期刊文献+
共找到2,164篇文章
< 1 2 109 >
每页显示 20 50 100
Numerical simulation of dynamic response of operating metro tunnel induced by ground explosion 被引量:16
1
作者 Yubing Yang Xiongyao Xie Rulu Wang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2010年第4期373-384,共12页
To evaluate the effects of possible ground explosion on a shallow-buried metro tunnel, this paper attempts to analyze the dynamic responses of the operating metro tunnel in soft soil, using a widely applied explicit d... To evaluate the effects of possible ground explosion on a shallow-buried metro tunnel, this paper attempts to analyze the dynamic responses of the operating metro tunnel in soft soil, using a widely applied explicit dynamic nonlinear finite element software ANSYS/LS-DYNA. The blast induced wave propagation in the soil and the tunnel, and the von Mises effective stress and acceleration of the tunnel lining were presented, and the safety of the tunnel lining was evaluated based on the failure criterion. Besides, the parametric study of the soil was also carried out. The numerical results indicate that the upper part of the tunnel lining cross-section with directions ranging from 0° to 22.5° and horizontal distances 0 to 7 m away from the explosive center are the vulnerable areas, and the metro tunnel might be safe when tunnel depth is more than 7 m and TNT charge on the ground is no more than 500 kg, and the selection of soil parameters should be paid more attentions to conduct a more precise analysis. 展开更多
关键词 ground surface explosion numerical simulation metro tunnel dynamic response
下载PDF
Deformation characteristics and safety assessment of a high-speed railway induced by undercutting metro tunnel excavation 被引量:19
2
作者 Wangping Qian Taiyue Qi +2 位作者 Yunjian Zhao Yizhou Le Haiyang Yi 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2019年第1期88-98,共11页
Stratum deformation(settlement) is a challenging issue in tunnel engineering, especially when construction of metro tunnels has to undercut high-speed railway. For this purpose, we used the FLAC30 software to analyze ... Stratum deformation(settlement) is a challenging issue in tunnel engineering, especially when construction of metro tunnels has to undercut high-speed railway. For this purpose, we used the FLAC30 software to analyze the stratum settlement characteristics of high-speed railway at different crossing angles intersected by metro tunnel, in terms of ground settlement trough, stratum slip line and irregularity of ballastless tracks. According to the evolution of the stratum settlement at different angle regions, an optimized angle is proposed for the actual project design. In order to reduce the influence of stratum settlement on the safety of high-speed railway, an approach of safety assessment is proposed for the shield engineering undercutting high-speed railway, as per Chinese specifications using numerical results and on-site conditions. A case study is conducted for the shield tunnel section crossing the Wuhan-Guangzhou High-speed Railway between the Guangzhou North Railway Station and the Huacheng Road Station, which represents the first metro tunnel project passing below a high-speed railway in China. A series of measures is taken to ensure the safe excavation of the shield tunnel and the operation of the high-speed railway. The results can provide a technical support for performing a safety evaluation between high-speed railways and metro tunnels. 展开更多
关键词 metro tunnel EXCAVATION High-speed railway SETTLEMENT characteristics Safety assessment Numerical simulation Case application
下载PDF
Strata consolidation subsidence induced by metro tunneling in saturated soft clay strata 被引量:1
3
作者 Taiyue QI Bo GAO 《Journal of Modern Transportation》 2011年第1期35-41,共7页
To choose the optimum construction method of metro tunneling,we conducted research with numerical simulation on strata consolidation subsidence by dewatering,dynamic dewatering,and non-dewatering construction method,t... To choose the optimum construction method of metro tunneling,we conducted research with numerical simulation on strata consolidation subsidence by dewatering,dynamic dewatering,and non-dewatering construction method,taking the integrated effects of fluid-solid coupling and tunneling mechanics into account.We obtained the curved surfaces of ground surface subsidence and strata consolidation subsidence.The results show that the quantity of ground surface subsidence is 31 mm for the non-dewatering method,39 mm for the dynamic dewatering method,and 105 mm for the dewatering method.Their ratio is 1:1.3:3.4;and the percentages of strata consolidation subsidence to whole ground surface subsidence of each construction method is 27(no-dewatering),50(dynamic dewatering),and 79(dewatering).It is obvious that the non-dewatering construction method is the most effective method to control the strata consolidation subsidence induced by metro tunneling in saturated soft clay strata,and it has been successfully applied to the construction of the Shenzhen metro line 1. 展开更多
关键词 隧道施工方法 地层下陷 地铁隧道 饱和 粘土层 地面沉降量 沉降脱水 地铁1号线
下载PDF
Influence of extreme shallow jacked box tunnelling on underlying metro tunnels:A case study
4
作者 Xiaobing Xu Lei Tong +4 位作者 Zhuofeng Li Xingwang Liu Qi Hu Hongbo Yao Junyi Li 《Underground Space》 SCIE EI CSCD 2023年第5期234-250,共17页
The application of jacked box tunnelling for underground passages has grown rapidly in recent years in China.In this study,the design of an extreme shallow jacked box tunnel traversing the underlying metro tunnels was... The application of jacked box tunnelling for underground passages has grown rapidly in recent years in China.In this study,the design of an extreme shallow jacked box tunnel traversing the underlying metro tunnels was introduced.An innovative additional soil filling above the ground surface was carried out to overcome the overlying-soil-carrying effect of the extreme shallow jacked box tunnelling.The structural safety of metro tunnels during the jacking process was analyzed through in-situ monitoring.It indicated that the overlying-soil-carrying effect was successfully alleviated.The metro tunnels generally showed horizontal displacement towards the receiving shaft,uplift and horizontal stretch during the jacking process.The stop of jacking machine in front of obstacles generally contributed to the decrease of horizontal displacement,uplift and horizontal stretch of metro tunnels.The largest horizontal displacement(1.3–1.6 mm),uplift(1.5 mm)and horizontal convergence(1.6–1.8 mm)generally occurred when the reception of jacking machine was completed,and they all met the requirement of 2 mm for this project.The design and construction of this shallow jacked box tunnel project could provide references for future similar projects. 展开更多
关键词 Box tunnel metro tunnel Soil filling Displacement Convergence
下载PDF
Deformation analysis and safety assessment of existing metro tunnels affected by excavation of a foundation pit 被引量:4
5
作者 Shuaihua Ye Zhuangfu Zhao Denqun Wang 《Underground Space》 SCIE EI 2021年第4期421-431,共11页
The excavation of a foundation pit considerably affects the adjacent structures and underground pipelines owing to the change in the stress state of the surrounding soil,resulting in deformation.The study of an actual... The excavation of a foundation pit considerably affects the adjacent structures and underground pipelines owing to the change in the stress state of the surrounding soil,resulting in deformation.The study of an actual engineering case was conducted to examine the influence of excavation on the deformation of adjacent subway tunnels.The finite element analysis software PLAXIS 3D was used to simulate the entire excavation process.The structural design of the foundation pit was optimized based on the simulation results to ensure the stability of the foundation pit and the safety of the existing subway tunnel structure.Finally,the safety evaluation of the excavation of the foundation pit that caused the deformation of the adjacent subway tunnel was performed.The influence of the excavation and unloading of the foundation pit on the subway tunnel is closely related to the distance between the subway and the foundation pit,the amount of earthwork excavated at one time,and the engineering geological conditions.The results of this paper can provide useful reference for the design optimization and safety assessment of similar projects. 展开更多
关键词 Foundation pit excavation DEFORMATION metro tunnel Numerical simulation Safety assessment
下载PDF
Evaluation of train-induced settlement for metro tunnel in saturated clay based on an elastoplastic constitutive model 被引量:2
6
作者 Qiang Huang Hongwei Huang +2 位作者 Bin Ye Dongmei Zhang Feng Zhang 《Underground Space》 SCIE EI 2018年第2期109-124,共16页
In this study,a two-dimensional(2D)soil–water coupling dynamicfinite element(FE)analysis is conducted to investigate the effect of repeated train vibrations on the long-term settlement of a metro tunnel in saturated c... In this study,a two-dimensional(2D)soil–water coupling dynamicfinite element(FE)analysis is conducted to investigate the effect of repeated train vibrations on the long-term settlement of a metro tunnel in saturated clay.Particular attention is paid to the leakage prob-lem of the metro tunnel by assuming different permeability conditions,namely fully permeable,fully impermeable,and partially perme-able,on the periphery of the tunnel for simplicity.The train vibration load isfirst evaluated using a rail–fastener–tunnel–subgrade model and averaged over a characteristic length for 2D numerical analysis.Cyclic Mobility model is used to simulate the mechanical behaviors of saturated soft clay in the FE analysis.Excess pore water pressure(EPWP)and associated tunnel settlement in trial operation and normal operation are calculated using the FE code DBLEAVES for different permeability conditions.It is found that a very low EPWP is generated in the trial operation,which then increases rapidly to peak values at the early days of normal operation.Afterward,the EPWP diminishes gradually as the train vibration continues.The permeability of the tunnel lining plays a significant role in the distri-bution of EPWP around the tunnel but produces a minor influence on the development of tunnel settlement.The train-induced tunnel settlement is mainly caused by the static settlement resulting from the EPWP dissipation during train interval,while the dynamic settle-ment arising from dynamic consolidation in each train vibration only accounts for a small portion.According to the 2D dynamic FE analysis,thefinal train-induced settlement of the metro tunnel in saturated clay is estimated to reach 160 mm while the peak EPWP value can reach 26.55 kPa.The settlement discrepancies between the numerical method and empirical method are discussed in detail. 展开更多
关键词 Dynamic finite element analysis Cyclic M obility model Saturated clay Excess pore water pressure Settlement of metro tunnel Permecability
下载PDF
Novel SfM-DLT method for metro tunnel 3D reconstruction and Visualization 被引量:1
7
作者 Yadong Xue Sen Zhang +1 位作者 Mingliang Zhou Hehua Zhu 《Underground Space》 SCIE EI 2021年第2期134-141,共8页
Metro tunnels play a crucial role in urban transportation.However,with growing tunnel operation periods,defects,and large deformations appearing,these are influencing tunnel structural performance and threatening publ... Metro tunnels play a crucial role in urban transportation.However,with growing tunnel operation periods,defects,and large deformations appearing,these are influencing tunnel structural performance and threatening public safety.Three-dimensional(3D)tunnel reconstruction is an effective way to highlight tunnel conditions and provide a basis for engineering management and maintenance.However,the current methods of tunnel 3D reconstruction do not sufficiently combine the qualitative and quantitative characteristics of tunnel states.In this study,a novel method for metro tunnel 3D reconstruction based on structure from motion(SfM)and direct linear transformation(DLT)is proposed.The dimensionless 3D reconstruction point cloud acquired through the SfM method showcases the qualitative characteristics(such as leakage and pipelines)of the tunnel state.The close-range photogrammetry DLT method provides scale information missing from the SfM method and quantitative characteristics(such as profile deformation)of the tunnel state.The SfM-DLT method was tested in a Shanghai metro tunnel,and proved to be feasible and promising for future tunnel inspections. 展开更多
关键词 metro tunnel 3D reconstruction VISUALIZATION Structure from motion Direct linear transformation
下载PDF
Tunnelling performance prediction of cantilever boring machine in sedimentary hard-rock tunnel using deep belief network 被引量:1
8
作者 SONG Zhan-ping CHENG Yun +1 位作者 ZHANG Ze-kun YANG Teng-tian 《Journal of Mountain Science》 SCIE CSCD 2023年第7期2029-2040,共12页
Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in... Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel. 展开更多
关键词 Urban metro tunnel Cantilever boring machine Hard rock tunnel Performance prediction model Linear regression Deep belief network
原文传递
3D reconstruction and automatic leakage defect quantification of metro tunnel based on SfM-Deep learning method
9
作者 Yadong Xue Peizhe Shi +1 位作者 Fei Jia Hongwei Huang 《Underground Space》 SCIE EI 2022年第3期311-323,共13页
Various structural defects deteriorate tunnel operation status and threaten public safety.Current tunnel inspection methods face problems of low efficiency,high equipment expense,and difficult data management.Combinin... Various structural defects deteriorate tunnel operation status and threaten public safety.Current tunnel inspection methods face problems of low efficiency,high equipment expense,and difficult data management.Combining the deep learning model and the 3D reconstruction method based on structure from motion(SfM),this paper proposes a novel SfM-Deep learning method for tunnel inspection.The high-quality 3D tunnel model is constructed by using images taken every 1 m along the longitudinal direction.The instance segmentation of leakage in longitudinal images is realized using the mask region-based convolutional neural network deep learning model.The SfM-Deep learning method projects the texture of the images after defect recognition to the 3D model and realizes the visualization of leakage defects.By projecting the model to the design cylindrical surface and expanding it,the tunnel leakage area is quantified.Through its practical application in a Shanghai metro shield tunnel,the reliability of the proposed method was verified.The novel SfM-Deep learning method can help engineers efficiently carry out intelligent tunnel detection. 展开更多
关键词 3D reconstruction Leakage defect quantification VISUALIZATION metro tunnel Structure from motion Deep learning
下载PDF
Risk identification and risk mitigation during metro station construction by enlarging shield tunnel combined with cut-and-cover method 被引量:3
10
作者 Zhang, Xinjin Liu, Weining Lu, Meili 《Journal of Southeast University(English Edition)》 EI CAS 2008年第S1期142-146,共5页
Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a n... Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process. Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present, including a review of world-wide operational experience of similar projects, the study of generic guidance on hazards associated with the type of work being undertaken, and discussions with qualified and experienced staff from the project team, etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specific risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnels and demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement and a comprehensive risk assessment of the new-style construction method. 展开更多
关键词 shield tunnel cut-and-cover method metro station risk identification risk mitigation
下载PDF
The Use of Underground Metro Stations and Tunnels as Protective Structures in Case of Nuclear Emergencies
11
作者 Mohamed Farahat 《Journal of Environmental Science and Engineering(B)》 2016年第1期35-56,共22页
关键词 地铁车站 防护结构 核应急 隧道 保护结构 地下室 地铁站 地下车站
下载PDF
隧道轮廓激光雷达点云线特征共面约束标定方法
12
作者 王耀东 徐金杨 +2 位作者 朱力强 史红梅 方妍 《光学精密工程》 EI CAS CSCD 北大核心 2024年第6期774-784,共11页
地铁隧道断面轮廓参数测量过程中,需要对高速激光雷达点云进行高精度系统标定。特别是大场景隧道环境,对标定模板要求高,标定过程复杂,检测精度影响大。针对此问题,本论文提出了一种新颖的适用于地铁隧道轮廓点云的标定方法,并基于双激... 地铁隧道断面轮廓参数测量过程中,需要对高速激光雷达点云进行高精度系统标定。特别是大场景隧道环境,对标定模板要求高,标定过程复杂,检测精度影响大。针对此问题,本论文提出了一种新颖的适用于地铁隧道轮廓点云的标定方法,并基于双激光雷达测量系统,进行了算法研究。本方法设计了专用的手推行便携式标定系统,利用由点云数据提取的标定板线特征,建立目标函数,通过混合了遗传算法和Levenberg-Marquardt算法的非线性优化方法,寻找全局最优解从而实现对激光雷达的标定。实验结果表明:本方法对于两侧钢轨顶轨的标定误差在±1.5 mm以内;静态测量精度X误差在±1 mm内、Y误差在±4 mm内;当采集系统以5 km/h的速度进行数据采集时,动态测量精度X误差在±4 mm内、Y误差在±6 mm内。本方法能够实现激光雷达的高精度标定,算法鲁棒性强,具有易操作、环境适应性强的特点。 展开更多
关键词 激光雷达 地铁隧道 点云标定 共面约束 隧道断面
下载PDF
3D打印隧道衬砌-围岩界面力学性能研究
13
作者 瞿锋 《城市轨道交通研究》 北大核心 2024年第3期177-181,192,共6页
[目的]3D打印技术在工程结构施工的研究和应用已逐渐深入,应用3D打印建造地铁隧道开拓了一种新的思路和方法,而3D打印施工过程中,衬砌与隧道围岩的共构效果和协同工作性能的保障是构建隧道衬砌结构体系的关键,需对其进行深入研究。[方法... [目的]3D打印技术在工程结构施工的研究和应用已逐渐深入,应用3D打印建造地铁隧道开拓了一种新的思路和方法,而3D打印施工过程中,衬砌与隧道围岩的共构效果和协同工作性能的保障是构建隧道衬砌结构体系的关键,需对其进行深入研究。[方法]通过试验模拟不同围岩条件下的界面特性,深入研究了3D打印隧道施工中衬砌和围岩之间的粘结力学性能及其影响因素。[结果及结论]围岩表面的粗糙度对3D打印衬砌混凝土的粘结效果有显著影响,而表面涂覆涂层能够有效改善衬砌-围岩界面的粘结性能,通过填补衬砌-围岩界面的微观不平整有利于提高3D打印衬砌施工质量。 展开更多
关键词 地铁 隧道衬砌 3D打印 粗糙度 粘结力学性能 界面微观结构
下载PDF
大跨度人防隧道工程下穿施工对既有地铁隧道区间结构稳定性的影响
14
作者 麻凤海 董博 +1 位作者 宋帅 杨修猛 《城市轨道交通研究》 北大核心 2024年第4期33-39,共7页
[目的]为分析新建大跨度人防隧道工程小净距下穿既有地铁线路施工时对地铁隧道区间结构稳定性的影响,需对人防隧道下穿施工过程进行模拟研究。[方法]依托青岛某扁平大断面人防隧道下穿既有地铁区间隧道工程,建立了三维有限元模型,模拟... [目的]为分析新建大跨度人防隧道工程小净距下穿既有地铁线路施工时对地铁隧道区间结构稳定性的影响,需对人防隧道下穿施工过程进行模拟研究。[方法]依托青岛某扁平大断面人防隧道下穿既有地铁区间隧道工程,建立了三维有限元模型,模拟人防隧道开挖的全过程。重点分析了人防隧道设置的中隔墙在开挖过程中的力学响应及变形规律,以及整个施工过程对既有地铁车站及其区间隧道的影响情况。[结果及结论]人防隧道中隔墙在先行洞和后行洞施工过程中呈现出明显的偏压趋势;人防隧道初期支护结构受既有地铁隧道的上部拱顶效应与中隔墙的双重作用,呈现出罕见的前大后小的“四象限”分布规律,且右侧沉降值大于左侧沉降值;既有地铁车站及其区间结构受人防隧道开挖空间效应的影响明显,其变形趋势均表现为向开挖侧移动,但其变形值均小于规范规定的预警值。 展开更多
关键词 地铁隧道 人防隧道 小净距下穿 结构稳定性
下载PDF
隧道开挖对上覆既有管线影响的简化解析计算方法
15
作者 董瑞桥 施展斌 《城市轨道交通研究》 北大核心 2024年第2期27-30,37,共5页
[目的]当盾构隧道下穿既有管线时,会引起既有管线发生沉降变形,因此有必要通过理论计算对隧道开挖引起的上覆既有管线受力变形进行研究。[方法]基于两阶段法提出一种可预测隧道开挖对上覆既有管线变形响应影响的简化计算方法,先采用Loga... [目的]当盾构隧道下穿既有管线时,会引起既有管线发生沉降变形,因此有必要通过理论计算对隧道开挖引起的上覆既有管线受力变形进行研究。[方法]基于两阶段法提出一种可预测隧道开挖对上覆既有管线变形响应影响的简化计算方法,先采用Loganathan公式获得隧道开挖引起的周围土体自由竖向位移,并把土体自由竖向位移附加在既有管线轴线上,再将既有管线简化为无限长梁搁置于Vlazov地基模型,考虑管线侧向土体的影响,利用有限差分法获得管线纵向变形的解析解。[结果及结论]将所提简化计算方法与既有文献中的实际工程监测数据进行对比,验证了所提简化计算方法的合理性;将所提简化计算方法同退化的Vlazov地基模型及Winkler地基模型计算结果进行对比,验证了所提简化计算方法更贴近实测数据。地层损失率、隧道开挖半径的增大会引起既有管线沉降及弯矩的增大;增大新建隧道与既有管线的夹角能够减小管线沉降,但会造成管线弯矩的增大。 展开更多
关键词 地铁隧道 既有管线 解析解
下载PDF
富水砂层地铁盾构隧道渣土混合改良的流塑性与渗透性
16
作者 郑选荣 刘莹 +4 位作者 丁鹏程 李鹏 郭峰 陆宏朝 李军锋 《城市轨道交通研究》 北大核心 2024年第3期37-42,共6页
[目的]盾构在富水砂层中掘进时,易产生刀盘扭矩过高、磨损严重以及螺旋运输机喷涌等问题。为了保证施工的安全性,需对渣土进行改良。[方法]以西安地铁16号线某盾构区间工程为依托,根据砂土地层自稳性差、摩擦性高、渗透率高的特点选取... [目的]盾构在富水砂层中掘进时,易产生刀盘扭矩过高、磨损严重以及螺旋运输机喷涌等问题。为了保证施工的安全性,需对渣土进行改良。[方法]以西安地铁16号线某盾构区间工程为依托,根据砂土地层自稳性差、摩擦性高、渗透率高的特点选取渣土改良剂。通过渣土坍落度试验、渗透试验、现场试验相结合的方式,采用泡沫单独改良、泡沫及膨润土泥浆混合改良两种方案开展富水砂层渣土改良试验研究。[结果及结论]实际盾构掘进施工中,在考虑安全、高效、经济的前提下,结合室内试验所得数据,确定采用膨润土泥浆、泡沫混合改良的方案。当膨润土与水质量比为1/8,发泡液质量分数为3%时,改良剂性能满足施工要求;泡沫单独改良渣土受含水率影响大,含水率越高,泡沫最佳注入率越小。中砂的最佳改良方案是BIR(膨润土泥浆注入比)为10%,FIR(泡沫注入率)为20%~25%;砾砂的最佳改良方案是BIR为10%,FIR为35%~40%。工程实践表明,渣土混合改良效果良好,盾构掘进参数平稳。 展开更多
关键词 地铁 盾构隧道 渣土混合改良 流塑性 渗透性 富水砂层
下载PDF
时速120 km地铁快线空气动力学试验研究
17
作者 陈勇 李杨 +1 位作者 左建勇 梁习锋 《铁道科学与工程学报》 EI CAS CSCD 北大核心 2024年第3期1156-1167,共12页
为探明设计时速120 km快速地铁列车在多区段桥隧衔接线路运行时的气动效应和气密性能,采用实车试验的方法,在武汉某多区段桥隧衔接地铁快线对某4车编组的新研A型密封性地铁列车开展空气动力学测试。实验测试系统采用LL-250-15A型Kulite... 为探明设计时速120 km快速地铁列车在多区段桥隧衔接线路运行时的气动效应和气密性能,采用实车试验的方法,在武汉某多区段桥隧衔接地铁快线对某4车编组的新研A型密封性地铁列车开展空气动力学测试。实验测试系统采用LL-250-15A型Kulite压力传感器,通过测量列车外部和内部的瞬态压力变化,分析全线路车外压力波动特性,对比沿列车长度方向不同测点位置的压力变化幅值,并分析不同空调状态下的车内压力舒适性。经过3次实验测试分析,该实验的结果具有可重复性。研究结果表明:全线路运行时,列车在隧道段内加减速导致车外压力变化幅值明显大于高架段,气动效应最恶劣的位置为地下段人防门变截面处,列车上行通过该处时车外任意3 s内压力变化幅值为1 071 Pa,下行通过该处时车外任意3 s内压力变化幅值为905 Pa;相对于下行线全线路,上行线车外任意3 s内压力变化幅值大18.3%;列车正线运营时压力波保护阀会在压力变化剧烈区段进行动作响应,列车上行时,空调开启、压力波保护阀正常启用状态下,车内任意3 s内压力变化幅值相对于压力波保护阀打开未启用时减少了16%,下行时,减少了28%,空调压力波保护阀能够有效降低车外压力波动对车内气压变化的影响。本文研究成果可为快速地铁线路设计、地铁列车运营及地铁气密性优化提供参考依据。 展开更多
关键词 地铁快线 桥隧衔接 实车试验 压力波 气密性
下载PDF
地铁曲线波磨地段振动特性影响因素分析
18
作者 张鹏飞 张庆欢 +1 位作者 张云杰 邓诏辉 《噪声与振动控制》 CSCD 北大核心 2024年第2期164-170,196,共8页
为研究地铁曲线波磨地段振动特性影响因素,建立车辆-轨道及轨道-隧道-大地模型,分析不同波磨波深、隧道埋深、轨道减振措施下隧道壁及地面的振动响应。结果表明:减小钢轨波磨波深或增加隧道埋深,隧道壁和地面的垂向最大加速度和加速度... 为研究地铁曲线波磨地段振动特性影响因素,建立车辆-轨道及轨道-隧道-大地模型,分析不同波磨波深、隧道埋深、轨道减振措施下隧道壁及地面的振动响应。结果表明:减小钢轨波磨波深或增加隧道埋深,隧道壁和地面的垂向最大加速度和加速度分频最大振级均有减小趋势;采取不同轨道减振措施时,浮置板的减振效果最佳;隧道埋深和轨道减振措施的改变,不会改变隧道壁和地面加速度峰值的频段区间及加速度分频最大振级的中心频率;振动在隧道壁传递到地面的过程中高频衰减较快。 展开更多
关键词 振动与波 地铁 钢轨波磨 隧道壁-地面振动 减振措施
下载PDF
不同基坑开挖卸荷方案对既有地铁隧道结构的影响研究
19
作者 谢强 马瑗婕 +3 位作者 吴俊 董匡 程宝龙 涂正楠 《现代城市轨道交通》 2024年第5期77-82,共6页
随着城市建设不断推进,地下工程进入快速发展时期,基坑工程对下方既有结构的影响不可忽略。基于此,文章以某换乘地铁站项目上方基坑开挖为例,通过FLAC3D数值模拟软件,分析既有隧道结构上方基坑在一次性开挖、分区开挖、跳挖方案下隧道... 随着城市建设不断推进,地下工程进入快速发展时期,基坑工程对下方既有结构的影响不可忽略。基于此,文章以某换乘地铁站项目上方基坑开挖为例,通过FLAC3D数值模拟软件,分析既有隧道结构上方基坑在一次性开挖、分区开挖、跳挖方案下隧道洞顶结构的变形状态。分析结果表明,无论是否考虑反压作用,3种方案下洞顶结构竖向最大变形排序均为:一次性开挖方案>分区开挖方案>跳挖方案,跳挖方案相较于一次性开挖方案和分区开挖方案隧道洞顶最大位移分别减少了48.6%、38.3%,可有效降低基坑开挖变形量。相关研究可为此类工程施工方案选择提供参考和借鉴。 展开更多
关键词 既有地铁 下穿隧道 开挖方案 数值分析 机理研究
下载PDF
旁侧深大基坑开挖对邻近地铁隧道变形影响研究
20
作者 姜叶翔 羊逸君 +3 位作者 周波 陶庆军 徐鹏 丁智 《低温建筑技术》 2024年第1期141-144,共4页
为探究深基坑开挖对邻近地铁隧道的影响,文中以杭州某邻近地铁隧道的深基坑工程为背景,建立坑底在隧道正侧方的三维模型,分析基坑开挖过程中邻近隧道的变形规律,并结合研究结果提出相应的监测方法。结果表明基坑开挖时要重视隧道顶部的... 为探究深基坑开挖对邻近地铁隧道的影响,文中以杭州某邻近地铁隧道的深基坑工程为背景,建立坑底在隧道正侧方的三维模型,分析基坑开挖过程中邻近隧道的变形规律,并结合研究结果提出相应的监测方法。结果表明基坑开挖时要重视隧道顶部的裂缝监测;隧道变形以隆起为主,并产生远离基坑的水平位移及扭转;基坑与隧道水平距离超过25m后基坑开挖对隧道基本没有影响;基坑底板的施工能有效控制隧道变形,研究结果可为类似工程施工提供参考。 展开更多
关键词 深大基坑 地铁隧道 隧道变形
下载PDF
上一页 1 2 109 下一页 到第
使用帮助 返回顶部