期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Economic optimization of resource-constrained project scheduling:a two-phase metaheuristic approach
1
作者 Angela H.L.CHEN Chiuh-Cheng CHYU 《Journal of Zhejiang University-Science C(Computers and Electronics)》 SCIE EI 2010年第6期481-494,共14页
This paper deals with the problem of project scheduling subject to multiple execution modes with non-renewable resources, and a model that handles some of monetary issues in real world applications.The objective is to... This paper deals with the problem of project scheduling subject to multiple execution modes with non-renewable resources, and a model that handles some of monetary issues in real world applications.The objective is to schedule the activities to maximize the expected net present value(NPV) of the project, taking into account the activity costs, the activity durations, and the cash flows generated by successfully completing an activity.Owing to the combinatorial nature of this problem, the current study develops a hybrid of branch-and-bound procedure and memetic algorithm to enhance both mode assignment and activity scheduling.Modifications for the makespan minimization problem have been made through a set of benchmark problem instances.Algorithmic performance is rated on the maximization of the project NPV and computational results show that the two-phase hybrid metaheuristic performs competitively for all instances of different problem sizes. 展开更多
关键词 Memetic algorithm(MA) Branch and bound(B&B) algorithm net present value(npv) Project scheduling problem
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部