期刊文献+
共找到1,339篇文章
< 1 2 67 >
每页显示 20 50 100
The Optimal Inventory Policy for Reusable Items with Random Planning Horizon Considering Present Value
1
作者 Shou-Mei Su Shy-Der Lin Li-Fen Chang 《Applied Mathematics》 2014年第2期292-299,共8页
We discuss five areas of inventory model, including reusable raw material, EPQ model, optimization, random planning horizon and present value. In the traditional EPQ model, the stock-holding cost of raw material was n... We discuss five areas of inventory model, including reusable raw material, EPQ model, optimization, random planning horizon and present value. In the traditional EPQ model, the stock-holding cost of raw material was not counted as a part of relevant cost. We explored the possibility of reducing a company’s impact on the environment and increasing their competitiveness by recycling their repair and waste disposal. The products are manufactured with reusable raw material. Our analysis takes into account the time value, and the present value method is applied to determine the optimal inventory policies for reusable items with random planning horizon. Results show how the heuristic approach can achieve global optimum. Numerical examples are given to validate the proposed system. 展开更多
关键词 REUSABLE EPQ Optimization RANDOM PLANNING HORIZON present value
下载PDF
Optimal Inventory Policy of Production Management: A Present Value Framework
2
作者 Li-Fen Chang Shou-Mei Su Shy-Der Lin 《Engineering(科研)》 2013年第6期556-560,共5页
The classical economic production quantity (EPQ) assumes that the replenishments are instantaneous. As a manager of a factory, there is a problem must be taken into consideration. If the establishment buys all of the ... The classical economic production quantity (EPQ) assumes that the replenishments are instantaneous. As a manager of a factory, there is a problem must be taken into consideration. If the establishment buys all of the raw materials at the beginning, the stock-holding cost for the raw materials should be counted into the relevant costs. So the main purpose of this paper will add the raw materials stock-holding cost to the EPQ model and take the time value of money into consideration. Therefore, we will calculate the present value and compare the difference between take and does not take the time value of money into consideration. From these procedures of calculating, we found some interesting results: 1) the present value of total stock-holding cost of raw materials plus products from the beginning to time t is the same as the stock-holding cost of classical economic order quantity (EOQ) model;2) the present value of total relevant cost is independent of the production rate (if the production rate is greater than the demand rate);3) the optimal cycle time of total relevant cost not taking the time value into consideration is the same the optimal cycle time of classical EOQ model;4) the purchasing cost per unit time is irrelevant to time. 展开更多
关键词 INVENTORY EPQ present value
下载PDF
On the Expected Present Value of Total Dividends in a Risk Model with Potentially Delayed Claims
3
作者 Xie Jie-hua Zou Wei Wang De-hui 《Communications in Mathematical Research》 CSCD 2013年第3期193-202,共10页
In this paper, we consider a risk model in which two types of individual claims, main claims and by-claims, are defined. Every by-claim is induced by the main claim randomly and may be delayed for one time period with... In this paper, we consider a risk model in which two types of individual claims, main claims and by-claims, are defined. Every by-claim is induced by the main claim randomly and may be delayed for one time period with a certain probability. The dividend policy that certain amount of dividends will be paid as long as the surplus is greater than a constant dividend barrier is also introduced into this delayed claims risk model. By means of the probability generating functions, formulae for the expected present value of total dividend payments prior to ruin are obtained for discrete-type individual claims. Explicit expressions for the corresponding results are derived for K n claim amount distributions. Numerical illustrations are also given. 展开更多
关键词 风险模型 索赔 延迟 概率生成函数 债权 离散型 表达式 显式
下载PDF
Dimension of Solar Panels Surface Based to the Net Present Value for the Albanian Conditions
4
作者 Mirel Mico Elona ciqolli 《Journal of Environmental Science and Engineering(A)》 2013年第7期464-467,共4页
关键词 太阳能电池板 阿尔巴尼亚 净现值 尺寸 板面 能量系统 开发利用 平板集热器
下载PDF
Are the Methods of the Net Present Value Rate and Net Annual Value Rate the Effective Scheme Comparison Methods
5
作者 Guojie Zhao Gang Lu 《Chinese Business Review》 2005年第8期78-81,共4页
下载PDF
Lithofacies modeling by multipoint statistics and economic evaluation by NPV volume for the early Cretaceous Wabiskaw Member in Athabasca oilsands area, Canada 被引量:1
6
作者 Kwang Hyun Kim Kyungbook Lee +2 位作者 Hyun Suk Lee Chul Woo Rhee Hyun Don Shin 《Geoscience Frontiers》 SCIE CAS CSCD 2018年第2期441-451,共11页
The static modeling and dynamic simulation are essential and critical processes in petroleum exploration and development. In this study, lithofacies models for Wabiskaw Member in Athabasca, Canada are generated by mul... The static modeling and dynamic simulation are essential and critical processes in petroleum exploration and development. In this study, lithofacies models for Wabiskaw Member in Athabasca, Canada are generated by multipoint statistics(MPS) and then compared with the models built by sequential indicator simulation(SIS). Three training images(Tls) are selected from modern depositional environments;the Orinoco River Delta estuary, Cobequid bay-Salmon River estuary, and Danube River delta environment. In order to validate lithofacies models, average and variance of similarity in lithofacies are calculated through random and zonal blind-well tests.In random six-blind-well test, similarity average of MPS models is higher than that of SIS model. The Salmon MPS model closely resembles facies pattern of Wabiskaw Member in subsurface. Zonal blind-well tests show that successful lithofacies modeling for transitional depositional setting requires additional or proper zonation information on horizontal variation, vertical proportion, and secondary data.As Wabiskaw Member is frontier oilsands lease, it is impossible to evaluate the economics from production data or dynamic simulation. In this study, a dynamic steam assisted gravity drainage(SAGD)performance indicator(SPIDER) on the basis of reservoir characteristics is calculated to build 3 D reservoir model for the evaluation of the SAGD feasibility in Wabiskaw Member. SPIDER depends on reservoir properties, economic limit of steam-oil ratio, and bitumen price. Reservoir properties like porosity,permeability, and water saturation are measured from 13 cores and calculated from 201 well-logs. Three dimensional volumes of reservoir properties are constructed mostly based on relationships among properties. Finally, net present value(NPV) volume can be built by equation relating NPV and SPIDER. The economic area exceeding criterion of US$ 10,000 is identified, and the ranges of reservoir properties are estimated. NPV-volume-generation workflow from reservoir parameter to static model provides costand time-effective method to evaluate the oilsands SAGD project. 展开更多
关键词 Oilsands Multipoint STATISTICS (MPS) Reservoir static modeling Economic evaluation Net present value (npv) SAGD and SPIDER
下载PDF
A New Approach for Measuring Shareholder Value Creation
7
作者 Eleftherios Aggelopoulos 《Journal of Modern Accounting and Auditing》 2016年第7期388-396,共9页
下载PDF
单木造材优化嵌入传统林分经营优化中的红松人工林精准经营模式
8
作者 徐颖 蒋博 +1 位作者 金星姬 Timo Pukkala 《东北林业大学学报》 CAS CSCD 北大核心 2024年第2期13-20,共8页
以黑龙江省红松(Pinus koraiensis Siebold et Zuccarini)人工林主要分布区域的标准幼龄林(初植密度2500、3300株/hm~2,地位指数12、14、16 m)为研究对象,利用韦布尔(Weibull)函数预测株数保存率为85%时不同立地指数的红松人工林在10 a... 以黑龙江省红松(Pinus koraiensis Siebold et Zuccarini)人工林主要分布区域的标准幼龄林(初植密度2500、3300株/hm~2,地位指数12、14、16 m)为研究对象,利用韦布尔(Weibull)函数预测株数保存率为85%时不同立地指数的红松人工林在10 a时的直径分布;依据红松人工林幼龄标准林分数据,利用人工红松单木-林分基础模型和球果模型构建的林分模拟器对标准林分进行生长模拟,在传统经营优化模式中嵌套单木造材优化,构建单木造材优化嵌入传统林分经营优化中的红松人工林精准经营模式(简称“精准林分经营优化模式”);以木材和球果总净现值最大为目标,对比精准林分经营优化模式、传统林分经营优化模式的差异,分析造材优化对林分经营优化结果、林分经营措施的影响。结果表明:在约束间伐强度和固定下层伐的条件时,与传统经营优化模式相比,精准林分经营优化模式使总经济效益提升6.5%~9.1%。立地条件越好,精准林分经营优化模式对木材净现值增长率、年均木材产量、主伐时林分平均胸径的增量影响越显著,而对年均球果产量、球果净现值增长率的增量影响较小。在同一立地条件时,与传统林分经营优化模式相比,精准林分经营优化模式提升木材净现值增长率对林分初植密度更敏感。 展开更多
关键词 红松 人工林 经营模式 造材优化 净现值
下载PDF
带有VaR方法的模糊NPV模型及其混合智能算法 被引量:2
9
作者 袁国强 刘晓俊 朱建林 《计算机工程与应用》 CSCD 北大核心 2015年第14期35-39,50,共6页
基于可信性理论建立一类带有模糊Va R方法的NPV模型,并设计含有逼近方法、神经网络和遗传算法的混合智能算法对提出的模型进行求解。给出一个数值例子表明模型和算法的有效性。通过改变目标函数和可信性约束中的可信性水平对最优解进行... 基于可信性理论建立一类带有模糊Va R方法的NPV模型,并设计含有逼近方法、神经网络和遗传算法的混合智能算法对提出的模型进行求解。给出一个数值例子表明模型和算法的有效性。通过改变目标函数和可信性约束中的可信性水平对最优解进行灵敏度分析。 展开更多
关键词 资金预算问题 净现值(npv)模型 模糊Va R方法 逼近方法 混合智能算法
下载PDF
Max-npv项目进度问题研究评述 被引量:23
10
作者 何正文 徐渝 朱少英 《管理工程学报》 CSSCI 2005年第4期60-63,共4页
首先介绍了不受资源约束Max-npv项目进度问题在模型和算法方面的研究进展;随后,根据资源约束类型的不同,对可更新、不可更新及双重资源约束Max-npv项目进度问题的研究成果,特别是优化算法和启发式算法的设计进行了概述;最后,对Max-npv... 首先介绍了不受资源约束Max-npv项目进度问题在模型和算法方面的研究进展;随后,根据资源约束类型的不同,对可更新、不可更新及双重资源约束Max-npv项目进度问题的研究成果,特别是优化算法和启发式算法的设计进行了概述;最后,对Max-npv项目进度问题的研究现状进行了总结并指出进一步的研究方向。 展开更多
关键词 净现金值 项目进度安排 模型 优化算法 启发式算法
下载PDF
基于熔盐储热的燃煤机组调峰可行性分析
11
作者 彭家辉 倪永中 +2 位作者 王元良 廖燕清 徐鸿 《热力发电》 CAS CSCD 北大核心 2024年第1期99-106,共8页
随着新能源发电装机量增加导致电网调峰压力增大,火电机组要承担更多调峰任务,但目前火电机组的灵活性和调峰能力都较差。针对某亚临界300 MW燃煤机组,进行熔盐储能改造,提出了6种储热策略和2种放热策略,分析了3种工况下储-放热过程对... 随着新能源发电装机量增加导致电网调峰压力增大,火电机组要承担更多调峰任务,但目前火电机组的灵活性和调峰能力都较差。针对某亚临界300 MW燃煤机组,进行熔盐储能改造,提出了6种储热策略和2种放热策略,分析了3种工况下储-放热过程对机组调峰能力及热力性能的影响,并用净现值法进行了技术经济分析。结果表明:抽再热蒸汽储热可行性高,调峰深度能到58.9%,但会增加煤耗;放热时,加热给水产生蒸汽做功的发电增量最大,能到额定发电量的11.3%,但对熔盐的温度水平要求高;高温熔盐代替低压加热器预热给水可行性高,但发电增量低;储-放热全过程中,循环电效率最高可达0.987;进行了储热改造经济性分析,计算得动态投资回收期为11.65年,净现值为4911.8万元,改造方案可行。 展开更多
关键词 熔盐储热 调峰能力 热力性能 净现值
下载PDF
项目经济评价中NPV和IRR的风险传递关系研究 被引量:4
12
作者 李存斌 王建军 李莉 《技术经济》 2008年第8期57-60,共4页
在项目的经济评价中,净现值(NPV)和内部收益率(IRR)是主要的两个指标,当用概率形式表示项目经济受到的风险时,如何给出NPV和IRR两者之间的风险传递关系是一个难题。本文通过研究NPV和折现率之间的函数单调性关系,得出NPV和IRR之间的风... 在项目的经济评价中,净现值(NPV)和内部收益率(IRR)是主要的两个指标,当用概率形式表示项目经济受到的风险时,如何给出NPV和IRR两者之间的风险传递关系是一个难题。本文通过研究NPV和折现率之间的函数单调性关系,得出NPV和IRR之间的风险概率传递解析关系,由此可以根据NPV的概率得到相应的IRR概率分布曲线。该方法能够提供更为全面的且更符合客观实际情况的经济评价决策信息,使项目经济评价更具科学性。 展开更多
关键词 项目管理 净现值 内部收益率 风险传递
下载PDF
工程项目后评价中NPV和IRR影响因素识别 被引量:2
13
作者 项勇 陶学明 李颖 《西安科技大学学报》 CAS 北大核心 2007年第2期196-199,共4页
目前对工程项目后评价主要是依据项目完后的实际数据得出相应的指标,并与项目前期评估指标进行对比分析。文中通过相应的数学模型,对项目后评价NPV和IRR进行计算,分析项目后评价中各因素对该类指标的影响程度,为项目后评价指标体系设置... 目前对工程项目后评价主要是依据项目完后的实际数据得出相应的指标,并与项目前期评估指标进行对比分析。文中通过相应的数学模型,对项目后评价NPV和IRR进行计算,分析项目后评价中各因素对该类指标的影响程度,为项目后评价指标体系设置和指标影响因素分析提供理论依据。 展开更多
关键词 项目后评价 净现值 内部收益率
下载PDF
广义优先关系约束下Max-npv项目调度问题及其遗传算法 被引量:2
14
作者 刘洋 陈志 白思俊 《运筹与管理》 CSSCI CSCD 北大核心 2016年第6期91-98,127,共9页
以往Max-npv项目调度问题的研究都假定活动之间的关系为单一结束-开始类型,现实中活动之间关系复杂多变,因此,将广义优先关系引入Max-npv项目调度问题中,构建了广义优先关系约束下的Max-npv项目调度模型。针对该优化模型设计了一种双层... 以往Max-npv项目调度问题的研究都假定活动之间的关系为单一结束-开始类型,现实中活动之间关系复杂多变,因此,将广义优先关系引入Max-npv项目调度问题中,构建了广义优先关系约束下的Max-npv项目调度模型。针对该优化模型设计了一种双层遗传算法,外层遗传算法负责任务执行模式的优化,内层遗传算法负责任务调度的优化。在内层遗传算法中,采用任务开始时间之差作为新的编码方式,大大简化了交叉变异算子,针对网络图中的环状结构设计了修复算子,确保了编码的有效性。通过一个算例对算法进行了测试,实验结果验证了算法的有效性。 展开更多
关键词 项目调度 净现金值 广义优先关系 遗传算法
下载PDF
“对NPV与IRR指标的重新认识”的再认识 被引量:3
15
作者 赵国杰 刘明 《中国地质大学学报(社会科学版)》 2003年第5期14-16,共3页
对NPV与IRR指标的认识存在原则性的分歧。本文对杨廷干博士在其博士论文和专著中关于二者之"重新认识"存在的诸多问题进行了深入分析与批评,提出新的观点和再认识。
关键词 净现值 内部收益率 再认识
下载PDF
基于银行承兑汇票的Max-NPV项目调度研究 被引量:1
16
作者 韩丹丹 袁媛 《西安工业大学学报》 CAS 2014年第9期755-759,共5页
为了达到企业经济效益最大化的目标,在不考虑银行承兑汇票具有拆分业务的假设前提下,结合银行承兑汇票的贴现业务特征,建立以净现值最大为目标的项目调度模型并运用遗传算法对模型进行求解.结合西安市某施工单位的某个项目进行项目调度... 为了达到企业经济效益最大化的目标,在不考虑银行承兑汇票具有拆分业务的假设前提下,结合银行承兑汇票的贴现业务特征,建立以净现值最大为目标的项目调度模型并运用遗传算法对模型进行求解.结合西安市某施工单位的某个项目进行项目调度的实例分析,验证了模型的有效性. 展开更多
关键词 银行承兑汇票 净现值 M ax-N PV项目调度 遗传算法
下载PDF
投资评价动态决策的NPV法与IRR法比较分析 被引量:15
17
作者 张静 《中国矿业大学学报》 EI CAS CSCD 北大核心 2001年第5期492-495,共4页
在分析内部收益率和净现值关系的基础上 ,对投资评价中项目或方案的决策问题进行了探讨 ,重点就独立项目、无约束条件互斥项目和有约束条件互斥项目 3种情况下两种方法的选择问题进行了理论和实践的论述 ,并分析了两种方法发生冲突的原... 在分析内部收益率和净现值关系的基础上 ,对投资评价中项目或方案的决策问题进行了探讨 ,重点就独立项目、无约束条件互斥项目和有约束条件互斥项目 3种情况下两种方法的选择问题进行了理论和实践的论述 ,并分析了两种方法发生冲突的原因及协调方法 .结果表明 :如果以内部收益率最大为最优方案的判别标准 ,将导致错误决策 .因此 ,当两种方法发生冲突时 。 展开更多
关键词 投资评价 决策 净现金流量 风险收益率 净现值
下载PDF
工程项目后评价中NPV和IRR影响因素识别方法 被引量:1
18
作者 项勇 陶学明 李颖 《四川建筑科学研究》 北大核心 2007年第3期224-226,共3页
目前对工程项目后评价主要是依据项目完后的实际数据得出相应的指标,并与项目前期评估指标进行对比分析。文章通过相应的数学模型,对项目后评价NPV和IRR进行计算,分析项目后评价中各因素对该类指标的影响程度,为项目后评价指标体系设置... 目前对工程项目后评价主要是依据项目完后的实际数据得出相应的指标,并与项目前期评估指标进行对比分析。文章通过相应的数学模型,对项目后评价NPV和IRR进行计算,分析项目后评价中各因素对该类指标的影响程度,为项目后评价指标体系设置和指标影响因素分析提供理论依据。 展开更多
关键词 项目后评价 净现值 内部收益率
下载PDF
投资项目评价中NPV与IRR的比较分析 被引量:2
19
作者 迟宁 邓学芬 《西华大学学报(哲学社会科学版)》 2009年第2期114-116,共3页
NPV和IRR是投资项目评价中最常用的两个决策指标,这两个指标对独立方案的投资决策的评价结果是一致的,但在互斥方案的评价中,由于初始投资额不同或现金流量分布差异较大等原因,两者往往会产生差异。本文通过对两个指标的比较分析,为投... NPV和IRR是投资项目评价中最常用的两个决策指标,这两个指标对独立方案的投资决策的评价结果是一致的,但在互斥方案的评价中,由于初始投资额不同或现金流量分布差异较大等原因,两者往往会产生差异。本文通过对两个指标的比较分析,为投资者正确选择运用指标提供了建议。 展开更多
关键词 净现值 内部收益率 互斥方案选择
下载PDF
NPV法在露天矿山生产规模确定中的应用 被引量:1
20
作者 周紫辉 永学艳 +1 位作者 陈振超 任建平 《现代矿业》 CAS 2018年第4期5-10,共6页
为合理确定露天矿山生产规模,立足行业相关研究现状,结合矿山以往实践经验,从矿业经济学角度出发,根据矿山内外部因素,采用NPV法确定矿山生产规模,并分析其经济性和合理性,通过矿山实例验证应用过程。结果表明,产品价格是影响生产规模... 为合理确定露天矿山生产规模,立足行业相关研究现状,结合矿山以往实践经验,从矿业经济学角度出发,根据矿山内外部因素,采用NPV法确定矿山生产规模,并分析其经济性和合理性,通过矿山实例验证应用过程。结果表明,产品价格是影响生产规模最重要的因素,同一矿床的某一规模的产品价格处于一定范围内才能盈利;同一矿床的建设规模与产品价格成正比关系,建设规模越大,价格的敏感度越高。企业在选择矿山生产规模时应合理地选择产品价格区间,并对外部因素如不同规模对应的工程投资等有相对准确的把握。利用NPV法确定经济合理的生产规模,具有很好的科学指导性。 展开更多
关键词 净现值 产品价格 生产规模
下载PDF
上一页 1 2 67 下一页 到第
使用帮助 返回顶部