This article examines the soft soil roadbed reinforcement technology for widened sections of highways in a specific project.It provides an overview of the project,the principles of soft soil roadbed reinforcement tech...This article examines the soft soil roadbed reinforcement technology for widened sections of highways in a specific project.It provides an overview of the project,the principles of soft soil roadbed reinforcement technology for wide sections,and its practical application.The analysis aims to offer guidance on applying soft soil roadbed wide section reinforcement technology and enhancing the overall quality of similar projects.展开更多
The expressway is necessary for the development of the modern transportation industry, and the level of expressway construction reflects the overall grade of national or regional economic development. In order to proc...The expressway is necessary for the development of the modern transportation industry, and the level of expressway construction reflects the overall grade of national or regional economic development. In order to process the expressway road property data information, based on the current mainstream Windows operating system, this study utilizes Geographic Information System (GIS) development technology, road video processing technology, and spatial data mining method to design and develop an expressway video and road infostructure GIS data production system. The system designs a multi-layer distributed application model in accordance with the ideas and methods of GIS engineering and the characteristics of road production data. In addition, according to the characteristics and specification requirements of basic geographic data, the road production database of spatial data and attribute data integrated storage is constructed by combining database and spatial data engine. Through the development of the GIS data production system for expressway video and road infostructure, various functions such as generation of road property data, dynamic management of road infostructure, and visualization of spatial information have been realized. The system focuses on improving the production efficiency and automation level of expressway production data and meet</span><span style="font-family:Verdana;">s</span><span style="font-family:Verdana;"> the construction requirements for modernization, informatization, and intelligence of expressways.展开更多
The concept of control system of acceptable gap in the entrance ramp, the construction of the minimum acceptable gap and the method of determining it are introduced. On the above-mentioned basis and by taking the Chin...The concept of control system of acceptable gap in the entrance ramp, the construction of the minimum acceptable gap and the method of determining it are introduced. On the above-mentioned basis and by taking the Chinas reality into consideration, the issues on the design of control system of acceptable gap are approached in this paper.展开更多
Ecological restoration and reconstruction refers to how to prevent the main factors and processes from further degrading the ecosystem, as well as how to regulate and optimize the exchanging process and the space-time...Ecological restoration and reconstruction refers to how to prevent the main factors and processes from further degrading the ecosystem, as well as how to regulate and optimize the exchanging process and the space-time cycling system of substance, energy and information through man force, in order to restore the structure, function and eco-potentiality back to the original level or even higher, with the help of certain biological, ecological and engineering techniques. Ecological restoration and reconstruction involves problems of different levels and different fields, with the focus on the ecosystem (species communities), the landscape and certain areas. Problems in the process of road-area ecosystem construction are as follows: attention is paid to the conditions of the road itself and the short-term effects, not to the natural propagation of species within the whole road-area or the ecological safety area; the importance of biological diversity in ecological restoration is neglected; the property of heterogeneity necessary for a sound ecosystem is ignored; the ecological interaction among species doesn't earn enough attention; properties like localization and adaptability in different districts are not paid enough attention. Landscape ecology can guide the work of road-area ecosystem restoration, through the space pattern.展开更多
According to the extension of ETC (Electronic Toll Collection) System, the distance based toll system has been recently introduced to realize the effective traffic management for urban transport networks. In the stu...According to the extension of ETC (Electronic Toll Collection) System, the distance based toll system has been recently introduced to realize the effective traffic management for urban transport networks. In the study, urban road network in Keihanshin area is analyzed as an empirical study. The traffic assignment technique is modified to estimate the traffic conditions on the network with describing the individual route charging as well as diversion traffic. The impact of implementation of distance based toll onto the real scale transport network can be evaluated to discuss the social benefit of road users. The advanced technique with intelligent information processing can be proposed to determine the optimal combination of parameters in distance based toll function. In the study, the reduction of total travel time of road users is regarded as the index of the social benefit on urban network. Therefore, the estimation model of total travel time is created by neural network without the estimation process for large scale network. After the optimal combination of parameters is determined, practical road pricing policy on the urban network can be analyzed. Finally, the optimal function form of distance based toll is recommended in practical implementation.展开更多
Applying the visual simulation technology to highway engineering, an expressway visual simulation system for the analysis of landscape design proposals is built during the construction of Xiaoxiang expressway. Its fun...Applying the visual simulation technology to highway engineering, an expressway visual simulation system for the analysis of landscape design proposals is built during the construction of Xiaoxiang expressway. Its functional requirements and overall architecture are presented. The 3D model of expressway is created with AutoCAD DWG files as source data and the dynamic design method of expressway landscape elements is introduced. A data analysis interface dedicated to the landscape evaluation is developed. The system offers an effective tool to facilitate the analysis and evaluation of the road landscape proposals.展开更多
The significance and the strategies of applying the reliability design method of longitudinal slope length in expressway engineering were explored in this study.The objective is to offer insights that can be beneficia...The significance and the strategies of applying the reliability design method of longitudinal slope length in expressway engineering were explored in this study.The objective is to offer insights that can be beneficial for designing longitudinal slope lengths in contemporary expressway projects,with a focus on enhancing their reliability and safety.展开更多
Road traffic conditions can have an important impact on the economic development of various regions.Under the background of rapid social and economic development,more and more expressway construction projects are init...Road traffic conditions can have an important impact on the economic development of various regions.Under the background of rapid social and economic development,more and more expressway construction projects are initiated in various regions,including both new expressways and expansion of old expressways,and interchange design plays an important role.Scientific and reasonable interchange design can not only realize energy saving and low carbon footprint,but also be people-oriented and promote regional economic development.Therefore,this paper mainly analyzes the highway route and its interchange design strategy for reference.展开更多
With the rapid development of the socio-economy and the growing demand for transportation,highways have become an indispensable and important part of the modern transportation network.The design of highway routes and ...With the rapid development of the socio-economy and the growing demand for transportation,highways have become an indispensable and important part of the modern transportation network.The design of highway routes and interchanges is a key link in highway construction,which directly affects the efficiency,safety,and traffic smoothness of highways.Based on this,this article analyzes in detail the highway route design and the design of two common interchanges,in order to improve the highway route design and the quality and efficiency of highway construction.展开更多
The construction and operation of expressways will also bring a series of environmental and ecological problems,such as land use conflicts,ecological damage,environmental pollution,etc.In order to solve such problems,...The construction and operation of expressways will also bring a series of environmental and ecological problems,such as land use conflicts,ecological damage,environmental pollution,etc.In order to solve such problems,it is necessary to strengthen the application of landscape ecology.From the perspective of landscape ecology,this paper first introduces the impact of expressways on the ecological environment,and then analyzes the principles of expressway ecological landscape design.Landscaping,ecological environment,customer satisfaction,and other aspects have all performed well,with an optimization rate of over 90%.Future expressway design can strengthen the application of landscape ecology.展开更多
China's road network consists of numerous older expressways experiencing high traffic volumes and severe congestion,necessitating urgent reconstruction and expansion efforts.This study discusses the reconstruction...China's road network consists of numerous older expressways experiencing high traffic volumes and severe congestion,necessitating urgent reconstruction and expansion efforts.This study discusses the reconstruction and expansion project of the Yinkun Expressway's Chongqing High-tech Zone to Rongchang District section,with a detailed exploration of the entire design process.Through a comprehensive analysis,the strengths and weaknesses of different plans are examined,so as to determine the optimal plan.The design chosen saves costs while effectively addressing traffic demands.Additionally,the study summarizes the valuable design insights gained from this interchange transformation,aiming to provide valuable reference for similar interchange projects in the future.展开更多
In order to solve the problems of potential incident rescue on expressway networks, the opportunity cost-based method is used to establish a resource dispatch decision model. The model aims to dispatch the rescue reso...In order to solve the problems of potential incident rescue on expressway networks, the opportunity cost-based method is used to establish a resource dispatch decision model. The model aims to dispatch the rescue resources from the regional road networks and to obtain the location of the rescue depots and the numbers of service vehicles assigned for the potential incidents. Due to the computational complexity of the decision model, a scene decomposition algorithm is proposed. The algorithm decomposes the dispatch problem from various kinds of resources to a single resource, and determines the original scene of rescue resources based on the rescue requirements and the resource matrix. Finally, a convenient optimal dispatch scheme is obtained by decomposing each original scene and simplifying the objective function. To illustrate the application of the decision model and the algorithm, a case of the expressway network is studied on areas around Nanjing city in China and the results show that the model used and the algorithm proposed are appropriate.展开更多
Aiming at the real-time fluctuation and nonlinear characteristics of the expressway short-term traffic flow forecasting the parameter projection pursuit regression PPPR model is applied to forecast the expressway traf...Aiming at the real-time fluctuation and nonlinear characteristics of the expressway short-term traffic flow forecasting the parameter projection pursuit regression PPPR model is applied to forecast the expressway traffic flow where the orthogonal Hermite polynomial is used to fit the ridge functions and the least square method is employed to determine the polynomial weight coefficient c.In order to efficiently optimize the projection direction a and the number M of ridge functions of the PPPR model the chaos cloud particle swarm optimization CCPSO algorithm is applied to optimize the parameters. The CCPSO-PPPR hybrid optimization model for expressway short-term traffic flow forecasting is established in which the CCPSO algorithm is used to optimize the optimal projection direction a in the inner layer while the number M of ridge functions is optimized in the outer layer.Traffic volume weather factors and travel date of the previous several time intervals of the road section are taken as the input influencing factors. Example forecasting and model comparison results indicate that the proposed model can obtain a better forecasting effect and its absolute error is controlled within [-6,6] which can meet the application requirements of expressway traffic flow forecasting.展开更多
To understand the effect of the running of Shaanxi Inner Mongolia Expressway on food crops planted along the sides, we determined the heavy metal contents(Zn, Pb, Cu and Cb) in the digestion solutions of the root, ste...To understand the effect of the running of Shaanxi Inner Mongolia Expressway on food crops planted along the sides, we determined the heavy metal contents(Zn, Pb, Cu and Cb) in the digestion solutions of the root, stem and leaf from rice and corn. The results showed that highway promoted the accumulation of heavy metal elements in corn and rice. Compared with the CKs(crops produced where no highway extend), contents of heavy metal elements in two crops tested from two sampling sites were both over standard. This indicates that food crops planted within 100 m away from the highway are been polluted by heavy metals, which is directly related with the running of Shaanxi Inner Mongolia Expressway. Based on this, the areas within 100 m away from the highway are not suggested to cultivate food crops.展开更多
The macroscopic fundamental diagram( MFD) is studied to obtain the aggregate behavior of traffic in cities. This paper investigates the existence and the characteristics of different types of daily MFD for the Shang...The macroscopic fundamental diagram( MFD) is studied to obtain the aggregate behavior of traffic in cities. This paper investigates the existence and the characteristics of different types of daily MFD for the Shanghai urban expressway network. The existence of MFD in the Shanghai urban expressway network is proved based on two weeks' data.Moreover, the hysteresis phenomena is present in most days and the network exhibits different hysteresis loops under different traffic situations. The relationship between the hysteresis phenomena and the inhomogeneity of traffic distribution is verified. The MFDs in the years of 2009 and 2012 are compared. The hysteresis loop still exists in 2012, which further verifies the existence of the hysteresis phenomenon. The direct relationship between the length of the hysteresis loop( ΔO) and the congestion is proved based on sufficient data. The width of the hysteresis loop, i. e., the drop in network flow( ΔQ) has no relationship with the congestion, and it varies from day to day under different traffic situations.展开更多
With expressway development and environment protection consciousness improving, slope protection technology with vegetation has drawn much more attention. From the perspective of ecology, Baoji-Hanzhong Expressway max...With expressway development and environment protection consciousness improving, slope protection technology with vegetation has drawn much more attention. From the perspective of ecology, Baoji-Hanzhong Expressway maximized slope protection technology with vegetation and formed attracting landscapes on basis of eco-protection. This research introduced the technology of Baoji-Hanzhong Expressway, and explored a low-cost and effective biological slopeprotection way, suitable for Baoji-Hanzhong Expressway, according to slope protection technologies, at home and abroad, with botany, water and soil conservation engineering, and architecture, which fixed and stabilized slopes, prevented rainfall scouring, and advanced slope protection development in China.展开更多
The concept of cultural landscapes was introduced,and it was proposed that the construction of highway cultural landscapes should follow the principles of "protection first,secure,integrated,suitable for actual c...The concept of cultural landscapes was introduced,and it was proposed that the construction of highway cultural landscapes should follow the principles of "protection first,secure,integrated,suitable for actual conditions,economic,natural and ecological".In this study,relevant theories were taken to analyze the design of cultural landscapes along the Ya'an-Luguhu Expressway in Sichuan Province.Natural conditions,profound cultures and historical resources in the study area were analyzed,and the construction of its cultural landscapes was further discussed from the perspectives of properly dividing landscape spaces,determining the orientation of cultural landscapes,refining regional cultures,choosing carriers of cultural landscapes,improving cultural value of important landscape nodes by using artistic settings,applying more local materials and so on.So that helpful references could be provided for the landscape design of other expressways,and the integration of cultural landscapes and highway landscape system could be realized.展开更多
This article focuses on bridge testing technologies in highway construction and expansion projects.It provides an overview of the inspection process for bridges in highway reconstruction and expansion projects,the mai...This article focuses on bridge testing technologies in highway construction and expansion projects.It provides an overview of the inspection process for bridges in highway reconstruction and expansion projects,the main inspections,and strategies for improving the quality of inspections.Relevant units should conduct bridge inspections using appearance inspections,special inspections,and bearing capacity assessments in highway reconstruction and expansion projects.To effectively improve testing quality,relevant units should also focus on establishing and improving testing standards,strengthening material testing,and improving the overall quality of the testing personnel.This research aims to enhance the quality of highway reconstruction and expansion projects by supporting the sensible application of bridge inspection technology.展开更多
Many desert expressways are affected by the deposition of the wind-blown sand,which might block the movement of vehicles or cause accidents.W-beam central guardrails,which are used to improve the safety of desert expr...Many desert expressways are affected by the deposition of the wind-blown sand,which might block the movement of vehicles or cause accidents.W-beam central guardrails,which are used to improve the safety of desert expressways,are thought to influence the deposition of the wind-blown sand,but this has yet not to be studied adequately.To address this issue,we conducted a wind tunnel test to simulate and explore how the W-beam central guardrails affect the airflow,the wind-blown sand flux and the deposition of the wind-blown sand on desert expressways in sandy regions.The subgrade model is 3.5 cm high and 80.0 cm wide,with a bank slope ratio of 1:3.The W-beam central guardrails model is 3.7 cm high,which included a 1.4-cm-high W-beam and a 2.3-cm-high stand column.The wind velocity was measured by using pitot-static tubes placed at nine different heights(1,2,3,5,7,10,15,30 and 50 cm)above the floor of the chamber.The vertical distribution of the wind-blown sand flux in the wind tunnel was measured by using the sand sampler,which was sectioned into 20 intervals.In addition,we measured the wind-blown sand flux in the field at K50 of the Bachu-Shache desert expressway in the Taklimakan Desert on 11 May 2016,by using a customized 78-cm-high gradient sand sampler for the sand flux structure test.Obstruction by the subgrade leads to the formation of two weak wind zones located at the foot of the windward slope and at the leeward slope of the subgrade,and the wind velocity on the leeward side weakens significantly.The W-beam central guardrails decrease the leeward wind velocity,whereas the velocity increases through the bottom gaps and over the top of the W-beam central guardrails.The vertical distribution of the wind-blown sand flux measured by wind tunnel follows neither a power-law nor an exponential function when affected by either the subgrade or the W-beam central guardrails.At 0.0H and 0.5H(where H=3.5 cm,which is the height of the subgrade),the sand transport is less at the 3 cm height from the subgrade surface than at the 1 and 5 cm heights as a result of obstruction by the W-beam central guardrails,and the maximum sand transportation occurs at the 5 cm height affected by the subgrade surface.The average saltation height in the presence of the W-beam central guardrails is greater than the subgrade height.The field test shows that the sand deposits on the overtaking lane leeward of the W-beam central guardrails and that the thickness of the deposited sand is determined by the difference in the sand mass transported between the inlet and outlet points,which is consistent with the position of the minimum wind velocity in the wind tunnel test.The results of this study could help us to understand the hazards of the wind-blown sand onto subgrade with the W-beam central guardrails.展开更多
Identifying bottlenecks and analyzing their characteristics are important tasks to city traffic management authorities.Although the speed difference was proposed for the bottleneck identification in the existing resea...Identifying bottlenecks and analyzing their characteristics are important tasks to city traffic management authorities.Although the speed difference was proposed for the bottleneck identification in the existing research,the use of a secondary indicator has not been fully discussed.This paper strived to develop a method to identify the bottleneck on expressways by using the massive floating car data(FCD)in Beijing.First,the speed characteristics of bottlenecks on expressway were analyzed based on the speed contour map.The results indicated that there was a significant difference between speeds on the bottleneck and downstream links when a bottleneck was observed.The speed difference could indeed be used as the primary indicator to identify the bottleneck.However,it was also shown that a sufficiently large speed difference does not necessitate an activation of a bottleneck.The speed-at-capacity was then used as the secondary indicator to distinguish the real bottleneck from the non-bottleneck speed difference.Second,a practical method for identifying the bottleneck on expressways was developed based on the speed difference and the speed-at-capacity.Finally,the method was applied to identifying the bottlenecks of the 3rd Outer Ring Expressway in Beijing.The duration,affected distance,delay and cause were used to evaluate and analyze the bottlenecks.展开更多
文摘This article examines the soft soil roadbed reinforcement technology for widened sections of highways in a specific project.It provides an overview of the project,the principles of soft soil roadbed reinforcement technology for wide sections,and its practical application.The analysis aims to offer guidance on applying soft soil roadbed wide section reinforcement technology and enhancing the overall quality of similar projects.
文摘The expressway is necessary for the development of the modern transportation industry, and the level of expressway construction reflects the overall grade of national or regional economic development. In order to process the expressway road property data information, based on the current mainstream Windows operating system, this study utilizes Geographic Information System (GIS) development technology, road video processing technology, and spatial data mining method to design and develop an expressway video and road infostructure GIS data production system. The system designs a multi-layer distributed application model in accordance with the ideas and methods of GIS engineering and the characteristics of road production data. In addition, according to the characteristics and specification requirements of basic geographic data, the road production database of spatial data and attribute data integrated storage is constructed by combining database and spatial data engine. Through the development of the GIS data production system for expressway video and road infostructure, various functions such as generation of road property data, dynamic management of road infostructure, and visualization of spatial information have been realized. The system focuses on improving the production efficiency and automation level of expressway production data and meet</span><span style="font-family:Verdana;">s</span><span style="font-family:Verdana;"> the construction requirements for modernization, informatization, and intelligence of expressways.
文摘The concept of control system of acceptable gap in the entrance ramp, the construction of the minimum acceptable gap and the method of determining it are introduced. On the above-mentioned basis and by taking the Chinas reality into consideration, the issues on the design of control system of acceptable gap are approached in this paper.
文摘Ecological restoration and reconstruction refers to how to prevent the main factors and processes from further degrading the ecosystem, as well as how to regulate and optimize the exchanging process and the space-time cycling system of substance, energy and information through man force, in order to restore the structure, function and eco-potentiality back to the original level or even higher, with the help of certain biological, ecological and engineering techniques. Ecological restoration and reconstruction involves problems of different levels and different fields, with the focus on the ecosystem (species communities), the landscape and certain areas. Problems in the process of road-area ecosystem construction are as follows: attention is paid to the conditions of the road itself and the short-term effects, not to the natural propagation of species within the whole road-area or the ecological safety area; the importance of biological diversity in ecological restoration is neglected; the property of heterogeneity necessary for a sound ecosystem is ignored; the ecological interaction among species doesn't earn enough attention; properties like localization and adaptability in different districts are not paid enough attention. Landscape ecology can guide the work of road-area ecosystem restoration, through the space pattern.
文摘According to the extension of ETC (Electronic Toll Collection) System, the distance based toll system has been recently introduced to realize the effective traffic management for urban transport networks. In the study, urban road network in Keihanshin area is analyzed as an empirical study. The traffic assignment technique is modified to estimate the traffic conditions on the network with describing the individual route charging as well as diversion traffic. The impact of implementation of distance based toll onto the real scale transport network can be evaluated to discuss the social benefit of road users. The advanced technique with intelligent information processing can be proposed to determine the optimal combination of parameters in distance based toll function. In the study, the reduction of total travel time of road users is regarded as the index of the social benefit on urban network. Therefore, the estimation model of total travel time is created by neural network without the estimation process for large scale network. After the optimal combination of parameters is determined, practical road pricing policy on the urban network can be analyzed. Finally, the optimal function form of distance based toll is recommended in practical implementation.
基金Supported by the Communication Science and Technology Fund Item of Hubei Province(2003)
文摘Applying the visual simulation technology to highway engineering, an expressway visual simulation system for the analysis of landscape design proposals is built during the construction of Xiaoxiang expressway. Its functional requirements and overall architecture are presented. The 3D model of expressway is created with AutoCAD DWG files as source data and the dynamic design method of expressway landscape elements is introduced. A data analysis interface dedicated to the landscape evaluation is developed. The system offers an effective tool to facilitate the analysis and evaluation of the road landscape proposals.
文摘The significance and the strategies of applying the reliability design method of longitudinal slope length in expressway engineering were explored in this study.The objective is to offer insights that can be beneficial for designing longitudinal slope lengths in contemporary expressway projects,with a focus on enhancing their reliability and safety.
文摘Road traffic conditions can have an important impact on the economic development of various regions.Under the background of rapid social and economic development,more and more expressway construction projects are initiated in various regions,including both new expressways and expansion of old expressways,and interchange design plays an important role.Scientific and reasonable interchange design can not only realize energy saving and low carbon footprint,but also be people-oriented and promote regional economic development.Therefore,this paper mainly analyzes the highway route and its interchange design strategy for reference.
文摘With the rapid development of the socio-economy and the growing demand for transportation,highways have become an indispensable and important part of the modern transportation network.The design of highway routes and interchanges is a key link in highway construction,which directly affects the efficiency,safety,and traffic smoothness of highways.Based on this,this article analyzes in detail the highway route design and the design of two common interchanges,in order to improve the highway route design and the quality and efficiency of highway construction.
文摘The construction and operation of expressways will also bring a series of environmental and ecological problems,such as land use conflicts,ecological damage,environmental pollution,etc.In order to solve such problems,it is necessary to strengthen the application of landscape ecology.From the perspective of landscape ecology,this paper first introduces the impact of expressways on the ecological environment,and then analyzes the principles of expressway ecological landscape design.Landscaping,ecological environment,customer satisfaction,and other aspects have all performed well,with an optimization rate of over 90%.Future expressway design can strengthen the application of landscape ecology.
文摘China's road network consists of numerous older expressways experiencing high traffic volumes and severe congestion,necessitating urgent reconstruction and expansion efforts.This study discusses the reconstruction and expansion project of the Yinkun Expressway's Chongqing High-tech Zone to Rongchang District section,with a detailed exploration of the entire design process.Through a comprehensive analysis,the strengths and weaknesses of different plans are examined,so as to determine the optimal plan.The design chosen saves costs while effectively addressing traffic demands.Additionally,the study summarizes the valuable design insights gained from this interchange transformation,aiming to provide valuable reference for similar interchange projects in the future.
基金The National Natural Science Foundation of China (No.50422283)the Science and Technology Key Plan Project of Henan Province (No.072102360060)
文摘In order to solve the problems of potential incident rescue on expressway networks, the opportunity cost-based method is used to establish a resource dispatch decision model. The model aims to dispatch the rescue resources from the regional road networks and to obtain the location of the rescue depots and the numbers of service vehicles assigned for the potential incidents. Due to the computational complexity of the decision model, a scene decomposition algorithm is proposed. The algorithm decomposes the dispatch problem from various kinds of resources to a single resource, and determines the original scene of rescue resources based on the rescue requirements and the resource matrix. Finally, a convenient optimal dispatch scheme is obtained by decomposing each original scene and simplifying the objective function. To illustrate the application of the decision model and the algorithm, a case of the expressway network is studied on areas around Nanjing city in China and the results show that the model used and the algorithm proposed are appropriate.
基金The National Natural Science Foundation of China(No.71101014,50679008)Specialized Research Fund for the Doctoral Program of Higher Education(No.200801411105)the Science and Technology Project of the Department of Communications of Henan Province(No.2010D107-4)
文摘Aiming at the real-time fluctuation and nonlinear characteristics of the expressway short-term traffic flow forecasting the parameter projection pursuit regression PPPR model is applied to forecast the expressway traffic flow where the orthogonal Hermite polynomial is used to fit the ridge functions and the least square method is employed to determine the polynomial weight coefficient c.In order to efficiently optimize the projection direction a and the number M of ridge functions of the PPPR model the chaos cloud particle swarm optimization CCPSO algorithm is applied to optimize the parameters. The CCPSO-PPPR hybrid optimization model for expressway short-term traffic flow forecasting is established in which the CCPSO algorithm is used to optimize the optimal projection direction a in the inner layer while the number M of ridge functions is optimized in the outer layer.Traffic volume weather factors and travel date of the previous several time intervals of the road section are taken as the input influencing factors. Example forecasting and model comparison results indicate that the proposed model can obtain a better forecasting effect and its absolute error is controlled within [-6,6] which can meet the application requirements of expressway traffic flow forecasting.
基金Supported by the program from Shaanxi Provincial Expressway Management Office(05HX01)~~
文摘To understand the effect of the running of Shaanxi Inner Mongolia Expressway on food crops planted along the sides, we determined the heavy metal contents(Zn, Pb, Cu and Cb) in the digestion solutions of the root, stem and leaf from rice and corn. The results showed that highway promoted the accumulation of heavy metal elements in corn and rice. Compared with the CKs(crops produced where no highway extend), contents of heavy metal elements in two crops tested from two sampling sites were both over standard. This indicates that food crops planted within 100 m away from the highway are been polluted by heavy metals, which is directly related with the running of Shaanxi Inner Mongolia Expressway. Based on this, the areas within 100 m away from the highway are not suggested to cultivate food crops.
基金The National Natural Science Foundation of China(No.51238008)
文摘The macroscopic fundamental diagram( MFD) is studied to obtain the aggregate behavior of traffic in cities. This paper investigates the existence and the characteristics of different types of daily MFD for the Shanghai urban expressway network. The existence of MFD in the Shanghai urban expressway network is proved based on two weeks' data.Moreover, the hysteresis phenomena is present in most days and the network exhibits different hysteresis loops under different traffic situations. The relationship between the hysteresis phenomena and the inhomogeneity of traffic distribution is verified. The MFDs in the years of 2009 and 2012 are compared. The hysteresis loop still exists in 2012, which further verifies the existence of the hysteresis phenomenon. The direct relationship between the length of the hysteresis loop( ΔO) and the congestion is proved based on sufficient data. The width of the hysteresis loop, i. e., the drop in network flow( ΔQ) has no relationship with the congestion, and it varies from day to day under different traffic situations.
文摘With expressway development and environment protection consciousness improving, slope protection technology with vegetation has drawn much more attention. From the perspective of ecology, Baoji-Hanzhong Expressway maximized slope protection technology with vegetation and formed attracting landscapes on basis of eco-protection. This research introduced the technology of Baoji-Hanzhong Expressway, and explored a low-cost and effective biological slopeprotection way, suitable for Baoji-Hanzhong Expressway, according to slope protection technologies, at home and abroad, with botany, water and soil conservation engineering, and architecture, which fixed and stabilized slopes, prevented rainfall scouring, and advanced slope protection development in China.
文摘The concept of cultural landscapes was introduced,and it was proposed that the construction of highway cultural landscapes should follow the principles of "protection first,secure,integrated,suitable for actual conditions,economic,natural and ecological".In this study,relevant theories were taken to analyze the design of cultural landscapes along the Ya'an-Luguhu Expressway in Sichuan Province.Natural conditions,profound cultures and historical resources in the study area were analyzed,and the construction of its cultural landscapes was further discussed from the perspectives of properly dividing landscape spaces,determining the orientation of cultural landscapes,refining regional cultures,choosing carriers of cultural landscapes,improving cultural value of important landscape nodes by using artistic settings,applying more local materials and so on.So that helpful references could be provided for the landscape design of other expressways,and the integration of cultural landscapes and highway landscape system could be realized.
文摘This article focuses on bridge testing technologies in highway construction and expansion projects.It provides an overview of the inspection process for bridges in highway reconstruction and expansion projects,the main inspections,and strategies for improving the quality of inspections.Relevant units should conduct bridge inspections using appearance inspections,special inspections,and bearing capacity assessments in highway reconstruction and expansion projects.To effectively improve testing quality,relevant units should also focus on establishing and improving testing standards,strengthening material testing,and improving the overall quality of the testing personnel.This research aims to enhance the quality of highway reconstruction and expansion projects by supporting the sensible application of bridge inspection technology.
基金funded by the Strategic Priority Research Program of the Chinese Academy of Sciences"Environmental Changes and Green Silk Road Construction in Pan-Third Pole Region"(XDA2003020201)the National Key Research and Development Program of China(2017YFE0109200)the National Natural Science Foundation of China(41571011)
文摘Many desert expressways are affected by the deposition of the wind-blown sand,which might block the movement of vehicles or cause accidents.W-beam central guardrails,which are used to improve the safety of desert expressways,are thought to influence the deposition of the wind-blown sand,but this has yet not to be studied adequately.To address this issue,we conducted a wind tunnel test to simulate and explore how the W-beam central guardrails affect the airflow,the wind-blown sand flux and the deposition of the wind-blown sand on desert expressways in sandy regions.The subgrade model is 3.5 cm high and 80.0 cm wide,with a bank slope ratio of 1:3.The W-beam central guardrails model is 3.7 cm high,which included a 1.4-cm-high W-beam and a 2.3-cm-high stand column.The wind velocity was measured by using pitot-static tubes placed at nine different heights(1,2,3,5,7,10,15,30 and 50 cm)above the floor of the chamber.The vertical distribution of the wind-blown sand flux in the wind tunnel was measured by using the sand sampler,which was sectioned into 20 intervals.In addition,we measured the wind-blown sand flux in the field at K50 of the Bachu-Shache desert expressway in the Taklimakan Desert on 11 May 2016,by using a customized 78-cm-high gradient sand sampler for the sand flux structure test.Obstruction by the subgrade leads to the formation of two weak wind zones located at the foot of the windward slope and at the leeward slope of the subgrade,and the wind velocity on the leeward side weakens significantly.The W-beam central guardrails decrease the leeward wind velocity,whereas the velocity increases through the bottom gaps and over the top of the W-beam central guardrails.The vertical distribution of the wind-blown sand flux measured by wind tunnel follows neither a power-law nor an exponential function when affected by either the subgrade or the W-beam central guardrails.At 0.0H and 0.5H(where H=3.5 cm,which is the height of the subgrade),the sand transport is less at the 3 cm height from the subgrade surface than at the 1 and 5 cm heights as a result of obstruction by the W-beam central guardrails,and the maximum sand transportation occurs at the 5 cm height affected by the subgrade surface.The average saltation height in the presence of the W-beam central guardrails is greater than the subgrade height.The field test shows that the sand deposits on the overtaking lane leeward of the W-beam central guardrails and that the thickness of the deposited sand is determined by the difference in the sand mass transported between the inlet and outlet points,which is consistent with the position of the minimum wind velocity in the wind tunnel test.The results of this study could help us to understand the hazards of the wind-blown sand onto subgrade with the W-beam central guardrails.
基金Project(2018YJS081)supported by the Fundamental Research Funds for the Central Universities,ChinaProjects(71273024,51578052)supported by the National Natural Science Foundation of China(NSFC)
文摘Identifying bottlenecks and analyzing their characteristics are important tasks to city traffic management authorities.Although the speed difference was proposed for the bottleneck identification in the existing research,the use of a secondary indicator has not been fully discussed.This paper strived to develop a method to identify the bottleneck on expressways by using the massive floating car data(FCD)in Beijing.First,the speed characteristics of bottlenecks on expressway were analyzed based on the speed contour map.The results indicated that there was a significant difference between speeds on the bottleneck and downstream links when a bottleneck was observed.The speed difference could indeed be used as the primary indicator to identify the bottleneck.However,it was also shown that a sufficiently large speed difference does not necessitate an activation of a bottleneck.The speed-at-capacity was then used as the secondary indicator to distinguish the real bottleneck from the non-bottleneck speed difference.Second,a practical method for identifying the bottleneck on expressways was developed based on the speed difference and the speed-at-capacity.Finally,the method was applied to identifying the bottlenecks of the 3rd Outer Ring Expressway in Beijing.The duration,affected distance,delay and cause were used to evaluate and analyze the bottlenecks.