Prediction of subsurface settlement induced by shield tunnelling in sandy cobble stratum 被引量:1
1
作者 Fan Wang Xiuli Du Pengfei Li 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第1期192-212,共21页
This study focuses on the analytical prediction of subsurface settlement induced by shield tunnelling in sandy cobble stratum considering the volumetric deformation modes of the soil above the tunnel crown.A series of... This study focuses on the analytical prediction of subsurface settlement induced by shield tunnelling in sandy cobble stratum considering the volumetric deformation modes of the soil above the tunnel crown.A series of numerical analyses is performed to examine the effects of cover depth ratio(C/D),tunnel volume loss rate(h t)and volumetric block proportion(VBP)on the characteristics of subsurface settle-ment trough and soil volume loss.Considering the ground loss variation with depth,three modes are deduced from the volumetric deformation responses of the soil above the tunnel crown.Then,analytical solutions to predict subsurface settlement for each mode are presented using stochastic medium theory.The influences of C/D,h t and VBP on the key parameters(i.e.B and N)in the analytical expressions are discussed to determine the fitting formulae of B and N.Finally,the proposed analytical solutions are validated by the comparisons with the results of model test and numerical simulation.Results show that the fitting formulae provide a convenient and reliable way to evaluate the key parameters.Besides,the analytical solutions are reasonable and available in predicting the subsurface settlement induced by shield tunnelling in sandy cobble stratum. 展开更多
关键词 shield tunnelling Sandy cobble stratum Subsurface settlement Volumetric deformation mode Stochastic medium theory
下载PDF
Ground settlement and tunnel response due to twin-curved shield tunnelling in soft ground with small clear distance
2
作者 Yao Hu Haoran Tang +4 位作者 Yinggang Xu Huayang Lei Peng Zeng Kai Yao Yabo Dong 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第8期3122-3135,共14页
Twin curved tunnels are often encountered in shield tunnelling,where significant complexities in densely exploited underground space are observed.In this study,the ground settlement and tunnel deformation due to twin-... Twin curved tunnels are often encountered in shield tunnelling,where significant complexities in densely exploited underground space are observed.In this study,the ground settlement and tunnel deformation due to twin-curved shield tunnelling in soft ground were investigated using numerical simulation and field monitoring.Different curvature radii of twin curved tunnels and subsequent effects of tunnel construction were considered to reveal the tunnelling effect on ground surface settlement and tunnel deformation.The results show that the settlement trough yields one offset towards inside of curved shield tunnelling.The location of settlement trough and maximum settlement were affected by curvature radius but except for the shape and width of settlement trough.Adjacent parallel twin-curved shield tunnelling could increase the offset of existing settlement trough and maximum settlement.Then,an empirical prediction of surface settlement trough due to twin-curved shield tunnelling with same tunnel diameters in soft clay was proposed,which was applicable to curvature radius less than 800 m.Finally,a minimum radius of 600 m of curvature tunnel was proposed in terms of allowable convergence deformation of tunnel.The result could provide guidance on safety evaluation for twin curved shield tunnelling construction. 展开更多
关键词 shield tunnelling Curvature radius Ground settlement tunnel deformation Numerical simulation
下载PDF
An improved analytical solution for solving the shield tunnel uplift problem
3
作者 Bin Wang Jietao Li +1 位作者 Chenyang Zhao Jun Wang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2024年第11期4570-4585,共16页
The problem of shield tunnel uplift is a common issue in tunnel construction.Due to the decrease in shear stiffness at the joints between the rings,uplift is typically observed as bending and dislocation deformation a... The problem of shield tunnel uplift is a common issue in tunnel construction.Due to the decrease in shear stiffness at the joints between the rings,uplift is typically observed as bending and dislocation deformation at these joints.Existing modeling methods typically rely on the Euler-Bernoulli beam theory,only considering the bending effect while disregarding shear deformation.Furthermore,the constraints on the shield tail are often neglected in existing models.In this study,an improved theoretical model of tunnel floating is proposed.The constraint effect of the shield machine shell on the tunnel structure is considered using the structural forms of two finite long beams and one semi-infinite long beam.Furthermore,the Timoshenko beam theory is adopted,providing a more accurate description of tunnel deformation,including both the bending effect and shear deformation,than existing models.Meanwhile,the buoyancy force and stratum resistance are calculated in a nonlinear manner.A reliable method for calculating the shear stiffness correction factor is proposed to better determination of the calculation parameters.The proposed theoretical model is validated through five cases using sitemonitored data.Its applicability and effectiveness are demonstrated.Furthermore,the influences of soil type,buried depth,and buoyancy force on the three key indicators of tunnel floating(i.e.the maximum uplift magnitude,the ring position with the fastest uplift race,and the ring position with the maximum uplift magnitude)are analyzed.The results indicate that the proposed model can provide a better understanding of the floating characteristics of the tunnel structure during construction. 展开更多
关键词 Analytical solution Conceptual model Matrix transfer method shield tunnel Timoshenko beam theory tunnel uplift
下载PDF
Three-dimensional pseudo-dynamic reliability analysis of seismic shield tunnel faces combined with sparse polynomial chaos expansion
4
作者 GUO Feng-qi LI Shi-wei ZOU Jin-Feng 《Journal of Central South University》 SCIE EI CAS CSCD 2024年第6期2087-2101,共15页
To address the seismic face stability challenges encountered in urban and subsea tunnel construction,an efficient probabilistic analysis framework for shield tunnel faces under seismic conditions is proposed.Based on ... To address the seismic face stability challenges encountered in urban and subsea tunnel construction,an efficient probabilistic analysis framework for shield tunnel faces under seismic conditions is proposed.Based on the upper-bound theory of limit analysis,an improved three-dimensional discrete deterministic mechanism,accounting for the heterogeneous nature of soil media,is formulated to evaluate seismic face stability.The metamodel of failure probabilistic assessments for seismic tunnel faces is constructed by integrating the sparse polynomial chaos expansion method(SPCE)with the modified pseudo-dynamic approach(MPD).The improved deterministic model is validated by comparing with published literature and numerical simulations results,and the SPCE-MPD metamodel is examined with the traditional MCS method.Based on the SPCE-MPD metamodels,the seismic effects on face failure probability and reliability index are presented and the global sensitivity analysis(GSA)is involved to reflect the influence order of seismic action parameters.Finally,the proposed approach is tested to be effective by a engineering case of the Chengdu outer ring tunnel.The results show that higher uncertainty of seismic response on face stability should be noticed in areas with intense earthquakes and variation of seismic wave velocity has the most profound influence on tunnel face stability. 展开更多
关键词 reliability analysis shield tunnel face sparse polynomial chaos expansion modified pseudo-dynamic approach seismic stability assessment
下载PDF
On the critical particle size of soil with clogging potential in shield tunneling 被引量:5
5
作者 Shuying Wang Zihao Zhou +3 位作者 Pengfei Liu Zhao Yang Qiujing Pan Weizhong Chen 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第2期477-485,共9页
Shield tunneling is easily obstructed by clogging in clayey strata with small soil particles.However,soil clogging rarely occurs in strata with coarse-grained soils.Theoretically,a critical particle size of soils shou... Shield tunneling is easily obstructed by clogging in clayey strata with small soil particles.However,soil clogging rarely occurs in strata with coarse-grained soils.Theoretically,a critical particle size of soils should exist,below which there is a high risk of soil clogging in shield tunneling.To determine the critical particle size,a series of laboratory tests was carried out with a large-scale rotary shear apparatus to measure the tangential adhesion strength of soils with different particle sizes and water contents.It was found that the tangential adhesion strength at the soilesteel interface gradually increased linearly with applied normal pressure.When the particle size of the soil specimen was less than 0.15 mm,the interfacial adhesion force first increased and then decreased as the water content gradually increased;otherwise,the soil specimens did not manifest any interfacial adhesion force.The amount of soil mass adhering to the steel disc was positively correlated with the interfacial adhesion force,thus the interfacial adhesion force was adopted to characterize the soil clogging risk in shield tunneling.The critical particle size of soils causing clogging was determined to be 0.15 mm.Finally,the generation mechanism of interfacial adhesion force was explored for soils with different particle sizes to explain the critical particle size of soil with clogging risk in shield tunneling. 展开更多
关键词 shield tunneling Soil clogging ADHESION Critical particle size
下载PDF
Determination of minimum overburden depth for underwater shield tunnel in sands:Comparison between circular and rectangular tunnels 被引量:4
6
作者 Weixin Sun Fucheng Han +4 位作者 Hanlong Liu Wengang Zhang Yanmei Zhang Weijia Su Songlin Liu 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第7期1671-1686,共16页
With the development of global urbanization,the utilization of underground space is more critical and attractive for civil purposes.Various shapes of shield tunnels have been gradually proposed to cope with different ... With the development of global urbanization,the utilization of underground space is more critical and attractive for civil purposes.Various shapes of shield tunnels have been gradually proposed to cope with different geological conditions and service purposes of underground structures.Generally,reducing the burial depth of shield tunnel is conducive to construction and cost saving.However,extremely small overburden depth cannot provide sufficient uplift resistance to maintain the stability and serviceability of the tunnel.To this end,this paper firstly reviewed the status of deriving the minimum sand over-burden depth of circular shield tunnel using mechanical equilibrium(ME)method.It revealed that the estimated depth is rather conservative.Then,the uplift resistance mechanism of both circular and rectangular tunnels was deduced theoretically and verified with the model tests.The theoretical uplift resistance is consistent with the experimental values,indicating the feasibility of the proposed equations.Furthermore,the determination of the minimum soil overburden depth of rectangular shield tunnel under various working conditions was presented through integrated ME method,which can provide more reasonable estimations of suggested tunnel burial depth for practical construction.Additionally,optimizations were made for calculating the uplift resistance,and the soil thickness providing uplift resistance is suggested to be adjusted according to the testing results.The results can provide reference for the design and construction of various shapes of shield tunnels in urban underground space exploitation. 展开更多
关键词 Minimum overburden depth Uplift resistance mechanism shield tunnel shape tunnel anti-floating
下载PDF
Mechanical performances of shield tunnel segments under asymmetric unloading induced by pit excavation 被引量:1
7
作者 Gang Wei Feifan Feng +2 位作者 Chengbao Hu Jiaxuan Zhu Xiao Wang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第6期1547-1564,共18页
To explore the stress and deformation responses,as well as the failure characteristics of the shield tunnel segment of Hangzhou Metro under the influences of pit excavation and other surrounding projects,a self-develo... To explore the stress and deformation responses,as well as the failure characteristics of the shield tunnel segment of Hangzhou Metro under the influences of pit excavation and other surrounding projects,a self-developed“shield tunnel segment hydraulic loading system”was used to carry out full-scale loading tests on the three-ring staggered assembled segments.The structural performances and failure process of the tunnel segment under step-by-step asymmetric unloading were studied.A safety index was proposed to describe the bearing capacity of the segment.Next,a finite element model(FEM)was established to analyze the bearing capacity of segment using the test results.Finally,the effect of reinforcement with a steel plate on the deformation and bearing capacity of the segment was analyzed.The results showed that under asymmetric unloading,the peak value and amplitude of the bending moment on the near unloading side converged with a greater value than those on the far side.The concrete internal force exhibited a directional transformation at different load stages.Cracks first appeared at the 180inner arc surface of the bottom standard block and then expanded to both sides,while the rate of crack propagation of the outer arc surface was relatively lower.The bearing capacity of the segments can be evaluated by the combination of the factors,e.g.the residual bearing capacity coefficient,moment transfer coefficient,and characterization coefficient.The segments approaching failure can facilitate the increase in the residual bearing capacity coefficient by more than 50%.This can provide guidance for the service assessment of metro tunnel operations. 展开更多
关键词 shield tunnel segment Full-scale test Asymmetric unloading Stress and deformation Safety index
下载PDF
Analytical solution for longitudinal deformation of shield tunnel induced by overcrossing tunnelling considering circumferential joints
8
作者 Zhiwei Zhang Rongzhu Liang +4 位作者 Zhongchao Li Cheng Kang MHEl Naggar Mingzhao Xiao Wenbing Wu 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第9期2355-2374,共20页
This paper presents a new analytical solution for assessing the longitudinal deformation of shield tunnel associated with overcrossing tunnelling in consideration of circumferential joints.A simplified longitudinal be... This paper presents a new analytical solution for assessing the longitudinal deformation of shield tunnel associated with overcrossing tunnelling in consideration of circumferential joints.A simplified longitudinal beam-spring model(SLBSM)is established to model the longitudinal behaviours of shield tunnel,which can consider the opening and dislocation between segmental rings simultaneously.Then,the existing tunnel is treated as the SLBSM resting on the elastic foundation.The state equations including tunnel displacements and internal forces are constructed to solve the discontinuous deformation of circumferential joint-segmental ring.The feasibility of the proposed solution is verified through three well-documented cases.The predictions from the proposed method are also compared with other analytical methods.It is found that the proposed method can well capture the deformation of tunnel segmental rings and joints,where the rigid displacement mainly occurs in the segmental rings while the rotation and dislocation occur in the circumferential joints.Some dominant parameters are also analysed to explore the effects on existing tunnel deformation,including the rotation stiffness and shearing stiffness of joints,the skew angle and the clearance between new and old tunnels. 展开更多
关键词 Overcrossing tunnelling shield tunnel Circumferential joints Longitudinal beam-spring model(LBSM) Opening DISLOCATION
下载PDF
Vote-Based Feature Selection Method for Stratigraphic Recognition in Tunnelling Process of Shield Machine
9
作者 Liman Yang Xuze Guo +5 位作者 Jianfu Chen Yixuan Wang Huaixiang Ma Yunhua Li Zhiguo Yang Yan Shi 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2023年第5期141-155,共15页
Shield machines are currently the main tool for underground tunnel construction. Due to the complexity and variability of the underground construction environment, it is necessary to accurately identify the ground in ... Shield machines are currently the main tool for underground tunnel construction. Due to the complexity and variability of the underground construction environment, it is necessary to accurately identify the ground in real-time during the tunnel construction process to match and adjust the tunnel parameters according to the geological conditions to ensure construction safety. Compared with the traditional method of stratum identifcation based on staged drilling sampling, the real-time stratum identifcation method based on construction data has the advantages of low cost and high precision. Due to the huge amount of sensor data of the ultra-large diameter mud-water balance shield machine, in order to balance the identifcation time and recognition accuracy of the formation, it is necessary to screen the multivariate data features collected by hundreds of sensors. In response to this problem, this paper proposes a voting-based feature extraction method (VFS), which integrates multiple feature extraction algorithms FSM, and the frequency of each feature in all feature extraction algorithms is the basis for voting. At the same time, in order to verify the wide applicability of the method, several commonly used classifcation models are used to train and test the obtained efective feature data, and the model accuracy and recognition time are used as evaluation indicators, and the classifcation with the best combination with VFS is obtained. The experimental results of shield machine data of 6 diferent geological structures show that the average accuracy of 13 features obtained by VFS combined with diferent classifcation algorithms is 91%;among them, the random forest model takes less time and has the highest recognition accuracy, reaching 93%, showing best compatibility with VFS. Therefore, the VFS algorithm proposed in this paper has high reliability and wide applicability for stratum identifcation in the process of tunnel construction, and can be matched with a variety of classifer algorithms. By combining 13 features selected from shield machine data features with random forest, the identifcation of the construction stratum environment of shield tunnels can be well realized, and further theoretical guidance for underground engineering construction can be provided. 展开更多
关键词 shield machine tunneling parameters Feature selection Stratigraphic recognition
下载PDF
Limit variation analysis of shallow rectangular tunnels collapsing with double-layer rock mass based on a three-dimensional failure mechanism 被引量:1
10
作者 ZHAO Lian-heng HU Shi-hong +2 位作者 YANG Xin-ping HUANG Fu ZUO Shi 《Journal of Central South University》 SCIE EI CAS CSCD 2019年第7期1794-1806,共13页
In the framework of upper bound theorem of limit analysis, the progressive collapse of shallow rectangular tunnels with double-layer rock mass has been theoretically analyzed based on the three-dimensional (3D) veloci... In the framework of upper bound theorem of limit analysis, the progressive collapse of shallow rectangular tunnels with double-layer rock mass has been theoretically analyzed based on the three-dimensional (3D) velocity discontinuity surfaces. According to the virtual work principle, the difference theorem and the variation method, the collapse surface of double-layer rock mass is determined based on the Hoek-Brown failure criterion. The formula can be degenerated to a single-layer rock collapsing problem when the rock mass is homogeneous. To estimate the validity of the result, the numerical simulation software PLAXIS 3D is used to simulate the collapse of shallow tunnels with double-layer rock mass, and the comparative analysis shows that numerical results are in good agreement with upper-bound solutions. According to the results of parametric analysis, the potential range of collapse of a double-layer rock mass above a shallow cavity decreases with a decrease in A1/A2,σci1/σci2 and σtm1/σtm2 and an increase in B1/B2,γ1/γ2. The range will decrease with a decrease in support pressure q and increase with a decrease in surface overload σs. Therefore, reinforced supporting is beneficial to improve the stability of the cavity during actual construction. 展开更多
关键词 shallow tunnels three-dimensional collapse double-layer rock mass Hoek-Brown failure criterion variation analysis upper bound limit analysis
下载PDF
Influence of secondary lining thickness on mechanical behaviours of double-layer lining in large-diameter shield tunnels
11
作者 Shimin Wang Xuhu He +3 位作者 Xiaoyu Peng Ya Wang Zhengxin Li Zihan 《Underground Space》 SCIE EI CSCD 2024年第5期130-150,共21页
In large-diameter shield tunnels,applying the double-layer lining structure can improve the load-bearing properties and maintain the stability of segmental lining.The secondary lining thickness is a key parameter in t... In large-diameter shield tunnels,applying the double-layer lining structure can improve the load-bearing properties and maintain the stability of segmental lining.The secondary lining thickness is a key parameter in the design of a double lining structure,which is worth being explored.Based on an actual large-diameter shield tunnel,loading model tests are carried out to investigate the effect of the secondary lining thickness on the mechanical behaviours of the double lining structure.The test results show that within the range of secondary lining thicknesses discussed,the load-bearing limit of the double-layer lining increases with growing secondary lining thickness.As a passive support,the secondary lining acts as an auxiliary load-bearing structure by contacting the segment.And changes in secondary lining thickness have a significant effect on the contact state between the segment and secondary lining,with both the contact pressure level and the contact area between the two varying.For double-layer lining structures in large-diameter shield tunnels,it is proposed that the stiffness of the secondary lining needs to be matched to the stiffness of the segment,as this allows them to have a coordinated deformation and a good joint load-bearing effect. 展开更多
关键词 Large-diameter shield tunnels double-layer lining structure Secondary lining thickness Stiffness matching Similar model test
下载PDF
Research on the design method for uniform wear of shield cutters in sand-pebble strata
12
作者 Jinxun Zhang Bo Li +4 位作者 Guihe Wang Yusheng Jiang Hua Jiang Minglun Yin Zhengyang Sun 《Deep Underground Science and Engineering》 2024年第2期216-230,共15页
During shield tunneling in highly abrasive formations such as sand–pebble strata,nonuniform wear of shield cutters is inevitable due to the different cutting distances.Frequent downtimes and cutter replacements have ... During shield tunneling in highly abrasive formations such as sand–pebble strata,nonuniform wear of shield cutters is inevitable due to the different cutting distances.Frequent downtimes and cutter replacements have become major obstacles to long-distance shield driving in sand–pebble strata.Based on the cutter wear characteristics in sand–pebble strata in Beijing,a design methodology for the cutterhead and cutters was established in this study to achieve uniform wear of all cutters by the principle of frictional wear.The applicability of the design method was verified through three-dimensional simulations using the engineering discrete element method.The results show that uniform wear of all cutters on the cutterhead could be achieved by installing different numbers of cutters on each trajectory radius and designing a curved spoke with a certain arch height according to the shield diameter.Under the uniform wear scheme,the cutter wear coefficient is greatly reduced,and the largest shield driving distance is increased by approximately 47%over the engineering scheme.The research results indicate that the problem of nonuniform cutter wear in shield excavation could be overcome,thereby providing guiding significance for theoretical innovation and construction of long-distance shield excavation in highly abrasive strata. 展开更多
关键词 cutter wear EDEM model long-distance shield driving sand-pebble stratum shield tunnel uniform wear design method
原文传递
Examining the effect of adverse geological conditions on jamming of a single shielded TBM in Uluabat tunnel using numerical modeling 被引量:10
13
作者 Rohola Hasanpour Jürgen Schmitt +1 位作者 Yilmaz Ozcelik Jamal Rostami 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2017年第6期1112-1122,共11页
Severe shield jamming events have been reported during excavation of Uluabat tunnel through adverse geological conditions, which resulted in several stoppages at advancing a single shielded tunnel boring machine(TBM).... Severe shield jamming events have been reported during excavation of Uluabat tunnel through adverse geological conditions, which resulted in several stoppages at advancing a single shielded tunnel boring machine(TBM). To study the jamming mechanism, three-dimensional(3D) simulation of the machine and surrounding ground was implemented using the finite difference code FLAC3D. Numerical analyses were performed for three sections along the tunnel with a higher risk for entrapment due to the combination of overburden and geological conditions. The computational results including longitudinal displacement contours and ground pressure profiles around the shield allow a better understanding of ground behavior within the excavation. Furthermore, they allow realistically assessing the impact of adverse geological conditions on shield jamming. The calculated thrust forces, which are required to move the machine forward, are in good agreement with field observations and measurements. It also proves that the numerical analysis can effectively be used for evaluating the effect of adverse geological environment on TBM entrapments and can be applied to prediction of loads on the shield and preestimating of the required thrust force during excavation through adverse ground conditions. 展开更多
关键词 Single shielded tunnel boring machine(TBM) Numerical modeling shield jamming Squeezing ground Uluabat tunnel
下载PDF
Modelling the performance of EPB shield tunnelling using machine and deep learning algorithms 被引量:21
14
作者 Song-Shun Lin Shui-Long Shen +1 位作者 Ning Zhang Annan Zhou 《Geoscience Frontiers》 SCIE CAS CSCD 2021年第5期81-92,共12页
This paper introduces an intelligent framework for predicting the advancing speed during earth pressure balance(EPB)shield tunnelling.Five artificial intelligence(AI)models based on machine and deep learning technique... This paper introduces an intelligent framework for predicting the advancing speed during earth pressure balance(EPB)shield tunnelling.Five artificial intelligence(AI)models based on machine and deep learning techniques-back-propagation neural network(BPNN),extreme learning machine(ELM),support vector machine(SVM),long-short term memory(LSTM),and gated recurrent unit(GRU)-are used.Five geological and nine operational parameters that influence the advancing speed are considered.A field case of shield tunnelling in Shenzhen City,China is analyzed using the developed models.A total of 1000 field datasets are adopted to establish intelligent models.The prediction performance of the five models is ranked as GRU>LSTM>SVM>ELM>BPNN.Moreover,the Pearson correlation coefficient(PCC)is adopted for sensitivity analysis.The results reveal that the main thrust(MT),penetration(P),foam volume(FV),and grouting volume(GV)have strong correlations with advancing speed(AS).An empirical formula is constructed based on the high-correlation influential factors and their corresponding field datasets.Finally,the prediction performances of the intelligent models and the empirical method are compared.The results reveal that all the intelligent models perform better than the empirical method. 展开更多
关键词 EPB shield machine Advancing speed prediction Intelligent models Empirical analysis tunnel excavation
下载PDF
Prediction of Disc Cutter Life During Shield Tunneling with AI via the Incorporation of a Genetic Algorithm into a GMDH-Type Neural Network 被引量:15
15
作者 Khalid Elbaz Shui-Long Shen +2 位作者 Annan Zhou Zhen-Yu Yin Hai-Min Lyu 《Engineering》 SCIE EI 2021年第2期238-251,共14页
Disc cutter consumption is a critical problem that influences work performance during shield tunneling processes and directly affects the cutter change decision.This study proposes a new model to estimate the disc cut... Disc cutter consumption is a critical problem that influences work performance during shield tunneling processes and directly affects the cutter change decision.This study proposes a new model to estimate the disc cutter life(Hf)by integrating a group method of data handling(GMDH)-type neural network(NN)with a genetic algorithm(GA).The efficiency and effectiveness of the GMDH network structure are optimized by the GA,which enables each neuron to search for its optimum connections set from the previous layer.With the proposed model,monitoring data including the shield performance database,disc cutter consumption,geological conditions,and operational parameters can be analyzed.To verify the performance of the proposed model,a case study in China is presented and a database is adopted to illustrate the excellence of the hybrid model.The results indicate that the hybrid model predicts disc cutter life with high accuracy.The sensitivity analysis reveals that the penetration rate(PR)has a significant influence on disc cutter life.The results of this study can be beneficial in both the planning and construction stages of shield tunneling. 展开更多
关键词 Disc cutter life shield tunneling Operational parameters GMDH-GA
下载PDF
Comprehensive health assessment of shield tunnel structure based on prototype experiment 被引量:11
16
作者 LI Pan ZHANG Ya-wei +1 位作者 JIANG Fu-yu ZHENG Hu 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第3期681-689,共9页
Health state of shield tunnels is one of the most important parameters for structure maintenance.Usually,the shield tunnel is extremely long in longitude direction and composed by many segments.It is difficult to quan... Health state of shield tunnels is one of the most important parameters for structure maintenance.Usually,the shield tunnel is extremely long in longitude direction and composed by many segments.It is difficult to quantify the relationship between the structure damage state and shield tunnel structure deformation by the model test because of unpredictable effects of different scales between model test and prototype tunnel structure.Here,an in-situ monitoring project was conducted to study the excavation induced shield tunnel structure damage,which could be considered a prototype test on the tunnel deformation.The disaster performance of tunnel leakage,segment crack,segment dislocation and segment block drop-off during longitude deformation and cross-section ovality developments was analyzed.The results indicate that instead of the longitude deformation,the ovality value has the strongest correlation to the rest disease performance,which could be used as the assessment index of the tunnel health.For this tunnel,it is in health state when the ovality is less than 0.5%,and the serious damage could be found when the ovality value is higher than 0.77%.The research results provide valuable reference to shield tunnel health assessment and help complete the standard of shield tunnel construction. 展开更多
关键词 shield tunnel health assessment DEFORMATION structure disease
下载PDF
Mechanical behavior of segment rebar of shield tunnel in construction stage 被引量:12
17
作者 Jun-sheng CHEN Hai-hong MO 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2008年第7期888-899,共12页
In this paper, a 3D finite element (FE) program ADINA was applied to analyzing a tunnel with 9 segment tings. The loads acting on these segment tings included the squeezing action of tail brush of shield machine und... In this paper, a 3D finite element (FE) program ADINA was applied to analyzing a tunnel with 9 segment tings. The loads acting on these segment tings included the squeezing action of tail brush of shield machine under attitude deflection, the jacking forces, the grouting pressure and the soil pressure. The analyses focused on the rebar stress in two statuses: (1) normal construction status without shield machine squeezing; (2) squeezing action induced by shield machine under attitude deflection. The analyses indicated that the rebar stress was evidently affected by the construction loads. In different construction status, the rebar stress ranges from -80 MPa to 50 MPa, and the rebar is in elastic status. Even some cracks appear on segments, the stress of segment rebar is still at a low level. It is helpful to incorporate a certain quantity of steel fiber to improve the anti-crack and shock resistance performance. 展开更多
关键词 shield tunnel CONSTRUCTION SEGMENT REBAR Finite element (FE) analysis
下载PDF
Machine learning-based automatic control of tunneling posture of shield machine 被引量:13
18
作者 Hongwei Huang Jiaqi Chang +3 位作者 Dongming Zhang Jie Zhang Huiming Wu Gang Li 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2022年第4期1153-1164,共12页
For a tunnel driven by a shield machine,the posture of the driving machine is essential to the construction quality and environmental impact.However,the machine posture is controlled by the experienced driver of shiel... For a tunnel driven by a shield machine,the posture of the driving machine is essential to the construction quality and environmental impact.However,the machine posture is controlled by the experienced driver of shield machine by setting hundreds of tunneling parameters empirically.Machine learning(ML)algorithm is an alternative method that can let the computer to learn from the driver’s operation and try to model the relationship between parameters automatically.Thus,in this paper,three ML algorithms,i.e.multi-layer perception(MLP),support vector machine(SVM)and gradient boosting regression(GBR),are improved by genetic algorithm(GA)and principal component analysis(PCA)to predict the tunneling posture of the shield machine.A set of the parameters for shield tunneling is extracted from the construction site of a Shanghai metro.In total,53,785 pairwise data points are collected for about 373 d and the ratio between training set,validation set and test set is 3:1:1.Each pairwise data point includes 83 types of parameters covering the shield posture,construction parameters,and soil stratum properties at the same time.The test results show that the averaged R2 of MLP,SVM and GBR based models are 0.942,0.935 and 0.6,respectively.Then the automatic control for the posture of shield tunnel is illustrated with an application example of the proposed models.The proposed method is proved to be helpful in controlling the construction quality with optimized construction parameters. 展开更多
关键词 shield tunneling Machine learning(ML) Construction parameters Optimization
下载PDF
Optimized Fuzzy Clustering Method for Health Monitoring of Shield Tunnels 被引量:3
19
作者 周发 张巍 +2 位作者 孙可 唐心煜 王小敏 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI CSCD 2015年第3期325-333,共9页
Since health monitoring of shield tunnels generally employs multiple sensors belonging to different types,a fine analysis on massive monitoring data,as well as further quantitative health grading,is really challenging... Since health monitoring of shield tunnels generally employs multiple sensors belonging to different types,a fine analysis on massive monitoring data,as well as further quantitative health grading,is really challenging.An optimized fuzzy clustering analysis method based on the fuzzy equivalence relation is proposed for health monitoring of shield tunnels.Clustering results are auto-generated by using fuzzy similarity-valued map.The results follow the idea of unsupervised classification.Moreover,a convenient new health index HI is proposed for a fast tunnel-health grading.A case study on Nanjing Yangtze River Tunnel is presented to validate this method.Three types of indicators,namely soil pressure,pore water pressure and steel strain,are used to develop the clustering model.The clustering results are verified by analyzing the engineering geological conditions;the validity and the efficacy of the proposed method are also demonstrated.Further,the fuzzy clustering analysis also represents a potential for identifying abnormal monitoring data.This investigation indicates the fuzzy clustering analysis method is capable of characterizing the fuzziness of tunnel health,and beneficial to clarify the tunnel health evaluation uncertainties. 展开更多
关键词 shield tunnel HEALTH MONITORING optimized FUZZY CL
下载PDF
Impact of shield tunneling on adjacent spread foundation on sandy cobble strata 被引量:7
20
作者 Yong Fang Jun Wang +1 位作者 Chuan He Xiongyu Hu 《Journal of Modern Transportation》 2014年第4期244-255,共12页
The section of shield tunnel of the Chengdu Metro line passes primarily through sandy cobble strata. There are many buildings with spread foundations along the lines. Shield tunnel construction will disturb the ground... The section of shield tunnel of the Chengdu Metro line passes primarily through sandy cobble strata. There are many buildings with spread foundations along the lines. Shield tunnel construction will disturb the ground, causing displacement or stress to adjacent spread foundations. Based on the similarity theory, a laboratory model test of shield tunnel driving was carried out to study the influence of shield tunnel excavation on the displace ment of adjacent spread foundation. The results show that foundation closer to the tunnel has greater displacement or settlement than that further away. The horizontal dis placement is small and is influenced greatly by the cutting face. The displacement along the machine driving direction is bigger and is significantly affected by the thrust force. Settlement occurs primarily when shield machine passes close to the foundation and is the greatest at that time. Uneven settlement at the bottom of the spread foundation reaches a maximum after the excavation ends. In a numerical simulation, a particle flow model was con structed to study the impact of shield tunnel excavation on the stresses in the ground. The model showed stress con centration at the bottom of the spread foundation. With the increasing ground loss ratio, a loose area appears in the tunnel dome where the contact force dropped. Above the loose area, the contact force increases, forming an arch shaped soil area which prevents the loose area from expanding to the ground surface. The excavation also changed the pressure distribution around spread foundation. 展开更多
关键词 shield tunnel Sandy cobble strata Spreadfoundation Distinct element method Model test