In this paper,the seismic behaviors of precast bridge columns connected with grouted corrugated-metal duct(GCMD)were investigated through the biaxial quasi-static experiment and numerical simulation.With a geometric s...In this paper,the seismic behaviors of precast bridge columns connected with grouted corrugated-metal duct(GCMD)were investigated through the biaxial quasi-static experiment and numerical simulation.With a geometric scale ratio of 1:5,five specimens were fabricated,including four precast bridge columns connected with GCMD and one cast-in-place(CIP)bridge column.A finite element analysis model was also established by using OpenSees and was then calibrated by using the experimental results for parameter analysis.The results show the biaxial seismic performance of the precast bridge columns connected with GCMD was similar to the CIP bridge columns regarding ultimate bearing capacity and hysteresis energy,and further,that it could meet the design goal of equivalent performance.The seismic performance of the precast bridge columns connected with GCMD deteriorated more significantly under bi-directional load than under uni-directional load.A proper slenderness ratio(e.g.,7.0-10.0)and longitudinal reinforcement ratio could significantly improve the energy dissipation capacity and deformation capacity of the precast bridge columns,while the axial load ratio and concrete strength had little influence on the above properties.The research results could bring insights to the development of the seismic design of precast bridge columns connected with GCMD.展开更多
In recent years, precast segmental concrete bridge columns became prevalent because of the benefits of accelerated construction, low environmental impact, high quality and low life cycle costs. The lack of a detailed ...In recent years, precast segmental concrete bridge columns became prevalent because of the benefits of accelerated construction, low environmental impact, high quality and low life cycle costs. The lack of a detailed configuration and appropriate design procedure to ensure a comparable performance with monolithic construction has impeded this structural system from being widely used in areas of high seismicity. In this study, precast segmental bridge column cyclic loading tests were conducted to investigate the performance of unbonded post-tensioned segmental bridge columns. One monolithic and two precast segmental columns were tested. The preeast segmental column exhibited minor damage and small residual displacement after the maximum 7% cyclic drift; energy dissipation (ED) can be enhanced byadding ED bars. The experimental results were modeled by a simplified pushover method (SPOM), as well as a fiber model (FIBM) finite element method. Forty-five cases of columns with different aspect ratios, axial load ratios and ED bar ratios were analyzed with the SPOM and FIBM, respectively. Using these parametric results, a simplified design method was suggested by regressive analysis. Satisfactory correlation was found between the experimental results and the simplified design method for preeast segmental columns with different design parameters.展开更多
An experimental investigation was conducted to study the performance of precast beam-column concrete connections using T-section steel inserts into the concrete beam and joint core,under reversed cyclic loading.Six 2/...An experimental investigation was conducted to study the performance of precast beam-column concrete connections using T-section steel inserts into the concrete beam and joint core,under reversed cyclic loading.Six 2/3-scale interior beam-column subassemblies,one monolithic concrete specimen and five precast concrete specimens were tested.One precast specimen was a simple connection for a gravity load resistant design.Other precast specimens were developed with different attributes to improve their seismic performance.The test results showed that the performance of the monolithic specimen M1 represented ductile seismic behavior.Failure of columns and joints could be prevented,and the failure of the frame occurred at the flexural plastic hinge formation at the beam ends,close to the column faces.For the precast specimens,the splitting crack along the longitudinal lapped splice was a major failure.The precast P5 specimen with double steel T-section inserts showed better seismic performance compared to the other precast models.However,the dowel bars connected to the steel inserts were too short to develop a bond.The design of the precast concrete beams with lap splice is needed for longer lap lengths and should be done at the beam mid span or at the low flexural stress region.展开更多
Precast segmental column bridges exhibit various construction advantages in comparison to traditional monolithic column bridges.However,the lack of cognitions on seismic behaviors has seriously restricted their applic...Precast segmental column bridges exhibit various construction advantages in comparison to traditional monolithic column bridges.However,the lack of cognitions on seismic behaviors has seriously restricted their applications and developments.In this paper,comprehensive investigations are conducted to analyze the dynamic characteristics of precast segmental column bridges under near-fault,forward-directivity ground motions.First,the finite-element models of two comparable bridges with precast segmental columns and monolithic columns are constructed by using OpenSees software,and the nonlinearities of the bridges are considered.Next,three different earthquake loadings are meticulously set up to handle engineering problems,namely recorded near-and far-field ground motions,parameterized pulses,and pulse and residual components extracted from real records.Finally,based on the models and earthquake sets,extensive explorations are carried out.The results show that near-fault forward-directivity ground motions are more threatening than far-field ones;precast segmental column bridges may suffer more pounding impacts than monolithic bridges;the“narrow band”effect caused by near-fault,forward-directivity ground motions may occur in bridges with shorter periods than pulse periods;and pulse and residual components play different roles in seismic responses.展开更多
A beam-column joint of precast and partial steel reinforced concrete( PPSRC) is proposed for precast reinforced concrete frames. The PPSRC consists of partial steel and reinforced concrete. The partial steel is locate...A beam-column joint of precast and partial steel reinforced concrete( PPSRC) is proposed for precast reinforced concrete frames. The PPSRC consists of partial steel and reinforced concrete. The partial steel is located in the core joint region and the connections between concrete members. This paper presents an experimental study of a series of PPSRC specimens. These specimens are tested under low cyclic loading.Experimental results demonstrate that the bearing capacity of the PPSRC specimens is 3 times that of the ordinary reinforced concrete( RC) beam-column joints. The strength and stiffness degradation rates are slower compared with that of the RC beam-column joints. In addition,the strength of the core joint region and the connections is higher than other parts of the PPSRC specimens. Beam failure occurs firstly for the PPSRC specimens,followed by column failure and connections failure. The failure of the core joint region occurs finally.Test results show that the seismic performance of the PPSRC is better than that of the ordinary RC beam-column joints.展开更多
基金Supported by the National Natural Science Foundation (51208268)the Pubiic-Welfare-Technology Research Industry Project of Science Technology Department of Zhejiang (2011 C21078) the Social Development Project of Science Technology Bureau of Ningbo (2011CS0017).
基金National Natural Science Foundation of China under Grant No.51408360the Natural Science Foundation of Fujian(NSFF)under Grant No.2020J01477the Technology Project of Fuzhou Science and Technology Bureau(TPFB)under Grant No.2020-GX-18。
文摘In this paper,the seismic behaviors of precast bridge columns connected with grouted corrugated-metal duct(GCMD)were investigated through the biaxial quasi-static experiment and numerical simulation.With a geometric scale ratio of 1:5,five specimens were fabricated,including four precast bridge columns connected with GCMD and one cast-in-place(CIP)bridge column.A finite element analysis model was also established by using OpenSees and was then calibrated by using the experimental results for parameter analysis.The results show the biaxial seismic performance of the precast bridge columns connected with GCMD was similar to the CIP bridge columns regarding ultimate bearing capacity and hysteresis energy,and further,that it could meet the design goal of equivalent performance.The seismic performance of the precast bridge columns connected with GCMD deteriorated more significantly under bi-directional load than under uni-directional load.A proper slenderness ratio(e.g.,7.0-10.0)and longitudinal reinforcement ratio could significantly improve the energy dissipation capacity and deformation capacity of the precast bridge columns,while the axial load ratio and concrete strength had little influence on the above properties.The research results could bring insights to the development of the seismic design of precast bridge columns connected with GCMD.
基金National Natural Science Foundation of China under Grants Nos.51208268 and 51178429K.C.Wong Magna Fund in Ningbo University+1 种基金Transportation Science and Technology Project of Ningbo City under Grant No.201507Natural Science Foundation of Ningbo City under Grant No.2015A610293
文摘In recent years, precast segmental concrete bridge columns became prevalent because of the benefits of accelerated construction, low environmental impact, high quality and low life cycle costs. The lack of a detailed configuration and appropriate design procedure to ensure a comparable performance with monolithic construction has impeded this structural system from being widely used in areas of high seismicity. In this study, precast segmental bridge column cyclic loading tests were conducted to investigate the performance of unbonded post-tensioned segmental bridge columns. One monolithic and two precast segmental columns were tested. The preeast segmental column exhibited minor damage and small residual displacement after the maximum 7% cyclic drift; energy dissipation (ED) can be enhanced byadding ED bars. The experimental results were modeled by a simplified pushover method (SPOM), as well as a fiber model (FIBM) finite element method. Forty-five cases of columns with different aspect ratios, axial load ratios and ED bar ratios were analyzed with the SPOM and FIBM, respectively. Using these parametric results, a simplified design method was suggested by regressive analysis. Satisfactory correlation was found between the experimental results and the simplified design method for preeast segmental columns with different design parameters.
文摘An experimental investigation was conducted to study the performance of precast beam-column concrete connections using T-section steel inserts into the concrete beam and joint core,under reversed cyclic loading.Six 2/3-scale interior beam-column subassemblies,one monolithic concrete specimen and five precast concrete specimens were tested.One precast specimen was a simple connection for a gravity load resistant design.Other precast specimens were developed with different attributes to improve their seismic performance.The test results showed that the performance of the monolithic specimen M1 represented ductile seismic behavior.Failure of columns and joints could be prevented,and the failure of the frame occurred at the flexural plastic hinge formation at the beam ends,close to the column faces.For the precast specimens,the splitting crack along the longitudinal lapped splice was a major failure.The precast P5 specimen with double steel T-section inserts showed better seismic performance compared to the other precast models.However,the dowel bars connected to the steel inserts were too short to develop a bond.The design of the precast concrete beams with lap splice is needed for longer lap lengths and should be done at the beam mid span or at the low flexural stress region.
基金National Natural Science Foundation of China under Grant Nos.U1434205 and 51678490the Major Research Plan of China National Railway Ministry of China under Grant Nos.2015G002-B and P2018G007the National Key R&D Program of China under Grant No.2017YFC1500803。
文摘Precast segmental column bridges exhibit various construction advantages in comparison to traditional monolithic column bridges.However,the lack of cognitions on seismic behaviors has seriously restricted their applications and developments.In this paper,comprehensive investigations are conducted to analyze the dynamic characteristics of precast segmental column bridges under near-fault,forward-directivity ground motions.First,the finite-element models of two comparable bridges with precast segmental columns and monolithic columns are constructed by using OpenSees software,and the nonlinearities of the bridges are considered.Next,three different earthquake loadings are meticulously set up to handle engineering problems,namely recorded near-and far-field ground motions,parameterized pulses,and pulse and residual components extracted from real records.Finally,based on the models and earthquake sets,extensive explorations are carried out.The results show that near-fault forward-directivity ground motions are more threatening than far-field ones;precast segmental column bridges may suffer more pounding impacts than monolithic bridges;the“narrow band”effect caused by near-fault,forward-directivity ground motions may occur in bridges with shorter periods than pulse periods;and pulse and residual components play different roles in seismic responses.
文摘A beam-column joint of precast and partial steel reinforced concrete( PPSRC) is proposed for precast reinforced concrete frames. The PPSRC consists of partial steel and reinforced concrete. The partial steel is located in the core joint region and the connections between concrete members. This paper presents an experimental study of a series of PPSRC specimens. These specimens are tested under low cyclic loading.Experimental results demonstrate that the bearing capacity of the PPSRC specimens is 3 times that of the ordinary reinforced concrete( RC) beam-column joints. The strength and stiffness degradation rates are slower compared with that of the RC beam-column joints. In addition,the strength of the core joint region and the connections is higher than other parts of the PPSRC specimens. Beam failure occurs firstly for the PPSRC specimens,followed by column failure and connections failure. The failure of the core joint region occurs finally.Test results show that the seismic performance of the PPSRC is better than that of the ordinary RC beam-column joints.