Because the standard four-stage operation and con-trol strategy cannot fully utilize the gravitational potential energy of a train operating on a long and steep downhill segment,this paper further improves the method ...Because the standard four-stage operation and con-trol strategy cannot fully utilize the gravitational potential energy of a train operating on a long and steep downhill segment,this paper further improves the method for train operation and control strategy.The improved operation includes three stages of acceleration,coasting-speed limit cruising,and brak-ing.Taking the speed limit,time limit,and distance limit as the constraints,the coasting condition switching point,braking condition switching point,traction coefficient,and braking force coefficient are used as the decision variables.Then,an improved train traction energy consumption model is constructed,and an improved differential evolution algorithm is designed to solve this model.The improved method is used to simulate two long and steep downhill segments of the Nanning metro.The results show that the improved method can meet the requirements of speed limit,time limit,and distance limit.Compared with the standard four-stage operation,the improved train operation and control strategy can reduce train energy consumption by more than 40%on the two long and steep downhill segments;compared with other similar algorithms,the improved algorithm is more suitable for solving the model.展开更多
Purpose-This study aims to improve the passenger accessibility of passenger demands in the end-ofoperation period.Design/methodology/approach-A mixed integer nonlinear programming model for last train timetable optim...Purpose-This study aims to improve the passenger accessibility of passenger demands in the end-ofoperation period.Design/methodology/approach-A mixed integer nonlinear programming model for last train timetable optimization of the metro was proposed considering the constraints such as the maximum headway,the minimum headway and the latest end-of-operation time.The objective of the model is to maximize the number of reachable passengers in the end-of-operation period.A solution method based on a preset train service is proposed,which significantly reduces the variables of deciding train services in the original model and reformulates it into a mixed integer linear programming model.Findings-The results of the case study of Wuhan Metro show that the solution method can obtain highquality solutions in a shorter time;and the shorter the time interval of passenger flow data,the more obvious the advantage of solution speed;after optimization,the number of passengers reaching the destination among the passengers who need to take the last train during the end-of-operation period can be increased by 10%.Originality/value-Existing research results only consider the passengers who take the last train.Compared with previous research,considering the overall passenger demand during the end-of-operation period can make more passengers arrive at their destination.Appropriately delaying the end-of-operation time can increase the proportion of passengers who can reach the destination in the metro network,but due to the decrease in passenger demand,postponing the end-of-operation time has a bottleneck in increasing the proportion of passengers who can reach the destination.展开更多
In large cities with heavily congested metro lines, unexpected disturbances often occur, which may cause severe delay of multiple trains, blockage of partial lines, and reduction of passenger service. Metro dispatcher...In large cities with heavily congested metro lines, unexpected disturbances often occur, which may cause severe delay of multiple trains, blockage of partial lines, and reduction of passenger service. Metro dispatchers have taken a practical strategy of rescheduling the timetable and adding several backup trains in storage tracks to alleviate waiting passengers from crowding the platforms and recover from such disruptions. In this study,we first develop a mixed integer programming model to determine the optimal train rescheduling plan with considerations of in-service and backup trains. The aim of train rescheduling is to frequently dispatch trains to evacuate delayed passengers after the disruption. Given the nonlinearity of the model, several linearization techniques are adapted to reformulate the model into an equivalent linear model that can be easily handled by the optimization software. Numerical experiments are implemented to verify the effectiveness of the proposed train rescheduling approach.展开更多
为研究随机列车荷载作用下钢弹簧浮置板轨道(steel spring floating slab track,简称SSFST)上线运营后的减振效果,选取某地铁线路同一区间、同一曲线段内的普通无砟轨道及钢弹簧浮置板轨道典型测试断面,在同一天内开展了现场对比测试。...为研究随机列车荷载作用下钢弹簧浮置板轨道(steel spring floating slab track,简称SSFST)上线运营后的减振效果,选取某地铁线路同一区间、同一曲线段内的普通无砟轨道及钢弹簧浮置板轨道典型测试断面,在同一天内开展了现场对比测试。研究结果表明:钢弹簧浮置板轨道减振效果的线上评估结果与列车、轨道的实际运营状态直接相关;在不同列车的随机激励作用下,Z振级相对插入损失(ΔVL_(Z,max))相差超过10 dB,且部分测试样本无法满足特殊减振的设计需求;为获得保守的评价结果,应选择轮、轨平顺状态良好的运营区段开展对比测试;通过合理的养护维修,使运营列车及轨道保持良好的运行状态,是减振轨道区段满足振动控制需求的关键。展开更多
基金the National Natural Science Foundation of China(52072081)the Key Project of Science and Technology of Guangxi(2023AA19005)Guangxi Manufacturing Systems and Advanced Manufacturing Technology Key Laboratory Director Fund(22-050-44-S015).
文摘Because the standard four-stage operation and con-trol strategy cannot fully utilize the gravitational potential energy of a train operating on a long and steep downhill segment,this paper further improves the method for train operation and control strategy.The improved operation includes three stages of acceleration,coasting-speed limit cruising,and brak-ing.Taking the speed limit,time limit,and distance limit as the constraints,the coasting condition switching point,braking condition switching point,traction coefficient,and braking force coefficient are used as the decision variables.Then,an improved train traction energy consumption model is constructed,and an improved differential evolution algorithm is designed to solve this model.The improved method is used to simulate two long and steep downhill segments of the Nanning metro.The results show that the improved method can meet the requirements of speed limit,time limit,and distance limit.Compared with the standard four-stage operation,the improved train operation and control strategy can reduce train energy consumption by more than 40%on the two long and steep downhill segments;compared with other similar algorithms,the improved algorithm is more suitable for solving the model.
基金supported by Talents Funds for Basic Scientific Research Business Expenses of Central Colleges and Universities (Grant No.2021RC228)Special Funds for Basic Scientific Research Business Expenses of Central Colleges and Universities (Grant No.2021YJS103).
文摘Purpose-This study aims to improve the passenger accessibility of passenger demands in the end-ofoperation period.Design/methodology/approach-A mixed integer nonlinear programming model for last train timetable optimization of the metro was proposed considering the constraints such as the maximum headway,the minimum headway and the latest end-of-operation time.The objective of the model is to maximize the number of reachable passengers in the end-of-operation period.A solution method based on a preset train service is proposed,which significantly reduces the variables of deciding train services in the original model and reformulates it into a mixed integer linear programming model.Findings-The results of the case study of Wuhan Metro show that the solution method can obtain highquality solutions in a shorter time;and the shorter the time interval of passenger flow data,the more obvious the advantage of solution speed;after optimization,the number of passengers reaching the destination among the passengers who need to take the last train during the end-of-operation period can be increased by 10%.Originality/value-Existing research results only consider the passengers who take the last train.Compared with previous research,considering the overall passenger demand during the end-of-operation period can make more passengers arrive at their destination.Appropriately delaying the end-of-operation time can increase the proportion of passengers who can reach the destination in the metro network,but due to the decrease in passenger demand,postponing the end-of-operation time has a bottleneck in increasing the proportion of passengers who can reach the destination.
基金supported by the National Natural Science Foundation of China (Nos. 61503020, 61403020 and U1434209)the Beijing Laboratory of Urban Rail Transit, the Beijing Key Laboratory of Urban Rail Transit Automation and Controlthe Major Program of Beijing Municipal Science & Technology Commission under Grant Z161100001016006
文摘In large cities with heavily congested metro lines, unexpected disturbances often occur, which may cause severe delay of multiple trains, blockage of partial lines, and reduction of passenger service. Metro dispatchers have taken a practical strategy of rescheduling the timetable and adding several backup trains in storage tracks to alleviate waiting passengers from crowding the platforms and recover from such disruptions. In this study,we first develop a mixed integer programming model to determine the optimal train rescheduling plan with considerations of in-service and backup trains. The aim of train rescheduling is to frequently dispatch trains to evacuate delayed passengers after the disruption. Given the nonlinearity of the model, several linearization techniques are adapted to reformulate the model into an equivalent linear model that can be easily handled by the optimization software. Numerical experiments are implemented to verify the effectiveness of the proposed train rescheduling approach.