期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Target for Power Construction in 9th Five-year Plan Period Set-up
1
《Electricity》 1996年第4期19-19,共1页
According to the National Meeting on Power Construction and Cost Control held in Beijing on 26th August 1996, the target for power construction in the period of 9th Five- year Plan is set-up as follows:
关键词 In Target for Power construction in 9th Five-year Plan period Set-up
下载PDF
Trial Demonstration of SupervisionDuring the Quality Guaranteed Period in Construction of Power Plant
2
作者 Peng Shumei Yu Baoxing(Northwest Electric Beijing-Sargent & LundyPower Design Institute Power Engineering Co.. Ltd.) 《Electricity》 1998年第3期34-37,共4页
The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the mon... The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the monitor of the operation and maintenance of power plant,organization of subcontractor to treat the problems and defects occurred in the field in time, technical consultancy and communication in time, delivery of spare parts, and assistance of clearing Contractor’s quality deposit. It is proved by the practice that it is necessary to early out the supervision during quality guaranteed period. 展开更多
关键词 Trial Demonstration of SupervisionDuring the Quality Guaranteed period in construction of Power Plant
下载PDF
Risk Assessment and Prediction of Construction Project Based on 1D-CNN-Attention-BP
3
作者 Yawen Zhong 《World Journal of Engineering and Technology》 2021年第4期861-876,共16页
In order to solve the problem of low accuracy of construction project duration prediction, this paper proposes a CNN attention BP combination model </span><span style="font-family:"white-space:... In order to solve the problem of low accuracy of construction project duration prediction, this paper proposes a CNN attention BP combination model </span><span style="font-family:"white-space:normal;">project risk prediction model based on attention mechanism, one-dimensional </span><span style="font-family:"white-space:normal;">convolutional neural network (1d-cnn) and BP neural network. Firstly, the literature analysis method is used to select the risk evaluation index value of construction project, and the attention mechanism is used to determine the weight of risk factors on construction period prediction;then, BP neural network is used to predict the project duration, and accuracy, cross entropy loss function and F1 score are selected to comprehensively evaluate the performance of 1d-cnn-attention-bp combined model. The experimental results show that the duration risk prediction accuracy of the risk prediction model proposed in this paper is more than 90%, which can meet the risk prediction of construction projects with high accuracy. 展开更多
关键词 construction Project Risk 1D-CNN-Attention-BP One Dimensional Convolutional Neural Network construction period Forecast Risk Identification
下载PDF
Seepage field distribution and water inflow laws of tunnels in water-rich regions 被引量:6
4
作者 LI Zheng CHEN Zi-quan +2 位作者 HE Chuan MA Chun-chi DUAN Chao-ran 《Journal of Mountain Science》 SCIE CSCD 2022年第2期591-605,共15页
Currently,the water inrush hazards during tunnel construction,the water leakage during tunnel operation,and the accompanying disturbances to the ecological environment have become the main problems that affect the str... Currently,the water inrush hazards during tunnel construction,the water leakage during tunnel operation,and the accompanying disturbances to the ecological environment have become the main problems that affect the structural safety of tunnels in water-rich regions.In this paper,a tunnel seepage model testing system was used to conduct experiments of the grouting circle and primary support with different permeability coefficients.The influences of the supporting structures on the water inflow laws and the distribution of the water pressure in the tunnel were analyzed.With the decrease in the permeability coefficient of the grouting circle or the primary support,the inflow rate of water into the tunnel showed a non-linear decreasing trend.In comparison,the water inflow reduction effect of grouting circle was much better than that of primary support.With the increase of the permeability coefficient of the grouting ring,the water pressure behind the primary lining increases gradually,while the water pressure behind the grouting ring decreases.Thus,the grouting of surrounding rock during the construction of water-rich tunnel can effectively weaken the hydraulic connection,reduce the influence range of seepage,and significantly reduce the decline of groundwater.Meanwhile,the seepage tests at different hydrostatic heads and hydrodynamic heads during tunnel operation period were also conducted.As the hydrostatic head decreased,the water pressure at each characteristic point decreased approximately linearly,and the water inflow rate also had a gradual downward trend.Under the action of hydrodynamic head,the water pressure had an obvious lagging effect,which was not conducive to the stability of the supporting structures,and it could be mitigated by actively regulating the drainage rate.Compared with the hydrostatic head,the hydrodynamic head could change the real-time rate of water inflow to the tunnel and broke the dynamic balance between the water pressure and water inflow rate,thereby affecting the stress state on the supporting structures. 展开更多
关键词 Water-rich tunnel Seepage field distribution Water inflow law construction period Operation period
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部