期刊文献+
共找到8篇文章
< 1 >
每页显示 20 50 100
Thermal performance of cast-in-place piles with artificial ground freezing in permafrost regions
1
作者 WANG Xinbin CHEN Kun +3 位作者 YU Qihao GUO Lei YOU Yanhui JIN Mingyang 《Journal of Mountain Science》 SCIE CSCD 2024年第4期1307-1328,共22页
During the construction of cast-in-place piles in warm permafrost,the heat carried by concrete and the cement hydration reaction can cause strong thermal disturbance to the surrounding permafrost.Since the bearing cap... During the construction of cast-in-place piles in warm permafrost,the heat carried by concrete and the cement hydration reaction can cause strong thermal disturbance to the surrounding permafrost.Since the bearing capacity of the pile is quite small before the full freeze-back,the quick refreezing of the native soils surrounding the cast-in-place pile has become the focus of the infrastructure construction in permafrost.To solve this problem,this paper innovatively puts forward the application of the artificial ground freezing(AGF)method at the end of the curing period of cast-in-place piles in permafrost.A field test on the AGF was conducted at the Beiluhe Observation and Research Station of Frozen Soil Engineering and Environment(34°51.2'N,92°56.4'E)in the Qinghai Tibet Plateau(QTP),and then a 3-D numerical model was established to investigate the thermal performance of piles using AGF under different engineering conditions.Additionally,the long-term thermal performance of piles after the completion of AGF under different conditions was estimated.Field experiment results demonstrate that AGF is an effective method to reduce the refreezing time of the soil surrounding the piles constructed in permafrost terrain,with the ability to reduce the pile-soil interface temperatures to below the natural ground temperature within 3 days.Numerical results further prove that AGF still has a good cooling effect even under unfavorable engineering conditions such as high pouring temperature,large pile diameter,and large pile length.Consequently,the application of this method is meaningful to save the subsequent latency time and solve the problem of thermal disturbance in pile construction in permafrost.The research results are highly relevant for the spread of AGF technology and the rapid building of pile foundations in permafrost. 展开更多
关键词 Permafrost engineering cast-in-place pile Artificial ground freezing Thermal performance.
原文传递
Field observation of the thermal disturbance and freezeback processes of cast-in-place pile foundations in warm permafrost regions
2
作者 Xin Hou Ji Chen +4 位作者 YouQian Liu PengFei Rui JingYi Zhao ShouHong Zhang HaiMing Dang 《Research in Cold and Arid Regions》 CSCD 2023年第1期18-26,共9页
The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the therm... The bearing capacity of pile foundations is affected by the temperature of the frozen soil around pile foundations.The construction process and the hydration heat of cast-in-place(CIP)pile foundations affect the thermal stability of permafrost.In this paper,temperature data from inside multiple CIP piles,borehole observations of ground thermal status adjacent to the foundations and local weather stations were monitored in warm permafrost regions to study the thermal influence process of CIP pile foundations.The following conclusions are drawn from the field observation data.(1)The early temperature change process of different CIP piles is different,and the differences gradually diminish over time.(2)The initial concrete temperature is linearly related with the air temperature,net radiation and wind speed within 1 h before the completion of concrete pouring;the contributions of the air temperature,net radiation,and wind speed to the initial concrete temperature are 51.9%,20.3%and 27.9%,respectively.(3)The outer boundary of the thermal disturbance annulus is approximately 2 m away from the pile center.It took more than 224 days for the soil around the CIP piles to return to the natural permafrost temperature at the study site. 展开更多
关键词 PERMAFROST cast-in-place pile foundations Thermal disturbance Freezeback process Initial concrete temperature
下载PDF
Physical modeling of behaviors of cast-in-place concrete piled raft compared to free-standing pile group in sand 被引量:1
3
作者 Mehdi Sharafkhah Issa Shooshpasha 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2018年第4期703-716,共14页
Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies i... Similar to free-standing pile groups, piled raft foundations are conventionally designed in which the piles carry the total load of structure and the raft bearing capacity is not taken into account. Numerous studies indicated that this method is too conservative. Only when the pile cap is elevated from the ground level,the raft bearing contribution can be neglected. In a piled raft foundation, pileesoileraft interaction is complicated. Although several numerical studies have been carried out to analyze the behaviors of piled raft foundations, very few experimental studies are reported in the literature. The available laboratory studies mainly focused on steel piles. The present study aims to compare the behaviors of piled raft foundations with free-standing pile groups in sand, using laboratory physical models. Cast-in-place concrete piles and concrete raft are used for the tests. The tests are conducted on single pile, single pile in pile group, unpiled raft, free-standing pile group and piled raft foundation. We examine the effects of the number of piles, the pile installation method and the interaction between different components of foundation. The results indicate that the ultimate bearing capacity of the piled raft foundation is considerably higher than that of the free-standing pile group with the same number of piles. With installation of the single pile in the group, the pile bearing capacity and stiffness increase. Installation of the piles beneath the raft decreases the bearing capacity of the raft. When the raft bearing capacity is not included in the design process, the allowable bearing capacity of the piled raft is underestimated by more than 200%. This deviation intensifies with increasing spacing of the piles. 展开更多
关键词 FREE-STANDING PILE group Piled RAFT Pileesoileraft interaction PHYSICAL modeling cast-in-place concrete PILES
下载PDF
Field study of plastic tube cast-in-place concrete pile
4
作者 陈永辉 曹德洪 +2 位作者 王新泉 杜海伟 张霆 《Journal of Central South University》 SCIE EI CAS 2008年第S2期195-202,共8页
The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on sin... The compositions, technical principles and construction equipments of a new piling method used for ground improvement plastic tube cast-in-place concrete pile were introduced. The results from static load tests on single piles with different forms of pile shoes and on their composite foundations were analyzed. The distribution patterns of axial force, shaft friction and toe resistance were studied based on the measurements taken from buried strain gauges. From the point of engineering application, the pile has merits in convenient quality control, high bearing capacity and reliable quality, showing higher reasonability, advancement and suitability than other ground improvement methods. The pile can be adopted properly to take place of ordinary ground improvement method, achieving greater economical and social benefits. 展开更多
关键词 plastic tube cast-in-place concrete PILE SOFT ground improvement pile-supported type REINFORCED EMBANKMENT CONSTRUCTION equipment CONSTRUCTION workmanship
下载PDF
Seismic performance of precast bridge columns connected with grouted corrugated-metal duct through biaxial quasi-static experiment and modeling 被引量:3
5
作者 Xia Zhanghua Lin Shangshun +2 位作者 He Yongbo Ge Jiping Sun Jinlei 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2021年第3期747-770,共24页
In this paper,the seismic behaviors of precast bridge columns connected with grouted corrugated-metal duct(GCMD)were investigated through the biaxial quasi-static experiment and numerical simulation.With a geometric s... In this paper,the seismic behaviors of precast bridge columns connected with grouted corrugated-metal duct(GCMD)were investigated through the biaxial quasi-static experiment and numerical simulation.With a geometric scale ratio of 1:5,five specimens were fabricated,including four precast bridge columns connected with GCMD and one cast-in-place(CIP)bridge column.A finite element analysis model was also established by using OpenSees and was then calibrated by using the experimental results for parameter analysis.The results show the biaxial seismic performance of the precast bridge columns connected with GCMD was similar to the CIP bridge columns regarding ultimate bearing capacity and hysteresis energy,and further,that it could meet the design goal of equivalent performance.The seismic performance of the precast bridge columns connected with GCMD deteriorated more significantly under bi-directional load than under uni-directional load.A proper slenderness ratio(e.g.,7.0-10.0)and longitudinal reinforcement ratio could significantly improve the energy dissipation capacity and deformation capacity of the precast bridge columns,while the axial load ratio and concrete strength had little influence on the above properties.The research results could bring insights to the development of the seismic design of precast bridge columns connected with GCMD. 展开更多
关键词 precast bridge column cast-in-place column grouted corrugated-metal duct connection biaxial quasi-static test seismic performance hysteresis energy
下载PDF
青藏铁路多年冻土区钻孔桩基础个别问题探讨及设计对策(英文) 被引量:1
6
作者 高翰青 《冰川冻土》 CSCD 北大核心 2004年第S1期194-196,共3页
Part of soil around cast-in-place pile will thaw because the heat of hydration produced by concrete during construction. In this paper soil upfreezing action to pile during refreezing process is analyzed, and the meas... Part of soil around cast-in-place pile will thaw because the heat of hydration produced by concrete during construction. In this paper soil upfreezing action to pile during refreezing process is analyzed, and the measures to the action are put forward. Furthermore, soil frictional forces to pile due to the thawing of part of soil around pile and the slowness of refreezing after construction is discussed and a rational method is suggested. 展开更多
关键词 cast-in-place PILE REFREEZING of soil upfreezing action DRILL frictional PILE
下载PDF
Complex variable solution for boundary value problem with X-shaped cavity in plane elasticity and its application*
7
作者 Hang ZHOU 《Applied Mathematics and Mechanics(English Edition)》 SCIE EI CSCD 2017年第9期1329-1346,共18页
A new type of displacement pile, the X-section cast-in-place concrete(XCC)pile, has recently been developed in China. Extensive field tests and laboratory experiments are undertaken to evaluate its performance and qua... A new type of displacement pile, the X-section cast-in-place concrete(XCC)pile, has recently been developed in China. Extensive field tests and laboratory experiments are undertaken to evaluate its performance and quantify the non-uniform deformation effect(NUDE) of the X-shaped cross section during installation. This paper develops a simplified theoretical model that attempts to capture the NUDE. Based on the theory of complex variable plane elasticity, closed-form solutions of the stress and displacement for the X-shaped cavity boundary value problem are given. Subsequently, the analytical solution is used to evaluate the NUDE, the concrete filling index(CFI), and the perimeter reduction coefficient of the XCC pile cross section. The computed results are compared with field test results, showing reasonable agreement. The present simplified theoretical model reveals the deformation mechanism of the X-shaped cavity and facilitates application of the newly developed XCC pile technique in geotechnical engineering. 展开更多
关键词 复杂可变答案 边界价值问题 飞机弹性 X cast-in-place 水泥(XCC ) 堆积 变丑机制 理论学习 O344.3 74B05
下载PDF
Application of a concrete thermal pile in cooling the warming permafrost under climate change
8
作者 Yun-Hu SHANG Fu-Jun NIU +2 位作者 Guo-Yu LI Jian-Hong FANG Ze-Yong GAO 《Advances in Climate Change Research》 SCIE 2024年第1期170-183,共14页
Permafrost degradation caused by climate warming is posing a serious threat to the stability of cast-in-place pile foundations in warm permafrost regions.Ambient cold energy can be effectively utilized by two-phase cl... Permafrost degradation caused by climate warming is posing a serious threat to the stability of cast-in-place pile foundations in warm permafrost regions.Ambient cold energy can be effectively utilized by two-phase closed thermosyphons(TPCTs)to cool the permafrost.Therefore,we installed TPCTs in a cast-in-place pile foundation to create a unique structure called a thermal pile,which effectively utilizes the TPCTs to regulate ground temperature.And we conducted a case study and numerical simulation to exhibit the cooling performance,and optimize the structure of the thermal pile.The purpose of this study is to promote the application of thermal piles in unstable permafrost regions.Based on the findings,the thermal pile operated for approximately 53%of the entire year and effectively reduced the deep ground temperature at a rate of at least-0.1℃per year.Additionally,it successfully raised the permafrost table that is 0.35 m shallower than the natural ground level.These characteristics prove highly beneficial in mitigating the adverse effects of permafrost degradation and enhancing infrastructure safety.Expanding the length of the condenser section and the diameter of the TPCT in a suitable manner can effectively enhance the cooling capability of the thermal pile and ensure the long-term mechanical stability of the pile foundation even under climate warming. 展开更多
关键词 Heat transfer Cold energy Warm permafrost Two-phase closed thermosyphons cast-in-place pile foundation
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部