Near-surface deposits that extend to considerable depths are often amenable to both open pit mining and/or underground mining. This paper investigates the strategy of mining options for an orebody using a Mixed Intege...Near-surface deposits that extend to considerable depths are often amenable to both open pit mining and/or underground mining. This paper investigates the strategy of mining options for an orebody using a Mixed Integer Linear Programming(MILP) optimization framework. The MILP formulation maximizes the Net Present Value(NPV) of the reserve when extracted with(i) open pit mining,(ii) underground mining, and(iii) concurrent open pit and underground mining. Comparatively, implementing open pit mining generates a higher NPV than underground mining. However considering the investment required for these mining options, underground mining generates a better return on investment than open pit mining. Also, in the concurrent open pit and underground mining scenario, the optimizer prefers extracting blocks using open pit mining. Although the underground mine could access ore sooner, the mining cost differential for open pit mining is more than compensated for by the discounting benefits associated with earlier underground mining.展开更多
Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research metho...Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research methods in mining engineering. After the introductory review of properties and limitations of applying LP, short reviews of the general settings of deterministic and fuzzy LP models are presented. With the purpose of comparative analysis, the application of both LP models is presented using the example of the Bauxite Basin Niksic with five mines. After the assessment, LP is an efficient mathematical modeling tool in production planning and solving many other single-criteria optimization problems of mining engineering. After the comparison of advantages and deficiencies of both deterministic and fuzzy LP models, the conclusion presents benefits of the fuzzy LP model but is also stating that seeking the optimal plan of production means to accomplish the overall analysis that will encompass the LP model approaches.展开更多
During underground mining,accurate revelation on the deformation and failure mechanisms of a high-steep slope under multi-layer mining conditions facilitates the prevention and control of geological disasters in mines...During underground mining,accurate revelation on the deformation and failure mechanisms of a high-steep slope under multi-layer mining conditions facilitates the prevention and control of geological disasters in mines.Numerical simulation based on discrete element theory can be used to explore the characteristics and mechanism of action of deformation and failure of a slope under complex geological and multi-layer mining conditions.By utilising PFC2 D(particle flow code) software,the deformation and failure characteristics of a high-steep slope in Faer Coal Mine in Guizhou Province,China were investigated.Additionally,the mechanism of influence of different numbers of mining layers on the deformation and failure of the high and steep slope was elucidated.The result showed that after the goaf passed by the slope toe,multi-layer mining aggravated the subsidence and deformation of the slope toe:the slope toppled forward as it sank.The toppling of the slope changed the slope structures:the strata in the front of the slope were transformed from anti-dip to down-dip features.Extruded by collapsedtoppled rock mass,the slope toe and the rock mass located in the lower part of the slope toe generally exhibited a locking effect on the slope.Multi-layer mining degraded the overall stability of the slope,in that the total displacement of the slope was much greater than the total mining thickness of the coal seams.Based on the aforementioned research,ideas for preventing and controlling geological disasters during mining operations under a high-steep slope were proposed.展开更多
Because there is neither waste rock nor mill tailings in the gypsum mine, and the buildings on the goaf of gypsum mine are needed to be protected, the research proposed the scheme of the clay filling technology. Gypsu...Because there is neither waste rock nor mill tailings in the gypsum mine, and the buildings on the goaf of gypsum mine are needed to be protected, the research proposed the scheme of the clay filling technology. Gypsum, cement, lime and water glass were used as adhesive, and the strength of different material ratios were investigated in this study. The influence factors of clay strength were obtained in the order of cement, gypsum, water glass and lime. The results show that the cement content is the determinant influence factor, and gypsum has positive effects, while the water glass can enhance both clay strength and the fluidity of the filing slurry. Furthermore, combining chaotic optimization method with neural network, the optimal ratio of composite cementing agent was obtained. The results show that the optimal ratio of water glass, cement, lime and clay (in quality) is 1.17:6.74:4.17:87.92 in the process of bottom self-flow filling, while the optimal ratio is 1.78:9.58:4.71:83.93 for roof-contacted filling. A novel filling process to fill in gypsum mine goaf with clay is established. The engineering practice shows that the filling cost is low, thus, notable economic benefit is achieved.展开更多
In underground mining by sublevel caving method, the deformation and damage of the surface induced by subsidence are the major challenging issues. The dynamic and soft backflling body increases the safety risks in the...In underground mining by sublevel caving method, the deformation and damage of the surface induced by subsidence are the major challenging issues. The dynamic and soft backflling body increases the safety risks in the subsiding area. In this paper, taking Zhangfushan iron mine as an example, the ore body and the general layout are focused on the safety of backflling of mined-out area. Then, we use the ANSYS software to construct a three-dimensional(3D) model for the mining area in the Zhangfushan iron mine. According to the simulation results of the initial mining stages, the ore body is stoped step by step as suggested in the design. The stability of the backflling is back analyzed based on the monitored displacements, considering the stress distribution to optimize the stoping sequence. The simulations show that a reasonable stoping sequence can minimize the concentration of high compressive stress and ensure the safety of stoping of the ore body.展开更多
The coal resource has an important role in the energy development strategy in China. Because the coal resources are a kind of non-renewable resources, a Kind of ex-hausting resource, which is limited in quantity, and ...The coal resource has an important role in the energy development strategy in China. Because the coal resources are a kind of non-renewable resources, a Kind of ex-hausting resource, which is limited in quantity, and the exploitation of the recourses are not economized now, so how to realize the sustainable development for coal resource in China is very important. In this paper, two parts were researched to optimize the coal mining. In order to optimize the mining order of different mining areas, the fuzzy logic evaluation was used to build the evaluation system. The economic control theory model was built to realize the proper period to explore the coal recourses for the same mining areas.展开更多
High geostress will become a normality in the deep because in-situ stress rises linearly with depth.The geological structure grows immensely intricate as depth increases.Faults,small fractures,and joint fissures are w...High geostress will become a normality in the deep because in-situ stress rises linearly with depth.The geological structure grows immensely intricate as depth increases.Faults,small fractures,and joint fissures are widely developed.The objective of this paper is to identify geostress anomalies at a variety of locations near faults and to demonstrate their accumulation mechanism.Hydrofracturing tests were conducted in seven deep boreholes.We conducted a test at a drilling depth of over one thousand meters to reveal and quantify the influence of faults on in-situ stresses at the hanging wall,footwall,between faults,end of faults,junction of faults,and far-field of faults.The effect of fault sites and characteristics on the direction and magnitude of stresses has been investigated and compared to test boreholes.The accumulation heterogeneity of stresses near faults was illustrated by a three-dimensional numerical simulation,which is utilized to explain the effect of faults on the accumulation and differentiation of in-situ stress.Due to regional tectonics and faulting,the magnitude,direction,and stress regime are all extremely different.The concentration degree of geostress and direction change will vary with the location of faults near faults,but the magnitude and direction of in-situ stress conform to regional tectonic stress at a distance from the faults.The focal mechanism solution has been verified using historical seismic ground motion vectors.The results demonstrate that the degree of stress differentiation varies according to the fault attribute and its position.Changes in stress differentiation and its ratio from strong to weak occur between faults,intersection,footwall,end of faults,and hanging wall;along with the sequence of orientation is the footwall,between faults,the end of faults,intersection,and hanging wall.This work sheds new light on the fault-induced stress accumulation and orientation shift mechanisms across the entire cycle.展开更多
The circle geometric constraint model (CGCM) was put forward for resolving the open-pit mine ore-matching problems (OMOMP). By adopting the approaches of graph theory, block model of blasted piles was abstracted i...The circle geometric constraint model (CGCM) was put forward for resolving the open-pit mine ore-matching problems (OMOMP). By adopting the approaches of graph theory, block model of blasted piles was abstracted into a set of nodes and directed edges, which were connected together with other nodes in the range of circle constraints, to describe the mining sequence. Also, the constructing method of CGCM was introduced in detail. The algorithm of CGCM has been realized in the DIM1NE system, and applied to a short-term (5 d) program calculation for ore-matching of a cement limestone mine in Hebei Province, China. The applications show that CGCM can well describe the mining sequence of ore blocks and its mining geometric constraints in the process of mining blasted piles. This model, which is applicable for resolving OMOMP under complicated geometric constraints with accurate results, provides effective ways to solve the problems of open-pit ore-matching.展开更多
Cooling process of iron ore pellets in a circular cooler has great impacts on the pellet quality and systematic energy exploitation. However, multi-variables and non-visualization of this gray system is unfavorable to...Cooling process of iron ore pellets in a circular cooler has great impacts on the pellet quality and systematic energy exploitation. However, multi-variables and non-visualization of this gray system is unfavorable to efficient production. Thus, the cooling process of iron ore pellets was optimized using mathematical model and data mining techniques. A mathematical model was established and validated by steady-state production data, and the results show that the calculated values coincide very well with the measured values. Based on the proposed model, effects of important process parameters on gas-pellet temperature profiles within the circular cooler were analyzed to better understand the entire cooling process. Two data mining techniques—Association Rules Induction and Clustering were also applied on the steady-state production data to obtain expertise operating rules and optimized targets. Finally, an optimized control strategy for the circular cooler was proposed and an operation guidance system was developed. The system could realize the visualization of thermal process at steady state and provide operation guidance to optimize the circular cooler.展开更多
基金funding support provided by the Laurentian University Research Fund for the compilation of this report
文摘Near-surface deposits that extend to considerable depths are often amenable to both open pit mining and/or underground mining. This paper investigates the strategy of mining options for an orebody using a Mixed Integer Linear Programming(MILP) optimization framework. The MILP formulation maximizes the Net Present Value(NPV) of the reserve when extracted with(i) open pit mining,(ii) underground mining, and(iii) concurrent open pit and underground mining. Comparatively, implementing open pit mining generates a higher NPV than underground mining. However considering the investment required for these mining options, underground mining generates a better return on investment than open pit mining. Also, in the concurrent open pit and underground mining scenario, the optimizer prefers extracting blocks using open pit mining. Although the underground mine could access ore sooner, the mining cost differential for open pit mining is more than compensated for by the discounting benefits associated with earlier underground mining.
文摘Planning and production optimization within multiple mines or several work sites (entities) mining systems by using fuzzy linear programming (LP) was studied. LP is the most commonly used operations research methods in mining engineering. After the introductory review of properties and limitations of applying LP, short reviews of the general settings of deterministic and fuzzy LP models are presented. With the purpose of comparative analysis, the application of both LP models is presented using the example of the Bauxite Basin Niksic with five mines. After the assessment, LP is an efficient mathematical modeling tool in production planning and solving many other single-criteria optimization problems of mining engineering. After the comparison of advantages and deficiencies of both deterministic and fuzzy LP models, the conclusion presents benefits of the fuzzy LP model but is also stating that seeking the optimal plan of production means to accomplish the overall analysis that will encompass the LP model approaches.
基金funded by the National Natural Science Foundation of China (Grants No. 41877273)the Innovative Research Groups of the National Natural Science Foundation of China (Grants No. 41521002)+1 种基金the State Key Laboratory of Geohazard Disaster Prevention and Geoenvironment Protection (Chengdu University of Technology) (Grants No. SKLGP2017Z016)the Guizhou Provincial Geological Environment Monitoring Institute, and the Faer Coal Mine。
文摘During underground mining,accurate revelation on the deformation and failure mechanisms of a high-steep slope under multi-layer mining conditions facilitates the prevention and control of geological disasters in mines.Numerical simulation based on discrete element theory can be used to explore the characteristics and mechanism of action of deformation and failure of a slope under complex geological and multi-layer mining conditions.By utilising PFC2 D(particle flow code) software,the deformation and failure characteristics of a high-steep slope in Faer Coal Mine in Guizhou Province,China were investigated.Additionally,the mechanism of influence of different numbers of mining layers on the deformation and failure of the high and steep slope was elucidated.The result showed that after the goaf passed by the slope toe,multi-layer mining aggravated the subsidence and deformation of the slope toe:the slope toppled forward as it sank.The toppling of the slope changed the slope structures:the strata in the front of the slope were transformed from anti-dip to down-dip features.Extruded by collapsedtoppled rock mass,the slope toe and the rock mass located in the lower part of the slope toe generally exhibited a locking effect on the slope.Multi-layer mining degraded the overall stability of the slope,in that the total displacement of the slope was much greater than the total mining thickness of the coal seams.Based on the aforementioned research,ideas for preventing and controlling geological disasters during mining operations under a high-steep slope were proposed.
基金supported by the National Basic Research and Development Program of China (No. 2010CB732004)the joint funding of the National Natural Science Foundation and Shanghai Baosteel Group Corporation of China (No. 51074177)
文摘Because there is neither waste rock nor mill tailings in the gypsum mine, and the buildings on the goaf of gypsum mine are needed to be protected, the research proposed the scheme of the clay filling technology. Gypsum, cement, lime and water glass were used as adhesive, and the strength of different material ratios were investigated in this study. The influence factors of clay strength were obtained in the order of cement, gypsum, water glass and lime. The results show that the cement content is the determinant influence factor, and gypsum has positive effects, while the water glass can enhance both clay strength and the fluidity of the filing slurry. Furthermore, combining chaotic optimization method with neural network, the optimal ratio of composite cementing agent was obtained. The results show that the optimal ratio of water glass, cement, lime and clay (in quality) is 1.17:6.74:4.17:87.92 in the process of bottom self-flow filling, while the optimal ratio is 1.78:9.58:4.71:83.93 for roof-contacted filling. A novel filling process to fill in gypsum mine goaf with clay is established. The engineering practice shows that the filling cost is low, thus, notable economic benefit is achieved.
文摘In underground mining by sublevel caving method, the deformation and damage of the surface induced by subsidence are the major challenging issues. The dynamic and soft backflling body increases the safety risks in the subsiding area. In this paper, taking Zhangfushan iron mine as an example, the ore body and the general layout are focused on the safety of backflling of mined-out area. Then, we use the ANSYS software to construct a three-dimensional(3D) model for the mining area in the Zhangfushan iron mine. According to the simulation results of the initial mining stages, the ore body is stoped step by step as suggested in the design. The stability of the backflling is back analyzed based on the monitored displacements, considering the stress distribution to optimize the stoping sequence. The simulations show that a reasonable stoping sequence can minimize the concentration of high compressive stress and ensure the safety of stoping of the ore body.
基金Supported by Social Science Foundation of China (05CJL017)School Social Science Foundation of Jiangsu (05SJD630002)
文摘The coal resource has an important role in the energy development strategy in China. Because the coal resources are a kind of non-renewable resources, a Kind of ex-hausting resource, which is limited in quantity, and the exploitation of the recourses are not economized now, so how to realize the sustainable development for coal resource in China is very important. In this paper, two parts were researched to optimize the coal mining. In order to optimize the mining order of different mining areas, the fuzzy logic evaluation was used to build the evaluation system. The economic control theory model was built to realize the proper period to explore the coal recourses for the same mining areas.
基金financially supported by the National Natural Science Foundation of China(Nos.51574015 and 51934001)the National Key Science and Technology Programs,China(No.2018YFC0808004)。
文摘High geostress will become a normality in the deep because in-situ stress rises linearly with depth.The geological structure grows immensely intricate as depth increases.Faults,small fractures,and joint fissures are widely developed.The objective of this paper is to identify geostress anomalies at a variety of locations near faults and to demonstrate their accumulation mechanism.Hydrofracturing tests were conducted in seven deep boreholes.We conducted a test at a drilling depth of over one thousand meters to reveal and quantify the influence of faults on in-situ stresses at the hanging wall,footwall,between faults,end of faults,junction of faults,and far-field of faults.The effect of fault sites and characteristics on the direction and magnitude of stresses has been investigated and compared to test boreholes.The accumulation heterogeneity of stresses near faults was illustrated by a three-dimensional numerical simulation,which is utilized to explain the effect of faults on the accumulation and differentiation of in-situ stress.Due to regional tectonics and faulting,the magnitude,direction,and stress regime are all extremely different.The concentration degree of geostress and direction change will vary with the location of faults near faults,but the magnitude and direction of in-situ stress conform to regional tectonic stress at a distance from the faults.The focal mechanism solution has been verified using historical seismic ground motion vectors.The results demonstrate that the degree of stress differentiation varies according to the fault attribute and its position.Changes in stress differentiation and its ratio from strong to weak occur between faults,intersection,footwall,end of faults,and hanging wall;along with the sequence of orientation is the footwall,between faults,the end of faults,intersection,and hanging wall.This work sheds new light on the fault-induced stress accumulation and orientation shift mechanisms across the entire cycle.
基金Project(2011AA060407) supported by the National High Technology Research and Development Program of ChinaProject(51074073) supported by the National Natural Science Foundation of China
文摘The circle geometric constraint model (CGCM) was put forward for resolving the open-pit mine ore-matching problems (OMOMP). By adopting the approaches of graph theory, block model of blasted piles was abstracted into a set of nodes and directed edges, which were connected together with other nodes in the range of circle constraints, to describe the mining sequence. Also, the constructing method of CGCM was introduced in detail. The algorithm of CGCM has been realized in the DIM1NE system, and applied to a short-term (5 d) program calculation for ore-matching of a cement limestone mine in Hebei Province, China. The applications show that CGCM can well describe the mining sequence of ore blocks and its mining geometric constraints in the process of mining blasted piles. This model, which is applicable for resolving OMOMP under complicated geometric constraints with accurate results, provides effective ways to solve the problems of open-pit ore-matching.
基金Item Sponsored by National Natural Science Foundation of China(51174253)
文摘Cooling process of iron ore pellets in a circular cooler has great impacts on the pellet quality and systematic energy exploitation. However, multi-variables and non-visualization of this gray system is unfavorable to efficient production. Thus, the cooling process of iron ore pellets was optimized using mathematical model and data mining techniques. A mathematical model was established and validated by steady-state production data, and the results show that the calculated values coincide very well with the measured values. Based on the proposed model, effects of important process parameters on gas-pellet temperature profiles within the circular cooler were analyzed to better understand the entire cooling process. Two data mining techniques—Association Rules Induction and Clustering were also applied on the steady-state production data to obtain expertise operating rules and optimized targets. Finally, an optimized control strategy for the circular cooler was proposed and an operation guidance system was developed. The system could realize the visualization of thermal process at steady state and provide operation guidance to optimize the circular cooler.