Along with the increasing integration of renewable energy generation in AC-DC power networks,investigating the dynamic behaviors of this complex system with a proper equivalent model is significant.This paper presents...Along with the increasing integration of renewable energy generation in AC-DC power networks,investigating the dynamic behaviors of this complex system with a proper equivalent model is significant.This paper presents an equivalent modeling method for the AC-DC power networks with doubly-fed induction generator(DFIG)based wind farms to decrease the simulation scale and computational burden.For the AC-DC power networks,the equivalent modeling strategy in accordance with the physical structure simplification is stated.Regarding the DFIG-based wind farms,the equivalent modeling based on the sequential identification of multi-machine parameters using the improved chaotic cuckoo search algorithm(ICCSA)is conducted.In light of the MATLAB simulation platform,a two-zone four-DC interconnected power grid with wind farms is built to check the efficacy of the proposed equivalentmodelingmethod.Fromthe simulation analyses and comparative validation in different algorithms and cases,the proposed method can precisely reflect the steady and dynamic performance of the demonstrated system under N-1 and N-2 fault scenarios,and it can efficiently achieve the parameter identification of the wind farms and fulfill the equivalent modeling.Consequently,the proposed approach’s effectiveness and suitability are confirmed.展开更多
A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the s...A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the safety and reliability of residential electricity consumption.it is necessary to actively plan and modify the distribution network’s structure in the power grid,improve the quality of the distribution network,and optimize the planning of the distribution network,so that the network can be fully utilized to meet the needs of electricity consumption.In this paper,a distribution network grid planning algorithm based on the reliability of electricity consumption was completed using ant colony algorithm.For the distribution network structure planning of dual power sources,the parallel ant colony algorithm was used to prove that the premise of parallelism is the interactive process of ant colonies,and the dual power distribution network structure model is established based on the principle of the lowest cost.The artificial ants in the algorithm were compared with real ants in nature,and the basic steps and working principle of the ant colony optimization algorithm was studied with the help of the travelling salesman problem(TSP).Then,the limitations of the ant colony algorithm were analyzed,and an improvement strategy was proposed by using python for digital simulation.The results demonstrated the reliability of model-building and algorithm improvement.展开更多
This paper proposes a voltage source converter (VSC) -based AC-DC hybrid distribution system (HDS) resilient model to mitigate power outages caused by wildfires. Before a wildfire happens, the public-safety power shut...This paper proposes a voltage source converter (VSC) -based AC-DC hybrid distribution system (HDS) resilient model to mitigate power outages caused by wildfires. Before a wildfire happens, the public-safety power shutoff (PSPS) strategy is applied to actively cut some vulnerable lines which may easily cause wildfires, and reinforce some lines that are connected to critical loads. To mitigate load shedding caused by active line disconnection in the PSPS strategy, network reconfiguration is applied before the wildfire occurrence. During the restoration period, repair crews (RCs) repair faulted lines, and network reconfiguration is also taken into consideration in the recovery strategy to pick up critical loads. Since there exists possible errors in the wildfire prediction, several different scenarios of wildfire occurrence have been taken into consideration, leading to the proposition of a stochastic multi-period resilient model for the VSC-based AC-DC HDS. To accelerate the computational performance, a progressive hedging algorithm has been applied to solve the stochastic model which can be written as a mixed-integer linear program. The proposed model is verified on a 106-bus AC-DC HDS under wildfire conditions, and the result shows the proposed model not only can improve the system resilience but also accelerate computational speed.展开更多
准确的短期光伏功率预测对于保证电能质量及提高电力系统运行可靠性具有重要意义。为此,文章提出了一种基于小波变换和混合深度学习的短期光伏功率预测方法。首先,将天气类型分为理想天气(晴天)和非理想天气(多云、阴天等)。对于理想天...准确的短期光伏功率预测对于保证电能质量及提高电力系统运行可靠性具有重要意义。为此,文章提出了一种基于小波变换和混合深度学习的短期光伏功率预测方法。首先,将天气类型分为理想天气(晴天)和非理想天气(多云、阴天等)。对于理想天气,将历史光伏功率时间序列转化为二维图像作为混合深度学习模型(Hybrid Deep Learning Model,HDLM)的输入。对于非理想天气,使用小波变换对历史光伏功率时间序列进行分解,将得到的分量和气象参数转化成三维图像作为HDLM的输入。在HDLM中引入并行结构,由多个并列卷积神经网络和双向长短期记忆网络组成。实验结果表明,在理想天气和非理想天气条件下,所提短期光伏功率预测方法均具有较高的预测精度。展开更多
The analysis and simulation of power system are becoming more and more challenging as the complexity of system topology and components has been increased. In this paper, a hybrid parallel algorithm is proposed for the...The analysis and simulation of power system are becoming more and more challenging as the complexity of system topology and components has been increased. In this paper, a hybrid parallel algorithm is proposed for the real-time electromagnetic transient simulation (EMTS) of integrated power systems containing multiphase machines. The proposed algorithm is com- posed of a novel network partition method called component level parallelization and the Multi-Area Thevenin Equivalent (MATE) method, which extends the flexibility of the network partition in parallel simulation. Moreover, several methods are developed to enhance the efficiency of the communication and computation. Power systems with up to 410 single-phase elec- trical nodes and 336 switches are simulated in a time step of 50 ~ts to validate the proposed algorithm.展开更多
基金supported by the Science and Technology Project of Central China Branch of State Grid Corporation of China under 5214JS220010.
文摘Along with the increasing integration of renewable energy generation in AC-DC power networks,investigating the dynamic behaviors of this complex system with a proper equivalent model is significant.This paper presents an equivalent modeling method for the AC-DC power networks with doubly-fed induction generator(DFIG)based wind farms to decrease the simulation scale and computational burden.For the AC-DC power networks,the equivalent modeling strategy in accordance with the physical structure simplification is stated.Regarding the DFIG-based wind farms,the equivalent modeling based on the sequential identification of multi-machine parameters using the improved chaotic cuckoo search algorithm(ICCSA)is conducted.In light of the MATLAB simulation platform,a two-zone four-DC interconnected power grid with wind farms is built to check the efficacy of the proposed equivalentmodelingmethod.Fromthe simulation analyses and comparative validation in different algorithms and cases,the proposed method can precisely reflect the steady and dynamic performance of the demonstrated system under N-1 and N-2 fault scenarios,and it can efficiently achieve the parameter identification of the wind farms and fulfill the equivalent modeling.Consequently,the proposed approach’s effectiveness and suitability are confirmed.
文摘A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the safety and reliability of residential electricity consumption.it is necessary to actively plan and modify the distribution network’s structure in the power grid,improve the quality of the distribution network,and optimize the planning of the distribution network,so that the network can be fully utilized to meet the needs of electricity consumption.In this paper,a distribution network grid planning algorithm based on the reliability of electricity consumption was completed using ant colony algorithm.For the distribution network structure planning of dual power sources,the parallel ant colony algorithm was used to prove that the premise of parallelism is the interactive process of ant colonies,and the dual power distribution network structure model is established based on the principle of the lowest cost.The artificial ants in the algorithm were compared with real ants in nature,and the basic steps and working principle of the ant colony optimization algorithm was studied with the help of the travelling salesman problem(TSP).Then,the limitations of the ant colony algorithm were analyzed,and an improvement strategy was proposed by using python for digital simulation.The results demonstrated the reliability of model-building and algorithm improvement.
基金supported in part by National Key Research and Development Program of China(2022YFA1004600)in part by the National Natural Science Foundation of China(51977166,52277123)in part by the Natural Science Foundation of Shaanxi Province(2022JC-19)。
文摘This paper proposes a voltage source converter (VSC) -based AC-DC hybrid distribution system (HDS) resilient model to mitigate power outages caused by wildfires. Before a wildfire happens, the public-safety power shutoff (PSPS) strategy is applied to actively cut some vulnerable lines which may easily cause wildfires, and reinforce some lines that are connected to critical loads. To mitigate load shedding caused by active line disconnection in the PSPS strategy, network reconfiguration is applied before the wildfire occurrence. During the restoration period, repair crews (RCs) repair faulted lines, and network reconfiguration is also taken into consideration in the recovery strategy to pick up critical loads. Since there exists possible errors in the wildfire prediction, several different scenarios of wildfire occurrence have been taken into consideration, leading to the proposition of a stochastic multi-period resilient model for the VSC-based AC-DC HDS. To accelerate the computational performance, a progressive hedging algorithm has been applied to solve the stochastic model which can be written as a mixed-integer linear program. The proposed model is verified on a 106-bus AC-DC HDS under wildfire conditions, and the result shows the proposed model not only can improve the system resilience but also accelerate computational speed.
文摘准确的短期光伏功率预测对于保证电能质量及提高电力系统运行可靠性具有重要意义。为此,文章提出了一种基于小波变换和混合深度学习的短期光伏功率预测方法。首先,将天气类型分为理想天气(晴天)和非理想天气(多云、阴天等)。对于理想天气,将历史光伏功率时间序列转化为二维图像作为混合深度学习模型(Hybrid Deep Learning Model,HDLM)的输入。对于非理想天气,使用小波变换对历史光伏功率时间序列进行分解,将得到的分量和气象参数转化成三维图像作为HDLM的输入。在HDLM中引入并行结构,由多个并列卷积神经网络和双向长短期记忆网络组成。实验结果表明,在理想天气和非理想天气条件下,所提短期光伏功率预测方法均具有较高的预测精度。
基金supported by the National Natural Science Foundation of China (Grant Nos. 51277104,51207076)the Postdoctoral Science Foundation of China (Grant No. 20110490351)
文摘The analysis and simulation of power system are becoming more and more challenging as the complexity of system topology and components has been increased. In this paper, a hybrid parallel algorithm is proposed for the real-time electromagnetic transient simulation (EMTS) of integrated power systems containing multiphase machines. The proposed algorithm is com- posed of a novel network partition method called component level parallelization and the Multi-Area Thevenin Equivalent (MATE) method, which extends the flexibility of the network partition in parallel simulation. Moreover, several methods are developed to enhance the efficiency of the communication and computation. Power systems with up to 410 single-phase elec- trical nodes and 336 switches are simulated in a time step of 50 ~ts to validate the proposed algorithm.