期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Dam foundation excavation techniques in China:A review 被引量:4
1
作者 Yuzhu Zhang Wenbo Lu +2 位作者 Ming Chen Peng Yan Yingguo Hu 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2013年第6期460-467,共8页
A protective layer(PL) is commonly reserved above foundation surface to protect the underlying rock mass during dam foundation excavation. In China, the PL of dam foundation is conventionally subdivided into two or th... A protective layer(PL) is commonly reserved above foundation surface to protect the underlying rock mass during dam foundation excavation. In China, the PL of dam foundation is conventionally subdivided into two or three thin layers and excavated with the shallow-hole blasting method, even by pneumatic pick method in case of soft rock mass. The aforementioned layered excavation of the PL delays the construction of the whole project. After nearly 30-year practices, several safe and effcient methods for the PL excavation of dam foundation are gradually developed. They include shallow-hole bench blasting with cushion material(SBC) at the bottom of the hole, and horizontal smooth blasting(HSB). The PL is even cancelled on the condition that horizontal pre-split technique is employed during dam foundation excavation. This paper introduces the aforementioned two PL excavation methods(shallow-hole blasting and bench blasting) and horizontal pre-split technique of dam foundation without protective layer(HPP). The basic principles of blasting method, blasting geometry, charge structure, drill-and-blast parameters of typical projects are examined. Meanwhile, the merits and limitations of each method are compared. Engineering practices in China show that HSB is basically the optimal method for dam foundation PL excavation in terms of foundation damage control and rapid construction. Some new problems for dam foundation PL excavation arising, such as strong unloading and relaxation phenomenon that encountered in the gorge region of southwest China, are needed to be addressed; and the corresponding countermeasures are discussed as well. 展开更多
关键词 dam foundation Protective layer(PL) Excavation Blasting Rapid construction
下载PDF
Forest belt planned to protect dam area
2
《Electricity》 1998年第2期46-46,共1页
关键词 Forest belt planned to protect dam area
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部