Numerical Simulation Analysis of Welded Joints in Arch Ribs of Large Span Steel Pipe Arch Bridges
1
作者 Deer He Nianchun Deng Xiuning Peng 《Journal of Harbin Institute of Technology(New Series)》 CAS 2024年第3期19-30,共12页
In order to study the residual stress distribution law of welded joints of arch ribs of large-span steel pipe concrete arch bridges,numerical simulation of temperature,stress and strain fields based on ABAQUS for weld... In order to study the residual stress distribution law of welded joints of arch ribs of large-span steel pipe concrete arch bridges,numerical simulation of temperature,stress and strain fields based on ABAQUS for welded joints of arch-ribbed steel tubes using 7-,8-and 9-layer welds is carried out and its accuracy is demonstrated.The steel pipe welding temperature changes,residual stress distribution,different processes residual stress changes in the law,the prediction of post-weld residual stress distribution and deformation are studied in this paper.The results show that the temperature field values and test results are more consistent with the accuracy of numerical simulation of welding,the welding process is mainly in the form of heat transfer;Residual high stresses are predominantly distributed in the Fusion zone(FZ)and Heat-affected zone(HAZ),with residual stress levels tending to decrease from the center of the weld along the axial path,the maximum stress appears in the FZ and HAZ junction;The number of welding layers has an effect on the residual stress distribution,the number of welding layers increases,the residual stress tends to decrease,while the FZ and HAZ high stress area range shrinks;Increasing the number of plies will increase the amount of residual distortion. 展开更多
关键词 steel pipe and concrete arch bridge arch rib multi-pass welding residual stress numerical simulation
下载PDF
Comparison and Selection of Arch-Rib Construction Schemes for Continuous Beam arch Composite Bridge of High Speed Railway
2
作者 ZHOU Weiming ZHENG Mingda(Translated) 《Chinese Railways》 2023年第2期35-43,共9页
The paper summarizes the four different construction schemes based on engineering cases for the arch rib construction of continuous beam-arch composite bridges for high-speed railways.These methods include in-situ ass... The paper summarizes the four different construction schemes based on engineering cases for the arch rib construction of continuous beam-arch composite bridges for high-speed railways.These methods include in-situ assembly,segmental lifting,incremental launching and longitudinal moving,and vertical rotation.The temporary structural designs,process methods,and technological equipment for each construction scheme are described in detail.The advantages and disadvantages of each scheme and its application scope under various conditions are analyzed,and opinions and suggestions for guiding the application of each scheme are proposed.The comparison and selection analyses show that the four arch rib construction schemes have certain applicability under different conditions such as bridge site status,bridge span,and construction environment.With the continuous increase of bridge span and progress of construction technological equipment,the arch rib construction technology is developing towards the overall erection direction.This leads to more obvious technical advantages of the segmental lifting method,incremental launching and longitudinal moving method,and vertical rotation method.Therefore,it is necessary to select the best construction scheme according to the construction status and technical conditions during application. 展开更多
关键词 high-speed railway(HSR) continuous beam-arch composite bridge arch rib in-situ assembly segmental lifting incremental launching and longitudinal moving vertical rotation
下载PDF
Innovative Design and Development of Simplysupported Tied Arch of Beijing-Shanghai HSR
3
作者 WU Mengchang WEN Wangqing XU Sanping 《Chinese Railways》 2022年第2期60-68,共9页
Simply-supported tied arch is a zero-thrust arch bridge with clear structural force,large stiffness,low height,beautiful appearance and economic efficiency.In Xuzhou-Shanghai section of Beijing-Shanghai HSR,the simply... Simply-supported tied arch is a zero-thrust arch bridge with clear structural force,large stiffness,low height,beautiful appearance and economic efficiency.In Xuzhou-Shanghai section of Beijing-Shanghai HSR,the simply-supported tied arch is systematically studied and widely applied for the first time.A total of 21 simplysupported tied arch bridges with the spans of 96 m,112 m and 128 m respectively are constructed for the route.The simply-supported tied arch is an external static and internal super-static parallel arch or basket arch of Nielsen system in structure;single-box,threechamber and equal-height prestressed concrete box girder is adopted for the tie beam;dumbbell steel pipe concrete section is adopted for the arch rib;PES(FD)low-stress anticorrosion cable body is adopted for the suspender.The rational structural form is determined by comparative study on the key technical parameters such as the layout form of suspender,rise-span ratio and arch axis alignment.This paper summarizes the optimization of simplysupported tied arch structure and looks forward to the development of bridge structure. 展开更多
关键词 Beijing-Shanghai HSR simply-supported tied arch tie beam arch rib SUSPENDER arch foot cross bracing key technical parameters