The stability of an inner dump slope was investigated under the efect of coal pillar support considering the development position of dumping.Based on the instability mechanism and load distribution characteristics of ...The stability of an inner dump slope was investigated under the efect of coal pillar support considering the development position of dumping.Based on the instability mechanism and load distribution characteristics of the supporting coal pillar,the three-dimensional mechanical efects of the supporting coal pillar are characterized.Using the two-dimensional equivalent principle and the residual thrust method,the stability of the inner dump slope was analyzed under the efect of pillar support at diferent dump development positions.The quantitative efects of various factors on the inner dump slope stability were revealed,and the coal pillar shape parameters were optimized through numerical simulations.The results indicate that the slope stability coefcient is linearly related to the top width and height of the coal pillar,slope angle,and base inclination angle,and has an exponential relation with the coal pillar strike length and slope height increment.There are quadratic and absolute value relations with the coal pillar outer and the inner bottom angle,respectively.The top width of the coal pillar in the inner dump of Shengli East No.2 open-pit coal mine should be at a level of+824 m,and the optimal top width and height are 15 and 36.7 m,respectively.The instability mechanism of the supporting and retaining coal pillar obtained by numerical simulations and the stability of the inner dump are in good agreement with the theoretical analysis.Our results provide a theoretical basis for the design,treatment,and safe implementation of similar open-pit mine slope engineering.展开更多
Considering the situation that it is difficult to control the stability of narrow coal pillar in gob-side entry driving under unstable overlying strata, the finite difference numerical simulation method was adopted to...Considering the situation that it is difficult to control the stability of narrow coal pillar in gob-side entry driving under unstable overlying strata, the finite difference numerical simulation method was adopted to analyze the inner stress distribution and its evolution regularity, as well as the deformation characteristics of narrow coal pillar in gob-side entry driving, in the whole process from entry driving of last working face to the present working face mining. A new method of narrow coal pillar control based on the triune coupling support technique (TCST), which includes that high-strength prestressed thread steel bolt is used to strain the coal on the goaf side, and that short bolt to control the integrity of global displacement zone in coal pillar on the entry side, and that long grouting cable to fix anchor point to constrain the bed separation between global displacement zone and fixed zone, is thereby generated and applied to the field production. The result indicates that after entry excavating along the gob under unstable overlying strata, the supporting structure left on the gob side of narrow coal pillar is basically invalid to maintain the coal-pillar stability, and the large deformation of the pillar on the gob side is evident. Except for the significant dynamic pressure appearing in the coal mining of last working face and overlying strata stabilizing process, the stress variation inside the coal pillar in other stages are rather steady, however, the stress expansion is obvious and the coal pillar continues to deform. Once the gob-side entry driving is completed, a global displacement zone on the entry side appears in the shallow part of the pillar, whereas, a relatively steady fixed zone staying almost still in gob-side entry driving and present working face mining is found in the deep part of the pillar. The application of TCST can not only avoid the failure of pillar supporting structure, but exert the supporting capacity of the bolting structure left in the pillar of last sublevel entry, thus to jointly maintain the stability of coal pillar.展开更多
基金supported by the National Natural Science Foundation of China(51874160)Liaoning BaiQianWan Talents Program,and Discipline Innovation Team of Liaoning Technical University(LNTU20TD-01).
文摘The stability of an inner dump slope was investigated under the efect of coal pillar support considering the development position of dumping.Based on the instability mechanism and load distribution characteristics of the supporting coal pillar,the three-dimensional mechanical efects of the supporting coal pillar are characterized.Using the two-dimensional equivalent principle and the residual thrust method,the stability of the inner dump slope was analyzed under the efect of pillar support at diferent dump development positions.The quantitative efects of various factors on the inner dump slope stability were revealed,and the coal pillar shape parameters were optimized through numerical simulations.The results indicate that the slope stability coefcient is linearly related to the top width and height of the coal pillar,slope angle,and base inclination angle,and has an exponential relation with the coal pillar strike length and slope height increment.There are quadratic and absolute value relations with the coal pillar outer and the inner bottom angle,respectively.The top width of the coal pillar in the inner dump of Shengli East No.2 open-pit coal mine should be at a level of+824 m,and the optimal top width and height are 15 and 36.7 m,respectively.The instability mechanism of the supporting and retaining coal pillar obtained by numerical simulations and the stability of the inner dump are in good agreement with the theoretical analysis.Our results provide a theoretical basis for the design,treatment,and safe implementation of similar open-pit mine slope engineering.
基金supports from the National High Technology Research and Development Program of China (No. 2012AA062101)the Program for New Century Excellent Talents in University of Ministry of Education of China (No. NCET-10-0770)+1 种基金the Program Granted for Scientific Innovation Research of College Graduate in Jiangsu Province (No. CXZZ11-0309)the Priority Academic Program Development of Jiangsu Higher Education Institutions (No. SZBF2011-6-B35)
文摘Considering the situation that it is difficult to control the stability of narrow coal pillar in gob-side entry driving under unstable overlying strata, the finite difference numerical simulation method was adopted to analyze the inner stress distribution and its evolution regularity, as well as the deformation characteristics of narrow coal pillar in gob-side entry driving, in the whole process from entry driving of last working face to the present working face mining. A new method of narrow coal pillar control based on the triune coupling support technique (TCST), which includes that high-strength prestressed thread steel bolt is used to strain the coal on the goaf side, and that short bolt to control the integrity of global displacement zone in coal pillar on the entry side, and that long grouting cable to fix anchor point to constrain the bed separation between global displacement zone and fixed zone, is thereby generated and applied to the field production. The result indicates that after entry excavating along the gob under unstable overlying strata, the supporting structure left on the gob side of narrow coal pillar is basically invalid to maintain the coal-pillar stability, and the large deformation of the pillar on the gob side is evident. Except for the significant dynamic pressure appearing in the coal mining of last working face and overlying strata stabilizing process, the stress variation inside the coal pillar in other stages are rather steady, however, the stress expansion is obvious and the coal pillar continues to deform. Once the gob-side entry driving is completed, a global displacement zone on the entry side appears in the shallow part of the pillar, whereas, a relatively steady fixed zone staying almost still in gob-side entry driving and present working face mining is found in the deep part of the pillar. The application of TCST can not only avoid the failure of pillar supporting structure, but exert the supporting capacity of the bolting structure left in the pillar of last sublevel entry, thus to jointly maintain the stability of coal pillar.