In view of complex geological characteristics and alternating loading conditions associated with cyclic large amount of gas injection and withdrawal in underground gas storage(UGS) of China, a series of key gas storag...In view of complex geological characteristics and alternating loading conditions associated with cyclic large amount of gas injection and withdrawal in underground gas storage(UGS) of China, a series of key gas storage construction technologies were established, mainly including UGS site selection and evaluation, key index design, well drilling and completion, surface engineering and operational risk warning and assessment, etc. The effect of field application was discussed and summarized. Firstly, trap dynamic sealing capacity evaluation technology for conversion of UGS from the fault depleted or partially depleted gas reservoirs. A key index design method mainly based on the effective gas storage capacity design for water flooded heterogeneous gas reservoirs was proposed. To effectively guide the engineering construction of UGS, the safe well drilling, high quality cementing and high pressure and large flow surface injection and production engineering optimization suitable for long-term alternate loading condition and ultra-deep and ultra-low temperature formation were developed. The core surface equipment like high pressure gas injection compressor can be manufactured by our own. Last, the full-system operational risk warning and assessment technology for UGS was set up. The above 5 key technologies have been utilized in site selection, development scheme design, engineering construction and annual operations of 6 UGS groups, e.g. the Hutubi UGS in Xinjiang. To date, designed main indexes are highly consistent with actural performance, the 6 UGS groups have the load capacity of over 7.5 billion cubic meters of working gas volume and all the storage facilities have been running efficiently and safely.展开更多
The Maopingxi embankment dam with an asphaltic concrete core wall, a top - gradepermonant structure in the first - class structures in acccordance with the Chinese specifications, ispart of the Three Gorges Project. T...The Maopingxi embankment dam with an asphaltic concrete core wall, a top - gradepermonant structure in the first - class structures in acccordance with the Chinese specifications, ispart of the Three Gorges Project. The project management by the owner takes on the responsibilityfor implementation of construction supervision system and strengthening of construction qualitycontrol, organization of technical exchange and staff training, purchase of advanced constructionequipment, preparation of Test Procedures of Asphaltic Concrete in Hydraulic Structures, selection andcontrol of the raw materials for asphaltic concrete, organization of experiments and optimization ofconstructional parameters, and imprivement of construction procedures.展开更多
基金Supported by the CNPC Science and Technology Major Project(2015E-4002)
文摘In view of complex geological characteristics and alternating loading conditions associated with cyclic large amount of gas injection and withdrawal in underground gas storage(UGS) of China, a series of key gas storage construction technologies were established, mainly including UGS site selection and evaluation, key index design, well drilling and completion, surface engineering and operational risk warning and assessment, etc. The effect of field application was discussed and summarized. Firstly, trap dynamic sealing capacity evaluation technology for conversion of UGS from the fault depleted or partially depleted gas reservoirs. A key index design method mainly based on the effective gas storage capacity design for water flooded heterogeneous gas reservoirs was proposed. To effectively guide the engineering construction of UGS, the safe well drilling, high quality cementing and high pressure and large flow surface injection and production engineering optimization suitable for long-term alternate loading condition and ultra-deep and ultra-low temperature formation were developed. The core surface equipment like high pressure gas injection compressor can be manufactured by our own. Last, the full-system operational risk warning and assessment technology for UGS was set up. The above 5 key technologies have been utilized in site selection, development scheme design, engineering construction and annual operations of 6 UGS groups, e.g. the Hutubi UGS in Xinjiang. To date, designed main indexes are highly consistent with actural performance, the 6 UGS groups have the load capacity of over 7.5 billion cubic meters of working gas volume and all the storage facilities have been running efficiently and safely.
文摘The Maopingxi embankment dam with an asphaltic concrete core wall, a top - gradepermonant structure in the first - class structures in acccordance with the Chinese specifications, ispart of the Three Gorges Project. The project management by the owner takes on the responsibilityfor implementation of construction supervision system and strengthening of construction qualitycontrol, organization of technical exchange and staff training, purchase of advanced constructionequipment, preparation of Test Procedures of Asphaltic Concrete in Hydraulic Structures, selection andcontrol of the raw materials for asphaltic concrete, organization of experiments and optimization ofconstructional parameters, and imprivement of construction procedures.