Time effect of wet drilling pile is investigated through the static load experiment on pile No. 22 of Guanhe Bridge. Post-grouting under pile tip is adopted in the project. To study the bearing performance of the pile...Time effect of wet drilling pile is investigated through the static load experiment on pile No. 22 of Guanhe Bridge. Post-grouting under pile tip is adopted in the project. To study the bearing performance of the pile, the self-balanced method is used and two load cells are assembled in the pile body. The experiments are carried out before and after post-grouting. The upper part of the pile is not influenced by post-grouting under the pile tip. Experimental results of the upper part of the pile show that the bearing capacity and the rigidity of wet drilling pile increase with time passing on. Analysis results show the time effect of wet drilling pile is influenced by many factors, such as alteration of stress field around pile, characteristics of soil around pile, variety of mud cake, and property of residue under pile tip.展开更多
The construction of a new beamline,BL10U1,was completed at the Shanghai synchrotron radiation facility in 2020.This multipurpose beamline was designed to provide X-ray scattering techniques such as ultra-small-angle X...The construction of a new beamline,BL10U1,was completed at the Shanghai synchrotron radiation facility in 2020.This multipurpose beamline was designed to provide X-ray scattering techniques such as ultra-small-angle X-ray scattering(USAXS),small-angle X-ray scattering(SAXS),wide-angle X-ray scattering,and microfocus SAXS(μSAXS)for a broad user community.To realize fast time-resolved USAXS experiments,the beamline adopted an in-vacuum undulator with a total length of 1.6 m as the photon source.An in-house cryogenic-cooled double multilayer monochromator was installed to deliver a photon flux of approximately 10^(13) photons/s at a photon energy of 10 keV.The three-year successful operation of this beamline demonstrated that the monochromator operated smoothly,as expected.BL10U1 has three end stations in succession:USAXS end station,μSAXS end station,and end station for industrial applications.The minimum scattering vector q~0.0042 nm^(-1) at 10 keV can be achieved at the USAXS end station equipped with a 28 m-long and 1.8 m-diameter vacuum flight tube.At theμSAXS end station,a beam spot of less than 10×8μm was achieved for micro-SAXS experiments.In contrast,in situ experimental instruments up to 5 m high and 8 m wide can be mounted at the industrial application end station,which offers industrial scientists the opportunity to use their large industrial equipment.BL10U1 opens up a new capability to investigate phenomena such as non-equilibrium and dynamic processes of materials with a wide length scale from angstroms to micrometers with millisecond time resolution.In this paper,we also report beamline design considerations and commissioning results.展开更多
Background: Four factors determine the quality of an implantology kit: 1) Heat generated by the drills;2) Morphology of the osteotomy according to the diameter of the implant;3) Efficiency of collecting autologous bon...Background: Four factors determine the quality of an implantology kit: 1) Heat generated by the drills;2) Morphology of the osteotomy according to the diameter of the implant;3) Efficiency of collecting autologous bone;and 4) Osteotomy execution time. Materials and Methods: This article examines the heat produced by drills during osteotomy, focusing on the effect of the following factors: drilling technique;volume of autologous bone harvested;drilling time;implant primary stability;and the percentage of osseointegrated implants after primary healing. Discussion: The four factors mentioned above are analyzed based on the data obtained for sequential, biological, and One Drill milling techniques. Conclusions: 1) One Drill is the fastest technique for performing the osteotomy;2) All techniques stay within the biological temperature range of living bone, with the lowest increase in temperature achieved using One Drill with irrigation;3) The bone harvested showed no statistically significant differences between biological milling and the One Drill technique, both far superior to the sequential technique;and 4) There is no statistically significant difference in the number of osseointegrated implants among the three techniques analyzed.展开更多
In recent years, a new kind of drilling fluid system with unique structure micro-foam has been developed. Compared with other drilling fluid systems, it possesses many advantages. And it has been successfully applied ...In recent years, a new kind of drilling fluid system with unique structure micro-foam has been developed. Compared with other drilling fluid systems, it possesses many advantages. And it has been successfully applied in hundreds of wells to drill depleted reservoirs in the world wide. The geological structure is very complex in Haita area, it is difficult to achieve the requirement of increasing drilling rate by conventional drilling methods, even can’t make footage. The micro-foam drilling fluid can apply to Haita area, and solve the drilling problems commendably, which is comprehended by studying the structure and plugging, prevent caving, speed mechanism of the micro-foam drilling fluid. Field practice indicates that micro-foam drilling fluid technology can resolve the drilling problem effectively in Haita basin. It has the extremely vital significance to improve drilling speed, discover and protect reservoir stratum, decrease the risk of circulation loss and save the drilling cost.展开更多
Drilling and blasting play vital roles in opencast mining. These operations not only affect the cost of production directly but as well and significantly, the overall operational costs. This research was carried out t...Drilling and blasting play vital roles in opencast mining. These operations not only affect the cost of production directly but as well and significantly, the overall operational costs. This research was carried out to find a possible way of optimizing the drilling and blasting operations in an open pit mine of Somair (Société des Mines de l’Air), in the Niger Republic. In order to optimize the drilling operation, the time taken by two drilling machines to accomplish the same task was analyzed statistically. The result indicates that the Down the Hole Hammer Drilling Rig (DMNo406) is more efficient than the Drill Master (DM405). The relative unit consumption of two explosives (Explus and Nitram 9), when used under the same operating conditions, were also considered and the results indicate Explus to be more economical per unit consumption with a range of 0.15 g/t–0.183 g/t, when compared with Nitram 9 with a unit consumption range of 0.19 g/t-0.24 g/t in the study area.展开更多
During well drilling process,original stress state of hard brittle shale will be changed due to stress redistribution and concentration,which leads to stress damage phenomenon around the borehole.Consequently,drilling...During well drilling process,original stress state of hard brittle shale will be changed due to stress redistribution and concentration,which leads to stress damage phenomenon around the borehole.Consequently,drilling fluid will invade into formation along the tiny cracks induced by stress damage,and then weaken the strength of hard brittle shale.Based on this problem,a theoretical model was set up to discuss damage level of shale under uniaxial compression tests using acoustic velocity data.And specifically,considering the coupled effect of stress damage and drilling fluid,the relationship between hard brittle shale strength and elapsed time was analyzed.展开更多
The predictions by drilling-related mechanical and geological models are in some degree inaccurate due to non-unique solution of seismic velocity model.To address this problem,a new drilling technology guided by well-...The predictions by drilling-related mechanical and geological models are in some degree inaccurate due to non-unique solution of seismic velocity model.To address this problem,a new drilling technology guided by well-seismic information integration is proposed which consists of seismic velocity update of drilled formations,seismic velocity prediction of the formation ahead of drilling bit,and the prediction of geological feature and drilling geological environmental factors ahead of bit.In this technology,real information(velocity,formation and depth)behind the drilling bit and local pre-stack seismic data around the wellbore being drilled are used to correct the primitive seismic velocity field for a re-migration of seismic data and to update geological features and drilling geological environmental factors ahead of the drilling bit.Field application shows that this technology can describe and predict the geological features,drilling geological environmental factors and complex drilling problems ahead of the bit timely and improve the prediction efficiency and accuracy greatly.These new updated results are able to provide scientific basis for optimizing drilling decisions.展开更多
Micro-satellite cluster enables a whole new class of missions for communications, remote sensing, and scientific research for both civilian and military purposes. Synchronizing the time of the satellites in a cluster ...Micro-satellite cluster enables a whole new class of missions for communications, remote sensing, and scientific research for both civilian and military purposes. Synchronizing the time of the satellites in a cluster is important for both cluster sensing capabilities and its autonomous operating. However, the existing time synchronization methods are not suitable for microsatellite cluster, because it requires too many human interventions and occupies too much ground control resource. Although, data post-process may realize the equivalent time synchronization, it requires processing time and powerful computing ability on the ground, which cannot be implemented by cluster itself. In order to autonomously establish and maintain the time benchmark in a cluster, we propose a compact time difference compensation system(TDCS), which is a kind of time control loop that dynamically adjusts the satellite reference frequency according to the time difference. Consequently, the time synchronization in the cluster can be autonomously achieved on-orbit by synchronizing the clock of other satellites to a chosen one's. The experimental result shows that the standard deviation of time synchronization is about 102 ps when the carrier to noise ratio(CNR) is 95 d BHz, and the standard deviation of corresponding frequency difference is approximately0.36 Hz.展开更多
A numerical model was developed to investigate salinity distribution in the Yura Estuary, a micro tidal estuary in Japan. The model results show that the salinity distribution as represented by salt wedge intrusion ag...A numerical model was developed to investigate salinity distribution in the Yura Estuary, a micro tidal estuary in Japan. The model results show that the salinity distribution as represented by salt wedge intrusion agreed well with field observations. In addition to the seasonal variation, the salt wedge responds over short time scales according to the flood events. The retreat of the salt wedge is dependent on the scale of the river discharge;the salt wedge moved back and disappeared from the estuary when over250 m3·s-1 of fresh water was discharged from the estuary and it takes ~11 days for salt wedge to recover from the fresh water discharge event. The Yura Estuary has on average three floods during summer, this coincides with when phytoplankton is most productive in the river and indicates that the short temporal variations in the river discharge has important effects not only on the hydrodynamics, but also on the ecosystem in the estuary.展开更多
To gain a competitive edge within the international and compet让ive setting of coal markets, coal producers must find new ways of reducing costs. Increasing bench drilling efficiency and performance in open-cast coal ...To gain a competitive edge within the international and compet让ive setting of coal markets, coal producers must find new ways of reducing costs. Increasing bench drilling efficiency and performance in open-cast coal mines has the potential to generate savings. Specifically, monitoring, analyzing, and optimizing the drilling operation can reduce drilling costs. For example, determining the optimal drill bit replacement time will help to achieve the desirable penetration rate. This paper presents a life data analysis of drill bits to fit a statistical distribution using failure records. These results are then used to formulate a cost minimization problem to estimate the drill bit replacement time using the evolutionary algorithm. The effect of cost on the uncertainty associated with replacement time is assessed through Monte-Carlo simulation. The relationship between the total expected replacement cost and replacement time is also presented. A case study shows that the proposed approach can be used to assist with designing a drill bit replacement schedule and minimize costs in open-cast coal mines.展开更多
Based on the time series of GPS station coordinate in the international Earth reference frame (ITRF), we evaluate annual micro-behavior of strain field in Chinese mainland with the triangle method. The results show ...Based on the time series of GPS station coordinate in the international Earth reference frame (ITRF), we evaluate annual micro-behavior of strain field in Chinese mainland with the triangle method. The results show that the annual micro-behavior of strain field is divided into two parts by the north-south earthquake belt in the research region. The prevailing direction of compressive principal strain field is nearly consistent in the western region. From west to east, the direction varies from NS to NE. It is in accordance with the direction of the modem compressive principal strain field. This suggests that geologic deformation in western region was mainly caused by that India tectonic plate pushes the research region northward and the Siberia plate pushes it southward relatively. It is an inheritance of new tectonic motion. The prevailing direction of the compressive principal strain field does not exist in the eastern region .The annual biggest shear strain is different greatly in every grid-cell. The values varies from 4.13×10^-8 to 7.0×10^-10. By and large the annual biggest shear strain in the western region is bigger than that in the eastern region. And so is the variation between any two consecutive biggest annual shear strains in the same grid-cell. The annual surface dilatation show that in most grid-cells of the research region the surface dilatation is in compressibility, and the variation between any two consecutive annual surface dilatation in the same grid-cell is small.展开更多
The micro- and macro-time scales in two-phase turbulent channel flows are investigated using the direct nu- merical simulation and the Lagrangian particle trajectory methods for the fluid- and the particle-phases, res...The micro- and macro-time scales in two-phase turbulent channel flows are investigated using the direct nu- merical simulation and the Lagrangian particle trajectory methods for the fluid- and the particle-phases, respectively. Lagrangian and Eulerian time scales of both phases are cal- culated using velocity correlation functions. Due to flow anisotropy, micro-time scales are not the same with the theo- retical estimations in large Reynolds number (isotropic) tur- bulence. Lagrangian macro-time scales of particle-phase and of fluid-phase seen by particles are both dependent on particle Stokes number. The fluid-phase Lagrangian inte- gral time scales increase with distance from the wall, longer than those time scales seen by particles. The Eulerian inte- gral macro-time scales increase in near-wall regions but de- crease in out-layer regions. The moving Eulerian time scales are also investigated and compared with Lagrangian integral time scales, and in good agreement with previous measure- ments and numerical predictions. For the fluid particles the micro Eulerian time scales are longer than the Lagrangian ones in the near wall regions, while away from the walls the micro Lagrangian time scales are longer. The Lagrangian integral time scales are longer than the Eulerian ones. The results are useful for further understanding two-phase flow physics and especially for constructing accurate prediction models of inertial particle dispersion.展开更多
A low-power complementary metal oxide semiconductor(CMOS) operational amplifier (op-amp) for real-time signal processing of micro air vehicle (MAV) is designed in this paper.Traditional folded cascode architectu...A low-power complementary metal oxide semiconductor(CMOS) operational amplifier (op-amp) for real-time signal processing of micro air vehicle (MAV) is designed in this paper.Traditional folded cascode architecture with positive channel metal oxide semiconductor(PMOS) differential input transistors and sub-threshold technology are applied under the low supply voltage.Simulation results show that this amplifier has significantly low power,while maintaining almost the same gain,bandwidth and other key performances.The power required is only 0.12 mW,which is applicable to low-power and low-voltage real-time signal acquisition and processing system.展开更多
为定量识别城市非信控环形交叉口区域内的机动车冲突风险易发生点,降低环形交叉口的事故发生率,本文构建针对非信控环形交叉口机动车冲突风险识别模型。首先,利用无人机采集高精度、连续的多车辆轨迹视频,结合Kinovea视频运动分析软件...为定量识别城市非信控环形交叉口区域内的机动车冲突风险易发生点,降低环形交叉口的事故发生率,本文构建针对非信控环形交叉口机动车冲突风险识别模型。首先,利用无人机采集高精度、连续的多车辆轨迹视频,结合Kinovea视频运动分析软件实现运行车辆状态识别与跟踪,并记录车辆每一帧的运动数据;其次,基于交通冲突识别指标TTC(Time to Collision),提出适应环形交叉口道路线形特征的车辆TTC计算方法,并使用累计频率法确定严重、一般和轻微冲突的阈值分别为1.2,2.8,4.4 s;最后,通过绘制高峰和平峰交通冲突空间异步图,并结合交通冲突数和严重冲突率,对环形交叉口的36个子区段进行交通冲突风险等级评定。研究结果显示:在高峰时段,某一子区段的平均交通冲突发生次数约为15次,严重冲突率为17.45%;在平峰时段,某一子区段的平均交通冲突发生次数约为8次,严重冲突率为8.28%。重度风险区域在高峰时段占比达到50%,而在平峰时段为8.33%,这些重度风险区域主要集中在交织区段。因此,环形交叉口在高峰时段且位于交织区段的情况更易发生交通事故。本文研究成果有助于交通管理部门了解环形交叉口在不同时段和区段上的交通冲突情况和特征,以便采取相应的预警和管理措施。展开更多
文摘Time effect of wet drilling pile is investigated through the static load experiment on pile No. 22 of Guanhe Bridge. Post-grouting under pile tip is adopted in the project. To study the bearing performance of the pile, the self-balanced method is used and two load cells are assembled in the pile body. The experiments are carried out before and after post-grouting. The upper part of the pile is not influenced by post-grouting under the pile tip. Experimental results of the upper part of the pile show that the bearing capacity and the rigidity of wet drilling pile increase with time passing on. Analysis results show the time effect of wet drilling pile is influenced by many factors, such as alteration of stress field around pile, characteristics of soil around pile, variety of mud cake, and property of residue under pile tip.
基金This work was supported by the National Key R&D Program of China(No.2020YFA0405802)the Shanghai Large Scientific Facilities Center.
文摘The construction of a new beamline,BL10U1,was completed at the Shanghai synchrotron radiation facility in 2020.This multipurpose beamline was designed to provide X-ray scattering techniques such as ultra-small-angle X-ray scattering(USAXS),small-angle X-ray scattering(SAXS),wide-angle X-ray scattering,and microfocus SAXS(μSAXS)for a broad user community.To realize fast time-resolved USAXS experiments,the beamline adopted an in-vacuum undulator with a total length of 1.6 m as the photon source.An in-house cryogenic-cooled double multilayer monochromator was installed to deliver a photon flux of approximately 10^(13) photons/s at a photon energy of 10 keV.The three-year successful operation of this beamline demonstrated that the monochromator operated smoothly,as expected.BL10U1 has three end stations in succession:USAXS end station,μSAXS end station,and end station for industrial applications.The minimum scattering vector q~0.0042 nm^(-1) at 10 keV can be achieved at the USAXS end station equipped with a 28 m-long and 1.8 m-diameter vacuum flight tube.At theμSAXS end station,a beam spot of less than 10×8μm was achieved for micro-SAXS experiments.In contrast,in situ experimental instruments up to 5 m high and 8 m wide can be mounted at the industrial application end station,which offers industrial scientists the opportunity to use their large industrial equipment.BL10U1 opens up a new capability to investigate phenomena such as non-equilibrium and dynamic processes of materials with a wide length scale from angstroms to micrometers with millisecond time resolution.In this paper,we also report beamline design considerations and commissioning results.
文摘Background: Four factors determine the quality of an implantology kit: 1) Heat generated by the drills;2) Morphology of the osteotomy according to the diameter of the implant;3) Efficiency of collecting autologous bone;and 4) Osteotomy execution time. Materials and Methods: This article examines the heat produced by drills during osteotomy, focusing on the effect of the following factors: drilling technique;volume of autologous bone harvested;drilling time;implant primary stability;and the percentage of osseointegrated implants after primary healing. Discussion: The four factors mentioned above are analyzed based on the data obtained for sequential, biological, and One Drill milling techniques. Conclusions: 1) One Drill is the fastest technique for performing the osteotomy;2) All techniques stay within the biological temperature range of living bone, with the lowest increase in temperature achieved using One Drill with irrigation;3) The bone harvested showed no statistically significant differences between biological milling and the One Drill technique, both far superior to the sequential technique;and 4) There is no statistically significant difference in the number of osseointegrated implants among the three techniques analyzed.
文摘In recent years, a new kind of drilling fluid system with unique structure micro-foam has been developed. Compared with other drilling fluid systems, it possesses many advantages. And it has been successfully applied in hundreds of wells to drill depleted reservoirs in the world wide. The geological structure is very complex in Haita area, it is difficult to achieve the requirement of increasing drilling rate by conventional drilling methods, even can’t make footage. The micro-foam drilling fluid can apply to Haita area, and solve the drilling problems commendably, which is comprehended by studying the structure and plugging, prevent caving, speed mechanism of the micro-foam drilling fluid. Field practice indicates that micro-foam drilling fluid technology can resolve the drilling problem effectively in Haita basin. It has the extremely vital significance to improve drilling speed, discover and protect reservoir stratum, decrease the risk of circulation loss and save the drilling cost.
文摘Drilling and blasting play vital roles in opencast mining. These operations not only affect the cost of production directly but as well and significantly, the overall operational costs. This research was carried out to find a possible way of optimizing the drilling and blasting operations in an open pit mine of Somair (Société des Mines de l’Air), in the Niger Republic. In order to optimize the drilling operation, the time taken by two drilling machines to accomplish the same task was analyzed statistically. The result indicates that the Down the Hole Hammer Drilling Rig (DMNo406) is more efficient than the Drill Master (DM405). The relative unit consumption of two explosives (Explus and Nitram 9), when used under the same operating conditions, were also considered and the results indicate Explus to be more economical per unit consumption with a range of 0.15 g/t–0.183 g/t, when compared with Nitram 9 with a unit consumption range of 0.19 g/t-0.24 g/t in the study area.
基金Project(U262201)supported by National Natural Science Foundation of China
文摘During well drilling process,original stress state of hard brittle shale will be changed due to stress redistribution and concentration,which leads to stress damage phenomenon around the borehole.Consequently,drilling fluid will invade into formation along the tiny cracks induced by stress damage,and then weaken the strength of hard brittle shale.Based on this problem,a theoretical model was set up to discuss damage level of shale under uniaxial compression tests using acoustic velocity data.And specifically,considering the coupled effect of stress damage and drilling fluid,the relationship between hard brittle shale strength and elapsed time was analyzed.
基金Supported by the Sinopec Scientific Research Project(P17030-4)
文摘The predictions by drilling-related mechanical and geological models are in some degree inaccurate due to non-unique solution of seismic velocity model.To address this problem,a new drilling technology guided by well-seismic information integration is proposed which consists of seismic velocity update of drilled formations,seismic velocity prediction of the formation ahead of drilling bit,and the prediction of geological feature and drilling geological environmental factors ahead of bit.In this technology,real information(velocity,formation and depth)behind the drilling bit and local pre-stack seismic data around the wellbore being drilled are used to correct the primitive seismic velocity field for a re-migration of seismic data and to update geological features and drilling geological environmental factors ahead of the drilling bit.Field application shows that this technology can describe and predict the geological features,drilling geological environmental factors and complex drilling problems ahead of the bit timely and improve the prediction efficiency and accuracy greatly.These new updated results are able to provide scientific basis for optimizing drilling decisions.
基金supported by the National Natural Science Foundation of China(61401389)the Joint Fund of the Ministry of Education of China(6141A02033310)
文摘Micro-satellite cluster enables a whole new class of missions for communications, remote sensing, and scientific research for both civilian and military purposes. Synchronizing the time of the satellites in a cluster is important for both cluster sensing capabilities and its autonomous operating. However, the existing time synchronization methods are not suitable for microsatellite cluster, because it requires too many human interventions and occupies too much ground control resource. Although, data post-process may realize the equivalent time synchronization, it requires processing time and powerful computing ability on the ground, which cannot be implemented by cluster itself. In order to autonomously establish and maintain the time benchmark in a cluster, we propose a compact time difference compensation system(TDCS), which is a kind of time control loop that dynamically adjusts the satellite reference frequency according to the time difference. Consequently, the time synchronization in the cluster can be autonomously achieved on-orbit by synchronizing the clock of other satellites to a chosen one's. The experimental result shows that the standard deviation of time synchronization is about 102 ps when the carrier to noise ratio(CNR) is 95 d BHz, and the standard deviation of corresponding frequency difference is approximately0.36 Hz.
文摘A numerical model was developed to investigate salinity distribution in the Yura Estuary, a micro tidal estuary in Japan. The model results show that the salinity distribution as represented by salt wedge intrusion agreed well with field observations. In addition to the seasonal variation, the salt wedge responds over short time scales according to the flood events. The retreat of the salt wedge is dependent on the scale of the river discharge;the salt wedge moved back and disappeared from the estuary when over250 m3·s-1 of fresh water was discharged from the estuary and it takes ~11 days for salt wedge to recover from the fresh water discharge event. The Yura Estuary has on average three floods during summer, this coincides with when phytoplankton is most productive in the river and indicates that the short temporal variations in the river discharge has important effects not only on the hydrodynamics, but also on the ecosystem in the estuary.
文摘To gain a competitive edge within the international and compet让ive setting of coal markets, coal producers must find new ways of reducing costs. Increasing bench drilling efficiency and performance in open-cast coal mines has the potential to generate savings. Specifically, monitoring, analyzing, and optimizing the drilling operation can reduce drilling costs. For example, determining the optimal drill bit replacement time will help to achieve the desirable penetration rate. This paper presents a life data analysis of drill bits to fit a statistical distribution using failure records. These results are then used to formulate a cost minimization problem to estimate the drill bit replacement time using the evolutionary algorithm. The effect of cost on the uncertainty associated with replacement time is assessed through Monte-Carlo simulation. The relationship between the total expected replacement cost and replacement time is also presented. A case study shows that the proposed approach can be used to assist with designing a drill bit replacement schedule and minimize costs in open-cast coal mines.
基金National Natural Science Foundation of China (40074024).
文摘Based on the time series of GPS station coordinate in the international Earth reference frame (ITRF), we evaluate annual micro-behavior of strain field in Chinese mainland with the triangle method. The results show that the annual micro-behavior of strain field is divided into two parts by the north-south earthquake belt in the research region. The prevailing direction of compressive principal strain field is nearly consistent in the western region. From west to east, the direction varies from NS to NE. It is in accordance with the direction of the modem compressive principal strain field. This suggests that geologic deformation in western region was mainly caused by that India tectonic plate pushes the research region northward and the Siberia plate pushes it southward relatively. It is an inheritance of new tectonic motion. The prevailing direction of the compressive principal strain field does not exist in the eastern region .The annual biggest shear strain is different greatly in every grid-cell. The values varies from 4.13×10^-8 to 7.0×10^-10. By and large the annual biggest shear strain in the western region is bigger than that in the eastern region. And so is the variation between any two consecutive biggest annual shear strains in the same grid-cell. The annual surface dilatation show that in most grid-cells of the research region the surface dilatation is in compressibility, and the variation between any two consecutive annual surface dilatation in the same grid-cell is small.
基金supported by the National Natural Science Foundation of China (11132005 and 50706021)
文摘The micro- and macro-time scales in two-phase turbulent channel flows are investigated using the direct nu- merical simulation and the Lagrangian particle trajectory methods for the fluid- and the particle-phases, respectively. Lagrangian and Eulerian time scales of both phases are cal- culated using velocity correlation functions. Due to flow anisotropy, micro-time scales are not the same with the theo- retical estimations in large Reynolds number (isotropic) tur- bulence. Lagrangian macro-time scales of particle-phase and of fluid-phase seen by particles are both dependent on particle Stokes number. The fluid-phase Lagrangian inte- gral time scales increase with distance from the wall, longer than those time scales seen by particles. The Eulerian inte- gral macro-time scales increase in near-wall regions but de- crease in out-layer regions. The moving Eulerian time scales are also investigated and compared with Lagrangian integral time scales, and in good agreement with previous measure- ments and numerical predictions. For the fluid particles the micro Eulerian time scales are longer than the Lagrangian ones in the near wall regions, while away from the walls the micro Lagrangian time scales are longer. The Lagrangian integral time scales are longer than the Eulerian ones. The results are useful for further understanding two-phase flow physics and especially for constructing accurate prediction models of inertial particle dispersion.
基金Sponsored by the National Natural Science Foundation of China (60843005)the Basic Research Foundation of Beijing Institute of Technology(20070142018)
文摘A low-power complementary metal oxide semiconductor(CMOS) operational amplifier (op-amp) for real-time signal processing of micro air vehicle (MAV) is designed in this paper.Traditional folded cascode architecture with positive channel metal oxide semiconductor(PMOS) differential input transistors and sub-threshold technology are applied under the low supply voltage.Simulation results show that this amplifier has significantly low power,while maintaining almost the same gain,bandwidth and other key performances.The power required is only 0.12 mW,which is applicable to low-power and low-voltage real-time signal acquisition and processing system.
文摘为定量识别城市非信控环形交叉口区域内的机动车冲突风险易发生点,降低环形交叉口的事故发生率,本文构建针对非信控环形交叉口机动车冲突风险识别模型。首先,利用无人机采集高精度、连续的多车辆轨迹视频,结合Kinovea视频运动分析软件实现运行车辆状态识别与跟踪,并记录车辆每一帧的运动数据;其次,基于交通冲突识别指标TTC(Time to Collision),提出适应环形交叉口道路线形特征的车辆TTC计算方法,并使用累计频率法确定严重、一般和轻微冲突的阈值分别为1.2,2.8,4.4 s;最后,通过绘制高峰和平峰交通冲突空间异步图,并结合交通冲突数和严重冲突率,对环形交叉口的36个子区段进行交通冲突风险等级评定。研究结果显示:在高峰时段,某一子区段的平均交通冲突发生次数约为15次,严重冲突率为17.45%;在平峰时段,某一子区段的平均交通冲突发生次数约为8次,严重冲突率为8.28%。重度风险区域在高峰时段占比达到50%,而在平峰时段为8.33%,这些重度风险区域主要集中在交织区段。因此,环形交叉口在高峰时段且位于交织区段的情况更易发生交通事故。本文研究成果有助于交通管理部门了解环形交叉口在不同时段和区段上的交通冲突情况和特征,以便采取相应的预警和管理措施。