Let U be a (B, A)-bimodule, A and B be rings, and be a formal triangular matrix ring. In this paper, we characterize the structure of relative Ding projective modules over T under some conditions. Furthermore, using t...Let U be a (B, A)-bimodule, A and B be rings, and be a formal triangular matrix ring. In this paper, we characterize the structure of relative Ding projective modules over T under some conditions. Furthermore, using the left global relative Ding projective dimensions of A and B, we estimate the relative Ding projective dimension of a left T-module.展开更多
For sparse storage and quick access to projection matrix based on vector type, this paper proposes a method to solve the problems of the repetitive computation of projection coefficient, the large space occupation and...For sparse storage and quick access to projection matrix based on vector type, this paper proposes a method to solve the problems of the repetitive computation of projection coefficient, the large space occupation and low retrieval efficiency of projection matrix in iterative reconstruction algorithms, which calculates only once the projection coefficient and stores the data sparsely in binary format based on the variable size of library vector type. In the iterative reconstruction process, these binary files are accessed iteratively and the vector type is used to quickly obtain projection coefficients of each ray. The results of the experiments show that the method reduces the memory space occupation of the projection matrix and the computation of projection coefficient in iterative process, and accelerates the reconstruction speed.展开更多
The adaptive generalized matrix projective lag synchronization between two different complex networks with non-identical nodes and different dimensions is investigated in this paper. Based on Lyapunov stability theory...The adaptive generalized matrix projective lag synchronization between two different complex networks with non-identical nodes and different dimensions is investigated in this paper. Based on Lyapunov stability theory and Barbalat's lemma, generalized matrix projective lag synchronization criteria are derived by using the adaptive control method. Furthermore, each network can be undirected or directed, connected or disconnected, and nodes in either network may have identical or different dynamics. The proposed strategy is applicable to almost all kinds of complex networks. In addition, numerical simulation results are presented to illustrate the effectiveness of this method, showing that the synchronization speed is sensitively influenced by the adaptive law strength, the network size, and the network topological structure.展开更多
In this paper we study the perturbation bound of the projection ( W A ) ( W A )+,where both the matrices A and W are given with W positive diagonal and severely stiff.When the perturbed matrix (A)= A + δA satisfy sev...In this paper we study the perturbation bound of the projection ( W A ) ( W A )+,where both the matrices A and W are given with W positive diagonal and severely stiff.When the perturbed matrix (A)= A + δA satisfy several row rank preserving conditions,we derive a new perturbation bound of the projection.展开更多
A new beam broadening synthesis technique for Synthetic Aperture Radar(SAR) antenna array, namely Projection Matrix Algorithm(PMA) is presented. The theory of PMA is introduced firstly, and then the iterative renewed ...A new beam broadening synthesis technique for Synthetic Aperture Radar(SAR) antenna array, namely Projection Matrix Algorithm(PMA) is presented. The theory of PMA is introduced firstly, and then the iterative renewed manner is improved to resolve the unbalance problem under amplitude and phase control. In order to validate the algorithm correct and effective, an actual engineering application example is investigated. The beam synthesis results of 1.0~4.5 times broadening under the phase only control and the amplitude and phase control using improved PMA are given. The results show that the beam directivity, the beam broadening, and the side-lobe level requirements were met. It is demonstrated that the improved PMA was effective and feasible for SAR application.展开更多
To reduce the uncertainty and reworks in complex projects,a novel mechanism is systematically developed in this paper based on two classical design structure matrix(DSM)clustering methods:Loop searching method(LSM)and...To reduce the uncertainty and reworks in complex projects,a novel mechanism is systematically developed in this paper based on two classical design structure matrix(DSM)clustering methods:Loop searching method(LSM)and function searching method(FSM).Specifically,the optimal working areas for the two clustering methods are first obtained quantitatively in terms of non-zero fraction(NZF)and singular value modularity index(SMI),in which the whole working area is divided into six sub-zones.Then,a judgement procedure is proposed for conveniently choosing the optimal DSM clustering method,which makes it easy to determine which DSM clustering method performs better for a given case.Subsequently,a conceptual model is constructed to assist project managers in effectively analyzing the network of projects and greatly reducing reworks in complex projects by defining preventive actions.Finally,the aircraft design process is presented to show how the proposed judgement mechanism can be utilized to reduce the reworks in actual projects.展开更多
This paper deals with the fixed-time adaptive time-varying matrix projective synchronization(ATVMPS)of different dimensional chaotic systems(DDCSs)with time delays and unknown parameters.Firstly,to estimate the unknow...This paper deals with the fixed-time adaptive time-varying matrix projective synchronization(ATVMPS)of different dimensional chaotic systems(DDCSs)with time delays and unknown parameters.Firstly,to estimate the unknown parameters,adaptive parameter updated laws are designed.Secondly,to realize the fixed-time ATVMPS of the time-delayed DDCSs,an adaptive delay-unrelated controller is designed,where time delays of chaotic systems are known or unknown.Thirdly,some simple fixed-time ATVMPS criteria are deduced,and the rigorous proof is provided by employing the inequality technique and Lyapunov theory.Furthermore,the settling time of fixed-time synchronization(Fix-TS)is obtained,which depends only on controller parameters and system parameters and is independent of the system’s initial states.Finally,simulation examples are presented to validate the theoretical analysis.展开更多
In this paper we compute Karmarkar's projections quickly using MoorePenrose g-inverse and matrix factorization. So the computation work of (ATD2A)-1is decreased.
To improve the enterprise resource utilization and shorten the cycle of the whole project portfolio, a scheduling model based on Design Structure Matrix (DSM) is built. By setting the project activity weight index s...To improve the enterprise resource utilization and shorten the cycle of the whole project portfolio, a scheduling model based on Design Structure Matrix (DSM) is built. By setting the project activity weight index system and calculating the activity weight for the project portfolio, the constraint relationship between project portfolio information and resource utilization, as the two dimensions of the DSM, are fully reflected in the sched- ule model to determine the order of these activities of project portfolio. A project portfolio example is given to il- lustrate the applicability and effectiveness of the schedule model.展开更多
为解决传统数字滤波器在有限精度实现时因有限字长(Finite Word Length,FWL)效应导致滤波器性能下降的问题,提出一种L_(2)灵敏度最小化的数字滤波器状态空间实现稀疏化方法.推导前向差分算子数字滤波器结构传输函数及其等效状态空间实现...为解决传统数字滤波器在有限精度实现时因有限字长(Finite Word Length,FWL)效应导致滤波器性能下降的问题,提出一种L_(2)灵敏度最小化的数字滤波器状态空间实现稀疏化方法.推导前向差分算子数字滤波器结构传输函数及其等效状态空间实现,根据可控及可观格莱姆矩阵得到基于相似变换矩阵的L_(2)灵敏度表达式,并进行稀疏化校准,将L_(2)灵敏度最小化问题转换为凸函数求最值问题,求导得到L_(2)灵敏度最小化表达式,代回即得前向差分算子数字滤波器的稀疏化状态空间实现.仿真结果表明,所提方法设计的数字滤波器具有更好的抗FWL效应.展开更多
文摘Let U be a (B, A)-bimodule, A and B be rings, and be a formal triangular matrix ring. In this paper, we characterize the structure of relative Ding projective modules over T under some conditions. Furthermore, using the left global relative Ding projective dimensions of A and B, we estimate the relative Ding projective dimension of a left T-module.
基金National Natural Science Foundation of China(No.6171177)
文摘For sparse storage and quick access to projection matrix based on vector type, this paper proposes a method to solve the problems of the repetitive computation of projection coefficient, the large space occupation and low retrieval efficiency of projection matrix in iterative reconstruction algorithms, which calculates only once the projection coefficient and stores the data sparsely in binary format based on the variable size of library vector type. In the iterative reconstruction process, these binary files are accessed iteratively and the vector type is used to quickly obtain projection coefficients of each ray. The results of the experiments show that the method reduces the memory space occupation of the projection matrix and the computation of projection coefficient in iterative process, and accelerates the reconstruction speed.
文摘The adaptive generalized matrix projective lag synchronization between two different complex networks with non-identical nodes and different dimensions is investigated in this paper. Based on Lyapunov stability theory and Barbalat's lemma, generalized matrix projective lag synchronization criteria are derived by using the adaptive control method. Furthermore, each network can be undirected or directed, connected or disconnected, and nodes in either network may have identical or different dynamics. The proposed strategy is applicable to almost all kinds of complex networks. In addition, numerical simulation results are presented to illustrate the effectiveness of this method, showing that the synchronization speed is sensitively influenced by the adaptive law strength, the network size, and the network topological structure.
文摘In this paper we study the perturbation bound of the projection ( W A ) ( W A )+,where both the matrices A and W are given with W positive diagonal and severely stiff.When the perturbed matrix (A)= A + δA satisfy several row rank preserving conditions,we derive a new perturbation bound of the projection.
文摘A new beam broadening synthesis technique for Synthetic Aperture Radar(SAR) antenna array, namely Projection Matrix Algorithm(PMA) is presented. The theory of PMA is introduced firstly, and then the iterative renewed manner is improved to resolve the unbalance problem under amplitude and phase control. In order to validate the algorithm correct and effective, an actual engineering application example is investigated. The beam synthesis results of 1.0~4.5 times broadening under the phase only control and the amplitude and phase control using improved PMA are given. The results show that the beam directivity, the beam broadening, and the side-lobe level requirements were met. It is demonstrated that the improved PMA was effective and feasible for SAR application.
基金supported by the National Natural Science Foundation of China (Nos. 71471087, 71071076, 61673209)the Funding for Outstanding Doctoral Dissertation in Nanjing University of Aeronautics and Astronautics (No. BCXJ17-11)the Research and Innovation Program for Graduate Education of Jiangsu Province (No. KYZZ160145)
文摘To reduce the uncertainty and reworks in complex projects,a novel mechanism is systematically developed in this paper based on two classical design structure matrix(DSM)clustering methods:Loop searching method(LSM)and function searching method(FSM).Specifically,the optimal working areas for the two clustering methods are first obtained quantitatively in terms of non-zero fraction(NZF)and singular value modularity index(SMI),in which the whole working area is divided into six sub-zones.Then,a judgement procedure is proposed for conveniently choosing the optimal DSM clustering method,which makes it easy to determine which DSM clustering method performs better for a given case.Subsequently,a conceptual model is constructed to assist project managers in effectively analyzing the network of projects and greatly reducing reworks in complex projects by defining preventive actions.Finally,the aircraft design process is presented to show how the proposed judgement mechanism can be utilized to reduce the reworks in actual projects.
基金supported by the National Natural Science Foundation of China under Grant 61977004.This support is gratefully acknowledged.
文摘This paper deals with the fixed-time adaptive time-varying matrix projective synchronization(ATVMPS)of different dimensional chaotic systems(DDCSs)with time delays and unknown parameters.Firstly,to estimate the unknown parameters,adaptive parameter updated laws are designed.Secondly,to realize the fixed-time ATVMPS of the time-delayed DDCSs,an adaptive delay-unrelated controller is designed,where time delays of chaotic systems are known or unknown.Thirdly,some simple fixed-time ATVMPS criteria are deduced,and the rigorous proof is provided by employing the inequality technique and Lyapunov theory.Furthermore,the settling time of fixed-time synchronization(Fix-TS)is obtained,which depends only on controller parameters and system parameters and is independent of the system’s initial states.Finally,simulation examples are presented to validate the theoretical analysis.
文摘In this paper we compute Karmarkar's projections quickly using MoorePenrose g-inverse and matrix factorization. So the computation work of (ATD2A)-1is decreased.
基金supported by National Natural Science Foundation of China under Grant No.71172123Aviation Science Fund under Grant No.2012ZG53083+1 种基金Soft Science Foundation of Shaanxi Province under Grant No.2012KRM85the Funds of NPU for Humanities & Social Sciences and Management Revitalization under Grant No.RW201105
文摘To improve the enterprise resource utilization and shorten the cycle of the whole project portfolio, a scheduling model based on Design Structure Matrix (DSM) is built. By setting the project activity weight index system and calculating the activity weight for the project portfolio, the constraint relationship between project portfolio information and resource utilization, as the two dimensions of the DSM, are fully reflected in the sched- ule model to determine the order of these activities of project portfolio. A project portfolio example is given to il- lustrate the applicability and effectiveness of the schedule model.
文摘稀疏阵列布阵灵活,增大阵列孔径的同时还能减少阵元间耦合,但基于稀疏阵列的传统波达方向估计会导致角度模糊混叠,带来估计精度差和稳健性不足的问题。针对以上问题,提出一种适用于稀疏阵列波达方向估计的加权截断奇异值投影(weighted truncated singular value projection,WT-SVP)的鲁棒矩阵填充算法。在填充迭代过程中根据奇异值的大小分配权重,突出大奇异值包含的阵列信息,减少小奇异值中不必要的噪声信息,从而优化传统奇异值投影算法。该算法可以实现稀疏阵列的孔洞信息恢复,对不连续阵元充分利用,同时WT-SVP填充算法实现了稀疏阵列波达方向估计的高精度、高分辨以及在低信噪比、低快拍时的高鲁棒性。
文摘为解决传统数字滤波器在有限精度实现时因有限字长(Finite Word Length,FWL)效应导致滤波器性能下降的问题,提出一种L_(2)灵敏度最小化的数字滤波器状态空间实现稀疏化方法.推导前向差分算子数字滤波器结构传输函数及其等效状态空间实现,根据可控及可观格莱姆矩阵得到基于相似变换矩阵的L_(2)灵敏度表达式,并进行稀疏化校准,将L_(2)灵敏度最小化问题转换为凸函数求最值问题,求导得到L_(2)灵敏度最小化表达式,代回即得前向差分算子数字滤波器的稀疏化状态空间实现.仿真结果表明,所提方法设计的数字滤波器具有更好的抗FWL效应.