roadway were discussed.It was very important to control early daysdeformation of coal sides.The supporting strength is should increased,so the strengthloss of coal sides is decreased.The range of plastic fluid zone is reduced.The abovemention-ned principle is applied in industrial test,and the new supporting technique is ap-plied successfully. 展开更多
关键词 high stress coal roadway surrounding rock control
下载PDF
AN ANALYSIS MODEL OF THE MECHANICS OF JOINTED ROCK MASS
3
作者 邓广哲 张义宽 《Journal of Coal Science & Engineering(China)》 2000年第1期30-36,共7页
The creep fracture damage model of jointed rock mass is proposed, the basic methods and properties of engineering structure forecast analysis in split surrounding rock mass is discussed, numericalized way is analyzed,... The creep fracture damage model of jointed rock mass is proposed, the basic methods and properties of engineering structure forecast analysis in split surrounding rock mass is discussed, numericalized way is analyzed, and the computing program of RCFD rock mechanics problems known is modified.Moreover, this program is used to make practical forecast analysis for the stability of surrounding rock mass of one large section (vertical)shaft which is buried in the earth 300 m deep. 展开更多
关键词 Jointed rock mass creep fraeture damage model vertical shaft
全文增补中
上一页 1 下一页 到第
使用帮助 返回顶部