This paper studies the excavation collapse at the Xianghu subway station on Hangzhou metro line 1.The objective is to present an overview of this case study and discuss the cause of the failure.Through field investiga...This paper studies the excavation collapse at the Xianghu subway station on Hangzhou metro line 1.The objective is to present an overview of this case study and discuss the cause of the failure.Through field investigation and preliminary analysis,the reasons for the excavation collapse were the misuse of the soil parameters,over excavation,incorrect installation of steel struts,invalid monitoring data,and inadequate ground improvement.Finally,a small strain constitutive model was used for further analysis.In order to estimate damage efficiently,the orthogonal array(OA) was introduced for screening the key factor in the numerical experiments.Six estimated indexes including deformations and internal forces of the excavation were taken,and the effectiveness of four factors which may cause the collapse was evaluated.Through numerical experiments and interaction analysis,it is found that the deformation and internal force can be well controlled by jet grouting of the subsoil under the final cutting surface,but increasing the improvement ratio of the jet grouting cannot help optimize the excavation behavior efficiently,and without jet grouting and the fourth level struts,the deformation and internal force of the excavation in this case will far surpass the allowable value.展开更多
To optimize cutting control parameters and provide scientific evidence for controlling cutting forces,cutting force modeling and cutting control parameter optimization are researched with one tool adopted to orbital d...To optimize cutting control parameters and provide scientific evidence for controlling cutting forces,cutting force modeling and cutting control parameter optimization are researched with one tool adopted to orbital drill holes in aluminum alloy 6061.Firstly,four cutting control parameters(tool rotation speed,tool revolution speed,axial feeding pitch and tool revolution radius)and affecting cutting forces are identified after orbital drilling kinematics analysis.Secondly,hybrid level orthogonal experiment method is utilized in modeling experiment.By nonlinear regression analysis,two quadratic prediction models for axial and radial forces are established,where the above four control parameters are used as input variables.Then,model accuracy and cutting control parameters are analyzed.Upon axial and radial forces models,two optimal combinations of cutting control parameters are obtained for processing a13mm hole,corresponding to the minimum axial force and the radial force respectively.Finally,each optimal combination is applied in verification experiment.The verification experiment results of cutting force are in good agreement with prediction model,which confirms accracy of the research method in practical production.展开更多
基金Project (No. 51078377) supported by the National Natural Science Foundation of China
文摘This paper studies the excavation collapse at the Xianghu subway station on Hangzhou metro line 1.The objective is to present an overview of this case study and discuss the cause of the failure.Through field investigation and preliminary analysis,the reasons for the excavation collapse were the misuse of the soil parameters,over excavation,incorrect installation of steel struts,invalid monitoring data,and inadequate ground improvement.Finally,a small strain constitutive model was used for further analysis.In order to estimate damage efficiently,the orthogonal array(OA) was introduced for screening the key factor in the numerical experiments.Six estimated indexes including deformations and internal forces of the excavation were taken,and the effectiveness of four factors which may cause the collapse was evaluated.Through numerical experiments and interaction analysis,it is found that the deformation and internal force can be well controlled by jet grouting of the subsoil under the final cutting surface,but increasing the improvement ratio of the jet grouting cannot help optimize the excavation behavior efficiently,and without jet grouting and the fourth level struts,the deformation and internal force of the excavation in this case will far surpass the allowable value.
基金Supported by the National Natural Science Foundation of China(50975141)the Aviation Science Fund(20091652018,2010352005)the National Science and Technology Major Project of the Ministry of Science and Technology of China(2012ZX04003031-4)
文摘To optimize cutting control parameters and provide scientific evidence for controlling cutting forces,cutting force modeling and cutting control parameter optimization are researched with one tool adopted to orbital drill holes in aluminum alloy 6061.Firstly,four cutting control parameters(tool rotation speed,tool revolution speed,axial feeding pitch and tool revolution radius)and affecting cutting forces are identified after orbital drilling kinematics analysis.Secondly,hybrid level orthogonal experiment method is utilized in modeling experiment.By nonlinear regression analysis,two quadratic prediction models for axial and radial forces are established,where the above four control parameters are used as input variables.Then,model accuracy and cutting control parameters are analyzed.Upon axial and radial forces models,two optimal combinations of cutting control parameters are obtained for processing a13mm hole,corresponding to the minimum axial force and the radial force respectively.Finally,each optimal combination is applied in verification experiment.The verification experiment results of cutting force are in good agreement with prediction model,which confirms accracy of the research method in practical production.