A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating c...A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating company(Genco)was defined as the profit from the energy auction market minus maintenance cost and risk loss.The compensation fee of interruptible load was a part of the maintenance cost when the permitted maintenance capacity in the system was insufficient.Hourly energy auction was incorporated in the computation of both revenues from energy market and risk loss of maintenance strategy as a nested game.A new heuristic search algorithm for the calculation of the game equilibrium of MSU was presented,which coordinates the solutions of non-equilibrium,unique equilibrium and multiple equilibria.Numerical results for a two-Genco system and a realistic system were used to demonstrate the basic ideas and the applicability of the proposed method,as well as its computational efficiency.展开更多
With the continuous growth of the tertiary industry and residential loads,balancing the power supply and consumption during peak demand time has become a critical issue.Some studies try to alleviate peak load by incre...With the continuous growth of the tertiary industry and residential loads,balancing the power supply and consumption during peak demand time has become a critical issue.Some studies try to alleviate peak load by increasing power generation on the supply side.Due to the short duration of peak load,this may cause redundant installation capacity.Alternatively,others attempt to shave peak demand by installing energy storage facilities.However,the aforementioned research did not consider interruptible load regulation when optimizing system operations.In fact,regulating interruptible load has great potential for reducing system peak load.In this paper,an interruptible load scheduling model considering the user subsidy rate is first proposed to reduce system peak load and operational costs.This model has fully addressed the constraints of minimum daily load reduction and user interruption load time.After that,by taking a community in Shanghai as an example,the improved chicken swarm optimization algorithm is applied to solve the interruptible load scheduling scheme.Finally,the simulation results validate the efficacy of the proposed optimization algorithm and indicate the significant advantages of the proposed model in alleviating the peak load and reducing operational costs.展开更多
基金The National High Technology Research and Development Program of China(863Program)(No.2005AA505101-621)Important Science and Technology Research Project of Shanghai(No.041612012)
文摘A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating company(Genco)was defined as the profit from the energy auction market minus maintenance cost and risk loss.The compensation fee of interruptible load was a part of the maintenance cost when the permitted maintenance capacity in the system was insufficient.Hourly energy auction was incorporated in the computation of both revenues from energy market and risk loss of maintenance strategy as a nested game.A new heuristic search algorithm for the calculation of the game equilibrium of MSU was presented,which coordinates the solutions of non-equilibrium,unique equilibrium and multiple equilibria.Numerical results for a two-Genco system and a realistic system were used to demonstrate the basic ideas and the applicability of the proposed method,as well as its computational efficiency.
文摘With the continuous growth of the tertiary industry and residential loads,balancing the power supply and consumption during peak demand time has become a critical issue.Some studies try to alleviate peak load by increasing power generation on the supply side.Due to the short duration of peak load,this may cause redundant installation capacity.Alternatively,others attempt to shave peak demand by installing energy storage facilities.However,the aforementioned research did not consider interruptible load regulation when optimizing system operations.In fact,regulating interruptible load has great potential for reducing system peak load.In this paper,an interruptible load scheduling model considering the user subsidy rate is first proposed to reduce system peak load and operational costs.This model has fully addressed the constraints of minimum daily load reduction and user interruption load time.After that,by taking a community in Shanghai as an example,the improved chicken swarm optimization algorithm is applied to solve the interruptible load scheduling scheme.Finally,the simulation results validate the efficacy of the proposed optimization algorithm and indicate the significant advantages of the proposed model in alleviating the peak load and reducing operational costs.