The Fourth Industrial Revolution (4IR) is transforming the way we live, learn, work, and relate to one another. However, there is still an awareness inadequacy of the 4IR among project managers and the society in Tanz...The Fourth Industrial Revolution (4IR) is transforming the way we live, learn, work, and relate to one another. However, there is still an awareness inadequacy of the 4IR among project managers and the society in Tanzania, thus low readiness to conceptualize, implement and manage 4IR-related projects in the country. This study aimed to assess the 4IR readiness of project managers in Tanzania. The assessment is made in the frame of 4 readiness dimensions: strategy and governance structure, technology awareness, human capital digital skills development, and social-economic impact. The research used a quantitative method with the diffusion of innovations theory perspective, and data were collected mainly through an online survey questionnaire. The survey aimed at answering the research question concerning the project managers’ readiness for the 4IR. The 50 valid samples were completed by project managers from various industries such as agriculture, finance, consulting, construction, education and training, government, healthcare, Information Technology, and manufacturing. Data were analysed using SPSS. The results revealed that despite the generally low awareness of 4IR, several project managers in Tanzania have some varying awareness of 4IR technologies such as artificial intelligence, Internet of Things (IoT), data analytics, blockchain, robotics, cryptocurrency, chatbots, drones, and other digital transformation platforms. The results also indicated that project managers in Tanzania had little extent in readiness to initiate, develop and implement 4IR products and services due to inadequate 4IR-related awareness, strategy and governance structure, human capital digital skills development, and social economic impact. Consequently, some recommendations are made in the frame of the four assessed readiness dimensions for improvement. The value of this research is mainly to provide the state of 4IR readiness of project managers and associated recommendations to policymakers, practitioners, academia, donors, business industry and youth in digital innovation. The study also contributes to the body of knowledge on 4IR, project management and digital transformation.展开更多
Project management grows with and boosts China’s economic development Project management certification is a relatively new trend in China, but already professional training courses
The main purpose of this literature review is to understand the effectiveness and impacts of Robotics Process Automation (RPA) on the practices of Project Management (PM). For attaining the purposes of the research st...The main purpose of this literature review is to understand the effectiveness and impacts of Robotics Process Automation (RPA) on the practices of Project Management (PM). For attaining the purposes of the research study, an extensive literature review was conducted, which helped in gaining a theoretical understanding. These findings were then justified with the help of current and relevant secondary sources in the analysis section. The findings suggested that RPA is quite advantageous for implementing in varied aspects of a business, especially in the field of project management. However, it can pose several challenges, which need to be taken into due consideration by the organizations during execution such as the capabilities of the employees and the abilities of the existing systems to incorporate automation, among others. It was ultimately concluded that RPA is highly advantageous for project management teams but its effective implementation is the key to success.展开更多
The idea of linear Diophantine fuzzy set(LDFS)theory with its control parameters is a strong model for machine learning and optimization under uncertainty.The activity times in the critical path method(CPM)representat...The idea of linear Diophantine fuzzy set(LDFS)theory with its control parameters is a strong model for machine learning and optimization under uncertainty.The activity times in the critical path method(CPM)representation procedures approach are initially static,but in the Project Evaluation and Review Technique(PERT)approach,they are probabilistic.This study proposes a novel way of project review and assessment methodology for a project network in a linear Diophantine fuzzy(LDF)environment.The LDF expected task time,LDF variance,LDF critical path,and LDF total expected time for determining the project network are all computed using LDF numbers as the time of each activity in the project network.The primary premise of the LDF-PERT approach is to address ambiguities in project network activity timesmore simply than other approaches such as conventional PERT,Fuzzy PERT,and so on.The LDF-PERT is an efficient approach to analyzing symmetries in fuzzy control systems to seek an optimal decision.We also present a new approach for locating LDF-CPM in a project network with uncertain and erroneous activity timings.When the available resources and activity times are imprecise and unpredictable,this strategy can help decision-makers make better judgments in a project.A comparison analysis of the proposed technique with the existing techniques has also been discussed.The suggested techniques are demonstrated with two suitable numerical examples.展开更多
With the continuous implementation of the PPP projects,due to the imperfection of relevant policies,the blindness of government subsidy is constantly emerging.Thus,it is important to put forward a practical approach f...With the continuous implementation of the PPP projects,due to the imperfection of relevant policies,the blindness of government subsidy is constantly emerging.Thus,it is important to put forward a practical approach for valuing the subsidies and risk.In this paper,the revenue subsidies model and traffic subsidies model are established.Then combined with practical cases,Monte Carlo simulation is used to get the value and probability of government subsidies under different compensation ways.On this basis,the influence of initial traffic volume and traffic growth rate on government subsidies and net present value of investors is analyzed.The research findings can provide theoretical guidance for the government to choose a reasonable way of subsidies,balance the risk of compensation,and formulate subsidies policies.展开更多
Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its gre...Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its great contributions to the national gross domestic product (GDP) of the country. Concerning construction processes, both risk management (RM) and value engineering (VE) techniques have commonalities from the beginning up to the completion of the project due to enhancing the project value/quality, meeting the project deadline, and reducing overall project cost. VE includes resolving the uncertainty of project objectives and ensuring that the project is delivered in a value for money way. The key point of RM is to solve the uncertainty of the project itself and its results to ensure that the specifications are achieved within the prescribed time, cost, and quality constraints. This review work is comparatively and collectively focus</span><span style="font-family:Verdana;">ed</span><span style="font-family:Verdana;"> on assessing the role of RM and VE tools for project successful delivery. It studies the points of difference and common features of the two aspects in terms of construction project delivery. So, this study concluded that in construction RM tool cannot be the chief aim of the all parties involved in the project execution because sometimes it produces itself negative results and reduces project management success. Therefore, RM needs a strong combination with VE due to the dependence of the target in identifying and assessing risks by considering the highest performance and lowest cost. The integration of RM and VE combination in a single study would avoid duplication of work and deliver better value for money thereby leading to better project outcomes.展开更多
Hospital projects worldwide often experience misperformance,showing a tendency to exceed their estimated cost,miss their deadline,suffer quality problems,and yield benefit shortfalls.Considering this ubiquitous proble...Hospital projects worldwide often experience misperformance,showing a tendency to exceed their estimated cost,miss their deadline,suffer quality problems,and yield benefit shortfalls.Considering this ubiquitous problem,this paper aims to make sense of this phenomenon by addressing the following research question:How can we make sense of hospital project misperformance,and what can be done to mitigate its occurrence?We use an illustrative case study approach and the analytical lens of sense-making to examine the misperformance of three mega-hospital projects.Our research reveals issues such as scope changes,an inability to adapt and respond to risk and uncertainty,ineffectual project management and governance,and optimism bias,which combine to impact project performance adversely.We suggest that the two prominent theoretical perspectives dominating the literature in this field fall short of adequately explaining hospital project misperformance.We provide suggestions for improving the procurement process of hospitals and submit there is a need to develop a robust and balanced theory of project misperformance.展开更多
The Duifene teaching platform is a product of various teaching methods,which greatly improves the traditional teaching method.This article introduces the function and characteristics of a blended teaching platform as ...The Duifene teaching platform is a product of various teaching methods,which greatly improves the traditional teaching method.This article introduces the function and characteristics of a blended teaching platform as well as its application for histology and embryology modules.In addition,the advantages and disadvantages of blended teaching method is also discussed.The application of this teaching platform for Construction Project Management modules encourages students to be more enthusiastic and interested toward learning.This allows a more convenient and rapid teacher-student and student-student interaction thereby improving the teaching and learning experiences.展开更多
This paper presents a Game-theoretic optimization via Parallel Min-Max Ant System(PMMAS)algorithm is used in practice to determine the Nash equilibrium value to resolve the confusion in choosing appropriate bidders of...This paper presents a Game-theoretic optimization via Parallel Min-Max Ant System(PMMAS)algorithm is used in practice to determine the Nash equilibrium value to resolve the confusion in choosing appropriate bidders of multi-round procurement problem in software project management.To this end,we introduce an approach that proposes:(i)A Game-theoretic model of multiround procurement problem(ii)A Nash equilibrium strategy corresponds to multi-round strategy bid(iii)An application of PSO for the determination of global Nash equilibrium.The balance point in Nash Equilibrium can help to maintain a sustainable structure not only in terms of project management but also in terms of future cooperation.As an alternative of procuring entities subjectively,a methodology to support decision making has been studied using Nash equilibrium to create a balance point on benefit in procurement where buyers and suppliers need multiple rounds of bidding.Our goal focus on the balance point in Nash Equilibrium to optimizing bidder selection in multi-round procurement which is the most beneficial for both investors and selected tenderers.Our PMMAS algorithm is implemented based on MPI(message passing interface)to find the approximate optimal solution for the question of how to choose bidders and ensure a path for a win-win relationship of all participants in the procurement process.We also evaluate the speedup ratio and parallel efficiency between our algorithm and other proposed algorithms.As the experiment results,the high feasibility and effectiveness of the PMMAS algorithm are verified.展开更多
Computing students face the problem with time and quality of the work while managing their graduation/senior projects.Rapid Application Development(RAD)model is based on continual user involvement for the process of r...Computing students face the problem with time and quality of the work while managing their graduation/senior projects.Rapid Application Development(RAD)model is based on continual user involvement for the process of requirement gathering via prototyping.After each iteration,the developers can validate the requirements that are completed in the iteration.Managing a project with RAD is easier but not flexible.On the other hand,Agile project management techniques focus on flexibility,agility,teamwork and quality based on user stories.Continual user involvement is avoided,which requires extensive maintenance time for fixing iteration and release of the story points.This also makes it necessary to provide onsite training to the users of the application.This research provides the pros and cons of RAD and Agile project management techniques,to help students in deciding the best approach for managing their graduation projects.For the evaluation of these techniques,similar case studies were given to the senior project students(having similar CGPAs)for building similar functionality-based applications.The two projects“Life Organizer”developed and managed using RAD and“Smart Patient Assistant(SPA)”developed and managed through Agile methodology were evaluated against the quality assurance criteria for senior projects.The study found that the project developed with RAD methodology performed 13.33%better in providing extensive and elaborated documentation than the students following the Agile technique.On the other hand,SPA-Agile based project,due to teamwork had 2.5%better implementation than Life Organizer-RAD based project.展开更多
The critical path method is one of the oldest and most important techniques used for planning and scheduling projects.The main objective of project management science is to determine the critical path through a networ...The critical path method is one of the oldest and most important techniques used for planning and scheduling projects.The main objective of project management science is to determine the critical path through a network representation of projects.The critical path through a network can be determined by many algorithms and is useful for managing,monitoring,and controlling the time and cost of an entire project.The essential problem in this case is that activity durations are uncertain;time presents considerable uncertainty because the time of an activity is not always easily or accurately estimated.This issue increases the need to use neutrosophic theory to solve the critical path problem.Real-world problems are characterized by a lack of precision,consistency,and completeness.The concept of neutrosophic sets has been introduced as a generalization of fuzzy,intuitionistic fuzzy,and crisp sets to overcome the ambiguity surrounding real-world problems.Truth-,falsity-,and indeterminacy-membership functions are used to express neutrosophic elements.This study was performed to examine a neutrosophic event-oriented algorithm for determining the critical path in activity-on-arc networks.The activity time estimates are presented as trapezoidal neutrosophic numbers,and score and accuracy functions are used to obtain a crisp model of the problem.An appropriate numerical example is then used to explain the proposed method.展开更多
This research study elaborates and conceptualizes the architectural framework of Industry 4.0 to be applied to project management.Research is based on the literature in digital transformation in project management and...This research study elaborates and conceptualizes the architectural framework of Industry 4.0 to be applied to project management.Research is based on the literature in digital transformation in project management and extends the literature in adding the feasibility of Industry 4.0 applied to project management.The exploring paradigm of Industry 4.0 is 5-layer architecture.Mixed research approach,a blend of qualitative and quantitative approach is adopted with the objective of acquisition of knowledge,examination of the concepts,and analysis of the theories in order to understand feasibility of Industry 4.0 in a constructive research methodology.Findings of the research suggest the feasibility of implementation of Industry 4.0 concepts for project management,especially for project monitoring and control.It is explored that there can be an automation of project management process with a certain degree of capability in decision making.展开更多
Many companies work in projects and the number of companies working in multi-project management is growing worldwide.In Germany and Europe there are a large number of companies that are active in this area depending o...Many companies work in projects and the number of companies working in multi-project management is growing worldwide.In Germany and Europe there are a large number of companies that are active in this area depending on the industry.However,there is also the question if it makes sense in addition to the organization and structure,to implement agile leadership.Agility in project management refers not only to the organizational structure(agile organization)and processes(agile working),but also to the behavior and attitudes of the organization members(agile mindset)(Häusling&Rutz,2017).Executives in particular are faced with radically changed framework conditions in an agile environment:Agile leadership requires a new understanding of leadership and a new leadership attitude.Agile leadership models bring with them new leadership principles and leadership roles.This paper shows that by introducing the components of agile leadership,a company can lower its fluctuation rate and keep it stable.A 24-month study in a company working in the fields,energy construction/line layout/communication technology industry,showed that the fluctuation rate could be reduced and kept stable from an average of 14.85%after the introduction of agile leadership to 8.6%.展开更多
As discovered, today’s Rwandan construction industry is developing day by day, which plays a very important role in the country’s economic growth. In the construction industry, project consultants play a very signif...As discovered, today’s Rwandan construction industry is developing day by day, which plays a very important role in the country’s economic growth. In the construction industry, project consultants play a very significant role in providing services for such projects. The project consultants provide services from the beginning of the project to the completion of the project. Using project consultants is very useful for construction projects because it can ameliorate project efficiency and effectiveness. The main purpose of this paper is to investigate the relationship between project consultants’ performance and project success in the Rwandan construction industry. The data used in this study were obtained from primary and secondary sources. The secondary data was attained through an elaborated literature review of various books, articles, and papers related to this research to outlining and describing the chief ideas of this research title. The primary data was compiled through a questionnaire survey that was directed to 110 selected professionals in the construction projects in Rwanda to collect data from the site for statistical analysis of the research to test the hypothesis. However, a total of 90 usable responses were received within the scheduled period representing the response rate of 81.82%, which is likely to be representative and acceptable. Data collected from the questionnaire surveys were analyzed using the Statistical Package for Social Scientists (SPSS), excel spreadsheets, and Relative Importance Index (RII), which provide more merit presentations. The survey results show that even if there are many obstacles in the use of project consultants in the Rwandan construction industry such as lack of knowledge and practice in project consulting, lack of well-trained project consulting professionals, lack of training opportunities in project consulting, lack of knowledge and experience in addition to the senior management opposition, and lack of local project consulting guidelines and information;they are needed in the construction project to make it more successful through reducing and saving the overall project’s life cycle cost according to client’s wishes, keeping time of construction project, improving quality of the project products in the present and future, removing major variations that affect construction project with its attendant cost overrun, and advising on construction project process. Therefore, it is more important to remark that the good performance of the project consultants in any industry especially in the construction industry will contribute to the successful implementation of the project. From the results of the study, the performance of project consultants is closely related to the success of the construction industry in Rwanda. The project consultants’ leading skills and knowledge automatically guide the project to complete with accurate time, budget, and quality to make the project successful. In this paper, we will also consider the project success criteria;the role and responsibility of project consultants;the factors affecting the performance of project consultants;and the reasons that hinder the implementation of project consulting in the Rwandan construction industry.展开更多
Many organizations are struggling to provide high bandwidth and reliable internet connectivity at their branch offices and business locations and getting the most out of their operational expense.The need for internet...Many organizations are struggling to provide high bandwidth and reliable internet connectivity at their branch offices and business locations and getting the most out of their operational expense.The need for internet connectivity at any branch offices and business locations is not a luxury anymore but is a necessity.Let us try to understand how to plan and document the SDWAN(Software Defined-Wide Area Network)implementation in an organization.We will try to understand why it is essential to implement the new technology instead of investing in the existing MPLS(Multi-Protocol label switching)by taking an example of a retail organization.Methods:This project/research was performed using the abilities of Software Defined Network Technology and options available in MPLS(Multi-Protocol Label Switching).The Technical Project management principles were adopted as per PMI(Project Management Institute)waterfall methodology.Results/Conclusion:SDWAN technology provides an effective replacement of MPLS network connection for providing WAN connectivity for our office locations.It is essential to follow a documented process for appropriate vendor selection based on the available features and other listed attributes in the article.To be successful in the implementation it is essential to perform a POC(Proof of Concept)in a controlled environment and validate results.SDWAN provides better network performance and improves reliability as the links operate in active-active function.展开更多
Recent studies on collaborative practices in large infrastructural projects address the importance of discursive strategies and power relations in dynamic project arenas [1]-[3]. This paper focuses on the coping narra...Recent studies on collaborative practices in large infrastructural projects address the importance of discursive strategies and power relations in dynamic project arenas [1]-[3]. This paper focuses on the coping narratives developed by contract team members during the building phase of a large-scale infrastructural project. Coping narratives relate to the management based grand narrative of the project and are produced and shaped in the process of sense making. By analyzing this interaction and the developments in a specific sub-team of a project, which is faced with multiple identity claims, this paper aims to contribute to the knowledge on how policies, views and decisions on an organizational level work out in project teams. The empirical material relates to a recent Dutch Mega-Project regarding the construction of a new sea defense and boulevard in Scheveningen. This paper shows that developments, discourses and decisions on an organizational level are of importance for the commencing coping narratives in project teams.展开更多
In order to realize the standardization and normalization of environmental protection project management.This paper uses the literature method to study the current status of the existing project management mode,and po...In order to realize the standardization and normalization of environmental protection project management.This paper uses the literature method to study the current status of the existing project management mode,and points out the problems:lack of a sound project management system,insufficient information application of project management,and unclear decentralization in project management;on this basis,this paper proposes optimization strategies from the aspects of perfecting the engineering project management system,clarifying the allocation of project management authority,and strengthening the construction of engineering project management information.And put forward the future development trend of project engineering management,on the basis of two mainstream management modes of BOT(Build-Operate-Transfer)and EPC(Engineering Procurement Construction),build a standardized project management platform to achieve intelligent management.Realize intelligent management of engineering project management to achieve standardization and standardization,greatly improving the efficiency of project management.展开更多
In this paper,we discuss the influence of economic,environmental and legal policies of the state on the management of investment projects in the area of industrial construction in Poland.Our empirical study relies on ...In this paper,we discuss the influence of economic,environmental and legal policies of the state on the management of investment projects in the area of industrial construction in Poland.Our empirical study relies on conducting a questionnaire survey.A total of 158 Polish companies dealing with industrial construction took part in the survey.Then,the collected questionnaires were subjected to a thorough analysis and interpretation,with the use of a method called the exploratory factor analysis(EFA).Our research reveals the key factors influencing successful investment project management in the Polish industrial construction sector.These factors have been identified as the“availability of technology in a stable political system”,“stability of the economic and tax systems”,“stable social system policy,stability and transparency of the legal system”and a“well-targeted environmental policy”.A key conclusion that can be drawn from our study is that an efficient management of investment projects in the industrial construction industry is significantly influenced by properly shaped and stable economic,environmental,and legal policies of the state.展开更多
Construction project management is an important aspect of civil engineering construction. How to use scientific and efficient methods to effectively man</span><span style="font-family:Verdana;">a...Construction project management is an important aspect of civil engineering construction. How to use scientific and efficient methods to effectively man</span><span style="font-family:Verdana;">age construction projects is the focus of construction project development un</span><span style="font-family:Verdana;">der the current situation. This article discusses the application of fuzzy mathematics in construction project management. The study found that in the process of construction project management, it was found that a single fuzzy </span><span style="font-family:Verdana;">mathematical method was difficult to adapt to the current complex and cha</span><span style="font-family:Verdana;">ngeable construction projects. Combining fuzzy mathematics with other man</span><span style="font-family:Verdana;">agement methods and computer applications can better simplify complex</span><span style="font-family:Verdana;"> things, reduce human subjectivity, increase calculation speed, and achieve a combination of qualitative and quantitative research;selection of optimization schemes and risk assessment, etc. All have a good effect, and can better </span><span style="font-family:Verdana;">deal with possible or uncertain things and emergencies in the process of pr</span><span style="font-family:Verdana;">oject management. At the same time, combining fuzzy mathematics with heuristic algorithms or meta-heuristic algorithms can make research more objective, improve management efficiency and calculation speed.展开更多
文摘The Fourth Industrial Revolution (4IR) is transforming the way we live, learn, work, and relate to one another. However, there is still an awareness inadequacy of the 4IR among project managers and the society in Tanzania, thus low readiness to conceptualize, implement and manage 4IR-related projects in the country. This study aimed to assess the 4IR readiness of project managers in Tanzania. The assessment is made in the frame of 4 readiness dimensions: strategy and governance structure, technology awareness, human capital digital skills development, and social-economic impact. The research used a quantitative method with the diffusion of innovations theory perspective, and data were collected mainly through an online survey questionnaire. The survey aimed at answering the research question concerning the project managers’ readiness for the 4IR. The 50 valid samples were completed by project managers from various industries such as agriculture, finance, consulting, construction, education and training, government, healthcare, Information Technology, and manufacturing. Data were analysed using SPSS. The results revealed that despite the generally low awareness of 4IR, several project managers in Tanzania have some varying awareness of 4IR technologies such as artificial intelligence, Internet of Things (IoT), data analytics, blockchain, robotics, cryptocurrency, chatbots, drones, and other digital transformation platforms. The results also indicated that project managers in Tanzania had little extent in readiness to initiate, develop and implement 4IR products and services due to inadequate 4IR-related awareness, strategy and governance structure, human capital digital skills development, and social economic impact. Consequently, some recommendations are made in the frame of the four assessed readiness dimensions for improvement. The value of this research is mainly to provide the state of 4IR readiness of project managers and associated recommendations to policymakers, practitioners, academia, donors, business industry and youth in digital innovation. The study also contributes to the body of knowledge on 4IR, project management and digital transformation.
文摘Project management grows with and boosts China’s economic development Project management certification is a relatively new trend in China, but already professional training courses
文摘The main purpose of this literature review is to understand the effectiveness and impacts of Robotics Process Automation (RPA) on the practices of Project Management (PM). For attaining the purposes of the research study, an extensive literature review was conducted, which helped in gaining a theoretical understanding. These findings were then justified with the help of current and relevant secondary sources in the analysis section. The findings suggested that RPA is quite advantageous for implementing in varied aspects of a business, especially in the field of project management. However, it can pose several challenges, which need to be taken into due consideration by the organizations during execution such as the capabilities of the employees and the abilities of the existing systems to incorporate automation, among others. It was ultimately concluded that RPA is highly advantageous for project management teams but its effective implementation is the key to success.
基金supported by the Deanship of Scientific Research,Vice Presidency for Graduate Studies and Scientific Research,King Faisal University,Saudi Arabia[Grant No.GRANT3862].
文摘The idea of linear Diophantine fuzzy set(LDFS)theory with its control parameters is a strong model for machine learning and optimization under uncertainty.The activity times in the critical path method(CPM)representation procedures approach are initially static,but in the Project Evaluation and Review Technique(PERT)approach,they are probabilistic.This study proposes a novel way of project review and assessment methodology for a project network in a linear Diophantine fuzzy(LDF)environment.The LDF expected task time,LDF variance,LDF critical path,and LDF total expected time for determining the project network are all computed using LDF numbers as the time of each activity in the project network.The primary premise of the LDF-PERT approach is to address ambiguities in project network activity timesmore simply than other approaches such as conventional PERT,Fuzzy PERT,and so on.The LDF-PERT is an efficient approach to analyzing symmetries in fuzzy control systems to seek an optimal decision.We also present a new approach for locating LDF-CPM in a project network with uncertain and erroneous activity timings.When the available resources and activity times are imprecise and unpredictable,this strategy can help decision-makers make better judgments in a project.A comparison analysis of the proposed technique with the existing techniques has also been discussed.The suggested techniques are demonstrated with two suitable numerical examples.
基金Soft Science Project of Science and Technology Department of Sichuan Province(20RKX0728).
文摘With the continuous implementation of the PPP projects,due to the imperfection of relevant policies,the blindness of government subsidy is constantly emerging.Thus,it is important to put forward a practical approach for valuing the subsidies and risk.In this paper,the revenue subsidies model and traffic subsidies model are established.Then combined with practical cases,Monte Carlo simulation is used to get the value and probability of government subsidies under different compensation ways.On this basis,the influence of initial traffic volume and traffic growth rate on government subsidies and net present value of investors is analyzed.The research findings can provide theoretical guidance for the government to choose a reasonable way of subsidies,balance the risk of compensation,and formulate subsidies policies.
文摘Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its great contributions to the national gross domestic product (GDP) of the country. Concerning construction processes, both risk management (RM) and value engineering (VE) techniques have commonalities from the beginning up to the completion of the project due to enhancing the project value/quality, meeting the project deadline, and reducing overall project cost. VE includes resolving the uncertainty of project objectives and ensuring that the project is delivered in a value for money way. The key point of RM is to solve the uncertainty of the project itself and its results to ensure that the specifications are achieved within the prescribed time, cost, and quality constraints. This review work is comparatively and collectively focus</span><span style="font-family:Verdana;">ed</span><span style="font-family:Verdana;"> on assessing the role of RM and VE tools for project successful delivery. It studies the points of difference and common features of the two aspects in terms of construction project delivery. So, this study concluded that in construction RM tool cannot be the chief aim of the all parties involved in the project execution because sometimes it produces itself negative results and reduces project management success. Therefore, RM needs a strong combination with VE due to the dependence of the target in identifying and assessing risks by considering the highest performance and lowest cost. The integration of RM and VE combination in a single study would avoid duplication of work and deliver better value for money thereby leading to better project outcomes.
文摘Hospital projects worldwide often experience misperformance,showing a tendency to exceed their estimated cost,miss their deadline,suffer quality problems,and yield benefit shortfalls.Considering this ubiquitous problem,this paper aims to make sense of this phenomenon by addressing the following research question:How can we make sense of hospital project misperformance,and what can be done to mitigate its occurrence?We use an illustrative case study approach and the analytical lens of sense-making to examine the misperformance of three mega-hospital projects.Our research reveals issues such as scope changes,an inability to adapt and respond to risk and uncertainty,ineffectual project management and governance,and optimism bias,which combine to impact project performance adversely.We suggest that the two prominent theoretical perspectives dominating the literature in this field fall short of adequately explaining hospital project misperformance.We provide suggestions for improving the procurement process of hospitals and submit there is a need to develop a robust and balanced theory of project misperformance.
基金Chongqing Higher Education Teaching Reform Research Project Application Research of Blending Teaching based on Duifene Teaching Platform 203195.Chongqing Higher Vocational and Technical Education Research Association.Mobile phones in the classroom:a practical study on building a 1:1 digital teaching model GY201084.
文摘The Duifene teaching platform is a product of various teaching methods,which greatly improves the traditional teaching method.This article introduces the function and characteristics of a blended teaching platform as well as its application for histology and embryology modules.In addition,the advantages and disadvantages of blended teaching method is also discussed.The application of this teaching platform for Construction Project Management modules encourages students to be more enthusiastic and interested toward learning.This allows a more convenient and rapid teacher-student and student-student interaction thereby improving the teaching and learning experiences.
基金Vietnam National Foundation for Science and TechnologyDevelopment(NAFOSTED)under grant number 102.03-2019.10.
文摘This paper presents a Game-theoretic optimization via Parallel Min-Max Ant System(PMMAS)algorithm is used in practice to determine the Nash equilibrium value to resolve the confusion in choosing appropriate bidders of multi-round procurement problem in software project management.To this end,we introduce an approach that proposes:(i)A Game-theoretic model of multiround procurement problem(ii)A Nash equilibrium strategy corresponds to multi-round strategy bid(iii)An application of PSO for the determination of global Nash equilibrium.The balance point in Nash Equilibrium can help to maintain a sustainable structure not only in terms of project management but also in terms of future cooperation.As an alternative of procuring entities subjectively,a methodology to support decision making has been studied using Nash equilibrium to create a balance point on benefit in procurement where buyers and suppliers need multiple rounds of bidding.Our goal focus on the balance point in Nash Equilibrium to optimizing bidder selection in multi-round procurement which is the most beneficial for both investors and selected tenderers.Our PMMAS algorithm is implemented based on MPI(message passing interface)to find the approximate optimal solution for the question of how to choose bidders and ensure a path for a win-win relationship of all participants in the procurement process.We also evaluate the speedup ratio and parallel efficiency between our algorithm and other proposed algorithms.As the experiment results,the high feasibility and effectiveness of the PMMAS algorithm are verified.
文摘Computing students face the problem with time and quality of the work while managing their graduation/senior projects.Rapid Application Development(RAD)model is based on continual user involvement for the process of requirement gathering via prototyping.After each iteration,the developers can validate the requirements that are completed in the iteration.Managing a project with RAD is easier but not flexible.On the other hand,Agile project management techniques focus on flexibility,agility,teamwork and quality based on user stories.Continual user involvement is avoided,which requires extensive maintenance time for fixing iteration and release of the story points.This also makes it necessary to provide onsite training to the users of the application.This research provides the pros and cons of RAD and Agile project management techniques,to help students in deciding the best approach for managing their graduation projects.For the evaluation of these techniques,similar case studies were given to the senior project students(having similar CGPAs)for building similar functionality-based applications.The two projects“Life Organizer”developed and managed using RAD and“Smart Patient Assistant(SPA)”developed and managed through Agile methodology were evaluated against the quality assurance criteria for senior projects.The study found that the project developed with RAD methodology performed 13.33%better in providing extensive and elaborated documentation than the students following the Agile technique.On the other hand,SPA-Agile based project,due to teamwork had 2.5%better implementation than Life Organizer-RAD based project.
基金This work was supported by the Soonchunhyang University Research Fund.
文摘The critical path method is one of the oldest and most important techniques used for planning and scheduling projects.The main objective of project management science is to determine the critical path through a network representation of projects.The critical path through a network can be determined by many algorithms and is useful for managing,monitoring,and controlling the time and cost of an entire project.The essential problem in this case is that activity durations are uncertain;time presents considerable uncertainty because the time of an activity is not always easily or accurately estimated.This issue increases the need to use neutrosophic theory to solve the critical path problem.Real-world problems are characterized by a lack of precision,consistency,and completeness.The concept of neutrosophic sets has been introduced as a generalization of fuzzy,intuitionistic fuzzy,and crisp sets to overcome the ambiguity surrounding real-world problems.Truth-,falsity-,and indeterminacy-membership functions are used to express neutrosophic elements.This study was performed to examine a neutrosophic event-oriented algorithm for determining the critical path in activity-on-arc networks.The activity time estimates are presented as trapezoidal neutrosophic numbers,and score and accuracy functions are used to obtain a crisp model of the problem.An appropriate numerical example is then used to explain the proposed method.
文摘This research study elaborates and conceptualizes the architectural framework of Industry 4.0 to be applied to project management.Research is based on the literature in digital transformation in project management and extends the literature in adding the feasibility of Industry 4.0 applied to project management.The exploring paradigm of Industry 4.0 is 5-layer architecture.Mixed research approach,a blend of qualitative and quantitative approach is adopted with the objective of acquisition of knowledge,examination of the concepts,and analysis of the theories in order to understand feasibility of Industry 4.0 in a constructive research methodology.Findings of the research suggest the feasibility of implementation of Industry 4.0 concepts for project management,especially for project monitoring and control.It is explored that there can be an automation of project management process with a certain degree of capability in decision making.
文摘Many companies work in projects and the number of companies working in multi-project management is growing worldwide.In Germany and Europe there are a large number of companies that are active in this area depending on the industry.However,there is also the question if it makes sense in addition to the organization and structure,to implement agile leadership.Agility in project management refers not only to the organizational structure(agile organization)and processes(agile working),but also to the behavior and attitudes of the organization members(agile mindset)(Häusling&Rutz,2017).Executives in particular are faced with radically changed framework conditions in an agile environment:Agile leadership requires a new understanding of leadership and a new leadership attitude.Agile leadership models bring with them new leadership principles and leadership roles.This paper shows that by introducing the components of agile leadership,a company can lower its fluctuation rate and keep it stable.A 24-month study in a company working in the fields,energy construction/line layout/communication technology industry,showed that the fluctuation rate could be reduced and kept stable from an average of 14.85%after the introduction of agile leadership to 8.6%.
文摘As discovered, today’s Rwandan construction industry is developing day by day, which plays a very important role in the country’s economic growth. In the construction industry, project consultants play a very significant role in providing services for such projects. The project consultants provide services from the beginning of the project to the completion of the project. Using project consultants is very useful for construction projects because it can ameliorate project efficiency and effectiveness. The main purpose of this paper is to investigate the relationship between project consultants’ performance and project success in the Rwandan construction industry. The data used in this study were obtained from primary and secondary sources. The secondary data was attained through an elaborated literature review of various books, articles, and papers related to this research to outlining and describing the chief ideas of this research title. The primary data was compiled through a questionnaire survey that was directed to 110 selected professionals in the construction projects in Rwanda to collect data from the site for statistical analysis of the research to test the hypothesis. However, a total of 90 usable responses were received within the scheduled period representing the response rate of 81.82%, which is likely to be representative and acceptable. Data collected from the questionnaire surveys were analyzed using the Statistical Package for Social Scientists (SPSS), excel spreadsheets, and Relative Importance Index (RII), which provide more merit presentations. The survey results show that even if there are many obstacles in the use of project consultants in the Rwandan construction industry such as lack of knowledge and practice in project consulting, lack of well-trained project consulting professionals, lack of training opportunities in project consulting, lack of knowledge and experience in addition to the senior management opposition, and lack of local project consulting guidelines and information;they are needed in the construction project to make it more successful through reducing and saving the overall project’s life cycle cost according to client’s wishes, keeping time of construction project, improving quality of the project products in the present and future, removing major variations that affect construction project with its attendant cost overrun, and advising on construction project process. Therefore, it is more important to remark that the good performance of the project consultants in any industry especially in the construction industry will contribute to the successful implementation of the project. From the results of the study, the performance of project consultants is closely related to the success of the construction industry in Rwanda. The project consultants’ leading skills and knowledge automatically guide the project to complete with accurate time, budget, and quality to make the project successful. In this paper, we will also consider the project success criteria;the role and responsibility of project consultants;the factors affecting the performance of project consultants;and the reasons that hinder the implementation of project consulting in the Rwandan construction industry.
文摘Many organizations are struggling to provide high bandwidth and reliable internet connectivity at their branch offices and business locations and getting the most out of their operational expense.The need for internet connectivity at any branch offices and business locations is not a luxury anymore but is a necessity.Let us try to understand how to plan and document the SDWAN(Software Defined-Wide Area Network)implementation in an organization.We will try to understand why it is essential to implement the new technology instead of investing in the existing MPLS(Multi-Protocol label switching)by taking an example of a retail organization.Methods:This project/research was performed using the abilities of Software Defined Network Technology and options available in MPLS(Multi-Protocol Label Switching).The Technical Project management principles were adopted as per PMI(Project Management Institute)waterfall methodology.Results/Conclusion:SDWAN technology provides an effective replacement of MPLS network connection for providing WAN connectivity for our office locations.It is essential to follow a documented process for appropriate vendor selection based on the available features and other listed attributes in the article.To be successful in the implementation it is essential to perform a POC(Proof of Concept)in a controlled environment and validate results.SDWAN provides better network performance and improves reliability as the links operate in active-active function.
文摘Recent studies on collaborative practices in large infrastructural projects address the importance of discursive strategies and power relations in dynamic project arenas [1]-[3]. This paper focuses on the coping narratives developed by contract team members during the building phase of a large-scale infrastructural project. Coping narratives relate to the management based grand narrative of the project and are produced and shaped in the process of sense making. By analyzing this interaction and the developments in a specific sub-team of a project, which is faced with multiple identity claims, this paper aims to contribute to the knowledge on how policies, views and decisions on an organizational level work out in project teams. The empirical material relates to a recent Dutch Mega-Project regarding the construction of a new sea defense and boulevard in Scheveningen. This paper shows that developments, discourses and decisions on an organizational level are of importance for the commencing coping narratives in project teams.
文摘In order to realize the standardization and normalization of environmental protection project management.This paper uses the literature method to study the current status of the existing project management mode,and points out the problems:lack of a sound project management system,insufficient information application of project management,and unclear decentralization in project management;on this basis,this paper proposes optimization strategies from the aspects of perfecting the engineering project management system,clarifying the allocation of project management authority,and strengthening the construction of engineering project management information.And put forward the future development trend of project engineering management,on the basis of two mainstream management modes of BOT(Build-Operate-Transfer)and EPC(Engineering Procurement Construction),build a standardized project management platform to achieve intelligent management.Realize intelligent management of engineering project management to achieve standardization and standardization,greatly improving the efficiency of project management.
文摘In this paper,we discuss the influence of economic,environmental and legal policies of the state on the management of investment projects in the area of industrial construction in Poland.Our empirical study relies on conducting a questionnaire survey.A total of 158 Polish companies dealing with industrial construction took part in the survey.Then,the collected questionnaires were subjected to a thorough analysis and interpretation,with the use of a method called the exploratory factor analysis(EFA).Our research reveals the key factors influencing successful investment project management in the Polish industrial construction sector.These factors have been identified as the“availability of technology in a stable political system”,“stability of the economic and tax systems”,“stable social system policy,stability and transparency of the legal system”and a“well-targeted environmental policy”.A key conclusion that can be drawn from our study is that an efficient management of investment projects in the industrial construction industry is significantly influenced by properly shaped and stable economic,environmental,and legal policies of the state.
文摘Construction project management is an important aspect of civil engineering construction. How to use scientific and efficient methods to effectively man</span><span style="font-family:Verdana;">age construction projects is the focus of construction project development un</span><span style="font-family:Verdana;">der the current situation. This article discusses the application of fuzzy mathematics in construction project management. The study found that in the process of construction project management, it was found that a single fuzzy </span><span style="font-family:Verdana;">mathematical method was difficult to adapt to the current complex and cha</span><span style="font-family:Verdana;">ngeable construction projects. Combining fuzzy mathematics with other man</span><span style="font-family:Verdana;">agement methods and computer applications can better simplify complex</span><span style="font-family:Verdana;"> things, reduce human subjectivity, increase calculation speed, and achieve a combination of qualitative and quantitative research;selection of optimization schemes and risk assessment, etc. All have a good effect, and can better </span><span style="font-family:Verdana;">deal with possible or uncertain things and emergencies in the process of pr</span><span style="font-family:Verdana;">oject management. At the same time, combining fuzzy mathematics with heuristic algorithms or meta-heuristic algorithms can make research more objective, improve management efficiency and calculation speed.