期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Stability analysis of rib pillars in highwall mining under dynamic and static loads in open‑pit coal mine 被引量:1
1
作者 Haoshuai Wu Yanlong Chen +3 位作者 Haoyan Lv Qihang Xie Yuanguang Chen Jun Gu 《International Journal of Coal Science & Technology》 EI CAS CSCD 2022年第3期120-135,共16页
The retained coal in the end slope of an open-pit mine can be mined by the highwall mining techniques.However,the instability mechanism of the reserved rib pillar under dynamic loads of mining haul trucks and static l... The retained coal in the end slope of an open-pit mine can be mined by the highwall mining techniques.However,the instability mechanism of the reserved rib pillar under dynamic loads of mining haul trucks and static loads of the overlying strata is not clear,which restricts the safe and efcient application of highwall mining.In this study,the load-bearing model of the rib pillar in highwall mining was established,the cusp catastrophe theory and the safety coefcient of the rib pillar were considered,and the criterion equations of the rib pillar stability were proposed.Based on the limit equilibrium theory,the limit stress of the rib pillar was analyzed,and the calculation equations of plastic zone width of the rib pillar in highwall mining were obtained.Based on the Winkler foundation beam theory,the elastic foundation beam model composed of the rib pillar and roof under the highwall mining was established,and the calculation equations for the compression of the rib pillar under dynamic and static loads were developed.The results showed that with the increase of the rib pillar width,the total compression of the rib pillar under dynamic and static loads decreases nonlinearly,and the compression of the rib pillar caused by static loads of the overlying strata and trucks has a decisive role.Numerical simulation and theoretical calculation were also performed in this study.In the numerical simulation,the coal seam with a buried depth of 122 m and a thickness of 3 m is mined by highwall mining techniques.According to the established rib pillar instability model of the highwall mining system,it is found that when the mining opening width is 3 m,the reasonable width of the rib pillar is at least 1.3 m,and the safety factor of the rib pillar is 1.3.The numerical simulation results are in good agreement with the results of theoretical calculation,which verifes the feasibility of the theoretical analysis of the rib pillar stability.This research provides a reference for the stability analysis of rib pillars under highwall mining. 展开更多
关键词 Open-pit coal mine dynamic and static loads Highwall mining Rib pillar Catastrophe instability
下载PDF
Rockburst mechanism and the law of energy accumulation and release in mining roadway: a case study 被引量:1
2
作者 Feng Du Ji Ma +5 位作者 Xiaofei Guo Tianfeng Wang Xiaohang Dong Jiashuo Li Shulei He Dilinaer Nuerjuma 《International Journal of Coal Science & Technology》 EI CAS CSCD 2022年第5期96-112,共17页
The rockburst dynamic disasters in the process of deep coal mining become more and more serious.Taking the rockburst occurred in the 23130 working face of Yuejin Coal Mine as the engineering background,we study the ch... The rockburst dynamic disasters in the process of deep coal mining become more and more serious.Taking the rockburst occurred in the 23130 working face of Yuejin Coal Mine as the engineering background,we study the characteristics of mining stress feld around roadway,the plastic failure morphological characteristics of surrounding rock and the accumulation/release law of elastic energy before and after burst.An analysis model quantitatively describing the physical process of rockburst in the mining roadway is established,and the calculation method of dynamic release of elastic energy in the physical process of rockburst is educed.The mechanism of rockburst in mining roadway is revealed.The results show that an“L-shaped”stress concentration zone is formed within 100 m of the 23130 working face,and the principal stress ratio of the surrounding rock of the transportation roadway is 2.59–4.26.The change of the direction of the maximum principal stress has a signifcant efect on the burst appearance characteristics.The failure strength of diferent sections of the mining roadway is characterized by the elastic energy release value.With the increase of the working face distance,the elastic energy released by burst failure and the expansion variation of failure boundary radius show a nonlinear variation law that tends to decrease steadily after sharp fuctuation.The closer to the working face,the higher the burst risk.At a distance of 10 m from the working surface,the maximum principal stress reaches its maximum value.The butterfy-shaped failure system generated by the surrounding rock of the roadway has energy self-sustainability,and the elastic energy released by the sudden expansion of the butterfy leaf is enough to cause a burst damage of 1.9 magnitude.This work could provide theoretical support for the prediction and prevention of rockburst. 展开更多
关键词 COAL ROCKBURST Mining roadway Plastic failure dynamic and static load Elastic energy
下载PDF
Application of high-pressure water jet technology and the theory of rock burst control in roadway 被引量:18
3
作者 Yang Zengqiang Dou Linming +3 位作者 Liu Chang Xu Mengtang Lei Zhen Yao Yahu 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第5期929-935,共7页
This paper puts forward using high-pressure water jet technology to control rock burst in roadway, and analyzes the theory of controlling rock burst in roadway by the weak structure zone model. The weak structure zone... This paper puts forward using high-pressure water jet technology to control rock burst in roadway, and analyzes the theory of controlling rock burst in roadway by the weak structure zone model. The weak structure zone is formed by using high-pressure water jet to cut the coal wall in a continuous and rotational way. In order to study the influence law of weak structure zone in surrounding rock, this paper numerically analyzed the influence law of weak structure zone, and the disturbance law of coal wall and floor under dynamic and static combined load. The results show that when the distance between high-pressure water jet drillings is 3 m and the diameter of drilling is 300 mm, continuous stress superposition zone can be formed. The weak structure zone can transfer and reduce the concentrated static load in surrounding rock, and then form distressed zone. The longer the high-pressure water jet drilling is, the larger the distressed zone is. The stress change and displacement change of non-distressed zone in coal wall and floor are significantly greater than that of distressed zone under dynamic and static combined load. And it shows that the distressed zone can effectively control rock burst in roadway under dynamic and static combined load. High-pressure water jet technology was applied in the haulage gate of 250203 working face in Yanbei Coal Mine, and had gained good effect. The study conclusions provide theoretical foundation and a new guidance for controlling rock burst in roadway. 展开更多
关键词 High-pressure water jet technology Rock burst Weak structure zone dynamic and static combined load
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部