期刊文献+
共找到1,117篇文章
< 1 2 56 >
每页显示 20 50 100
Microwave-Assisted Au and Ag Nanoparticle Synthesis: An Energy Phase-Space Projection Analysis
1
作者 Victor J. Law Denis P. Dowling 《American Journal of Analytical Chemistry》 CAS 2023年第4期149-174,共26页
Microwave-assisted synthesis of gold and silver nanoparticles, as a function of Green Chemistry, non Green Chemistry, and four applicator types are reported. The applicator types are Domestic microwave ovens, commerci... Microwave-assisted synthesis of gold and silver nanoparticles, as a function of Green Chemistry, non Green Chemistry, and four applicator types are reported. The applicator types are Domestic microwave ovens, commercial temperature controlled microwave chemistry ovens (TCMC), digesters, and axial field helical antennae. For each of these microwave applicators the process energy budget where estimated (Watts multiplied by process time = kJ) and energy density (applied energy divided by suspension volume = kJ·ml<sup>-1</sup>) range between 180 ± 176.8 kJ, and 79.5 ± 79 kJ·ml<sup>-1</sup>, respectively. The axial field helical field an-tenna applicator is found to be the most energy efficient (0.253 kJ·m<sup>-1</sup> per kJ, at 36 W). Followed by microwave ovens (4.47 ± 3.9 kJ·ml<sup>-1</sup> per 76.83 ± 39 kJ), and TCMC ovens (2.86 ± 2.3 kJ·m<sup>-1</sup> per 343 ± 321.5 kJ). The digester applicators have the least energy efficiency (36.2 ± 50.7 kJ·m<sup>-1</sup> per 1010 ± 620 kJ). A comparison with reconstructed ‘non-thermal’ microwave oven inactivation microorganism experiments yields a power-law signature of n = 0.846 (R<sup>2</sup> = 0.7923) four orders of magnitude. The paper provides a discussion on the Au and Ag nanoparticle chemistry and bio-chemistry synthesis aspects of the microwave applicator energy datasets and variation within each dataset. The visual and analytical approach within the energy phase-space projection enables a nanoparticle synthesis route to be systematically characterized, and where changes to the synthesis are to be mapped and compared directly with historical datasets. In order to help identify lower cost nanoparticle synthesis, in addition to potentially reduce synthesis energy to routes informed changes to potentially reduce synthesis energy budget, along with nanoparticle morphology and yield. 展开更多
关键词 Turkevich Microwave-Assisted Synthesis Ag AU HYDROXYAPATITE Nanoparticle FUNCTIONALIZATION Energy phase-Space projection
下载PDF
Projected Regional 1.50℃and 2.00℃Warming Threshold-crossing Time Worldwide Using the CMIP6 Models
2
作者 MENG Yali DUAN Keqin +5 位作者 SHANG Wei SHI Peihong LI Shuangshuang CHENG Ying CHEN Rong ZHANG Zhaopeng 《Chinese Geographical Science》 SCIE CSCD 2023年第6期1095-1108,共14页
The Paris Agreement aims to limit global warming to well below 2.00℃and pursue efforts to limit the temperature increase to 1.50℃.However,the response of climate change to unbalanced global warming is affected by sp... The Paris Agreement aims to limit global warming to well below 2.00℃and pursue efforts to limit the temperature increase to 1.50℃.However,the response of climate change to unbalanced global warming is affected by spatial and temporal sensitivities.To better understand the regional warming response to global warming at 1.50℃and 2.00℃,we detected the 1.50℃and 2.00℃warming threshold-crossing time(WTT)above pre-industrial levels globally using the Coupled Model Intercomparison Project phase 6(CMIP6)models.Our findings indicate that the 1.50℃or 2.00℃WTT differs substantially worldwide.The warming rate of land would be approximately 1.35–1.46 times that of the ocean between 60°N–60°S in 2015–2100.Consequently,the land would experience a 1.50℃(2.00℃)warming at least 10–20 yr earlier than the time when the global mean near-surface air temperature reaches 1.50℃(2.00℃)WTT.Meanwhile,the Southern Ocean between 0°and 60°S considerably slows down the global 1.50℃and 2.00℃WTT.In 2040–2060,over 98.70%(77.50%),99.70%(89.30%),99.80%(93.40%),and 100.00%(98.00%)of the land will have warmed by over 1.50℃(2.00℃)under SSP(Shared Socioeconomic Pathway)1–2.6,SSP2-4.5,SSP3-7.0,and SSP5-8.5,respectively.We conclude that regional 1.50℃(2.00℃)WTT should be fully considered,especially in vulnerable high-latitude and high-altitude regions. 展开更多
关键词 CMIP6(Coupled Model Intercomparison project phase 6) global warming 1.50℃warming time 2.00℃warming time regional differences
下载PDF
Mintal Group's High-carbon Ferrochrome 350,000-ton Project Phase Ⅲ Starts Construction
3
《China Nonferrous Metals Monthly》 2018年第6期5-5,共1页
Recently,Mintal Group commenced construction of a stainless steel base materials project with an annual output of 350,000 tons,marking that the Phase I base material project for the supply of basic raw materials for t... Recently,Mintal Group commenced construction of a stainless steel base materials project with an annual output of 350,000 tons,marking that the Phase I base material project for the supply of basic raw materials for the Mintal’s stainless steel production enters into the implementation phase.This project is also known as Mintal’s high-carbon ferrochrome project phase III with an investment of 900million yuan and occupying an area of 300 mu. 展开更多
关键词 Mintal Group’s High-carbon Ferrochrome 350 000-ton project phase Starts Construction
原文传递
DEFORMATION MEASUREMENT USING DUAL-FREQUENCY PROJECTION GRATING PHASE-SHIFT PROFILOMETRY 被引量:2
4
作者 Yanming Chen Yuming He Eryi Hu Hongmao Zhu 《Acta Mechanica Solida Sinica》 SCIE EI 2008年第2期110-115,共6页
2π phase ambiguity problem is very important in phase measurement when a deformed object has a large out of plane displacement. The dual-frequency projection grating phaseshifting profilometry (PSP) can be used to ... 2π phase ambiguity problem is very important in phase measurement when a deformed object has a large out of plane displacement. The dual-frequency projection grating phaseshifting profilometry (PSP) can be used to solve such an issue. In the measurement, two properchosen frequency gratings are utilized to synthesize an equivalent wavelength grating which ensures the computed phase in a principal phase range. Thus, the error caused by the phase unwrapping process with the conventional phase reconstruct algorithm can be eliminated. Finally, experimental result of a specimen with large plastic deformation is given to prove that the proposed method is effective to handle the phase discontinuity. 展开更多
关键词 dual-frequency phase-shift profilometry projection grating phase unwrapping DEFORMATION
下载PDF
Quality Guided Phase Unwrapping for Fringe Projection Profilometry 被引量:1
5
作者 C.J.Tay 《实验力学》 CSCD 北大核心 2006年第1期71-76,共6页
Fringe projection technique is a non-contact, full field 3-D shape measurement method. The object depth information is recorded in one or several deformed fringe patterns. The phase-shifting algorithm or the Fourier t... Fringe projection technique is a non-contact, full field 3-D shape measurement method. The object depth information is recorded in one or several deformed fringe patterns. The phase-shifting algorithm or the Fourier transform method can be used to extract the wrapped phase data. A phase unwrapping process is then applied to retrieve a continuous phase distribution, which represents the surface profile of the test object. In this paper, a quality-guided phase unwrapping approach is incorporated and two novel phase quality evaluation methods are proposed to facilitate the phase unwrapping process. 展开更多
关键词 相品质 相展开 边缘发射 相移 傅立叶变换
下载PDF
Jilin Tongyu Wind Power Farm 2nd Phase Project put into operation
6
《Electricity》 2001年第1期51-51,共1页
关键词 WIND project Jilin Tongyu Wind Power Farm 2nd phase project put into operation
下载PDF
Xuanwei Power Plant 5th Phase Project was completely built up
7
《Electricity》 2001年第4期51-51,共1页
关键词 project Xuanwei Power Plant 5th phase project was completely built up
下载PDF
Self-reliance and Innovation of Qinshan Phase Ⅱ NPP Project
8
作者 Ye Qizhen,Yang Lanhe(Nuclear Power Qinshan Joint Venture Company,Haiyan 314300,China) 《工程科学(英文版)》 2007年第4期20-35,共16页
This article mainly describes the self-reliance and innovation of Qinshan nuclear power project of phase II,in-between it contains new reactor core design,as well as related experimental and calculation analysis,espec... This article mainly describes the self-reliance and innovation of Qinshan nuclear power project of phase II,in-between it contains new reactor core design,as well as related experimental and calculation analysis,especially for new reactor design produced fluid-induced vibration model test,theoretical analysis and testing in-built reactor;aiming at two-loop NSSS a series improvement made for safety systems and related safety analysis to enhance their reliability and redundancy;according to specialty of two-loop NSSS an optimization made for NPP parameters and design of related equipments,for the purpose to make the output of NPP maximal;design of main reactor building and T-G building also improved according to characteristics of two-loop NSSS and site conditions.CRDM and refueling machine are researched and manufactured on base of self-reliance,their performance are better than design requirements,large portion of key equipments are localized through different way.In construction first time realized the integrated erection of containment dome.During the commissioning non-nuclear steam driving of T-G set,as well as 500 kV high voltage rising using emergent diesel generator,etc.are carried out.In period of operation still continuous innovation and improvement are made,so that to keep the good record of operation. 展开更多
关键词 NUCLEAR POWER project phase
下载PDF
First phase project of Huaneng Yingkou Cogeneration Plant completed
9
《Electricity》 2010年第1期47-,共1页
On December 2, 2009, Unit 1 of Huaneng Yingkou Cogeneration Plant smoothly passed 168-hour triaoperation. 11 days later, Unit 2 also successfully passed the trial operation. The project
关键词 First phase project of Huaneng Yingkou Cogeneration Plant completed
下载PDF
The Document for Proposing Haiyang Nuclear Power Station 1st Phase Project in Shandong Province Submitted Formally to SPC
10
《Electricity》 1997年第3期48-48,共1页
关键词 project The Document for Proposing Haiyang Nuclear Power Station 1st phase project in Shandong Province Submitted Formally to SPC
下载PDF
Risk Assessment at the Design Phase of Construction Projects in Ghana
11
作者 Maurice Azochiman Awuni 《Journal of Building Construction and Planning Research》 2019年第2期39-58,共20页
The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected ou... The study was carried out exclusively in Ghana to explore the approaches employed by consultants in risk assessment at the design phase of projects in Ghana. One hundred and fourteen (114) consultants were selected out of a population of one hundred and eighty six (186) from three main professional associations in Ghana made up of the Ghana Institute of Architects, Ghana Institution of Engineers and the Ghana Institution of Surveyors (Quantity Surveying Division) practicing in Ghana for the study. Both primary and secondary data were collected. A descriptive survey was also used to observe and describe the presence, frequency or absence of characteristics of a phenomenon as it naturally occurred, in order to gain additional information. A questionnaire was also designed to collect data from the architects, engineers and quantity surveyors. The data was analyzed using Statistical Package for the Social Scientists (SPSS) 17.0. Descriptive and inferential statistics, such as frequency tables, percentages and cross tabulations were used in the data analysis and summaries. Simple tests of associations were undertaken by using Chi square and Cramer’s V statistics to compare relationships between variables. Again, relative importance index was also used to analyze some of the data by computing to deduce their rankings. The relative importance index was used to analyze some of the data by computing to deduce their rankings. The research revealed that majority of consultants had an average knowledge of risk management. Based on the findings it was recommended that consultants undergo advanced training in risk assessment. It was therefore suggested that consultancy firms should develop a set of laid down procedures for consultants to use in risk assessment in order that the use of intuition employed by majority is lessened. The challenges observed in risk assessment and the remedial steps suggested curtailing the detrimental effects of risks would be of wide importance to many developing economies. 展开更多
关键词 Construction INDUSTRY project RISK Management Assessment DESIGN phase
下载PDF
The second phase cofferdam of Three Gorges Project was started to dismantle
12
《Electricity》 2001年第4期52-52,共1页
关键词 project The second phase cofferdam of Three Gorges project was started to dismantle
下载PDF
A consistent projection-based SUPG/PSPG XFEM for incompressible two-phase flows 被引量:2
13
作者 Jian-Hui Liao Zhuo Zhuang 《Acta Mechanica Sinica》 SCIE EI CAS CSCD 2012年第5期1309-1322,共14页
In this paper, a consistent projection-based streamline upwind/pressure stabilizing Petrov-Galerkin (SUPG/PSPG) extended finite element method (XFEM) is presented to model incompressible immiscible two-phase flows... In this paper, a consistent projection-based streamline upwind/pressure stabilizing Petrov-Galerkin (SUPG/PSPG) extended finite element method (XFEM) is presented to model incompressible immiscible two-phase flows. As the application of linear elements in SUPG/PSPG schemes gives rise to inconsistency in stabilization terms due to the inability to regenerate the diffusive term from viscous stresses, the numerical accuracy would deteriorate dramatically. To address this issue, projections of convection and pressure gradient terms are constructed and incorporated into the stabilization formulation in our method. This would substantially recover the consistency and free the practitioner from burdensome computations of most items in the residual. Moreover, the XFEM is employed to consider in a convenient way the fluid properties that have interfacial jumps leading to discontinuities in the velocity and pressure fields as well as the projections. A number of numerical examples are analyzed to demonstrate the complete recovery of consistency, the reproduction of interfacial discontinuities and the ability of the proposed projection-based SUPG/PSPG XFEM to model two-phase flows with open and closed interfaces. 展开更多
关键词 Two-phase flow XFEM SUPG/PSPG algorithm Consistency Discontinuous projection
下载PDF
Macro-decision-making on Phase I Construction of the Three Gorges Project (TGP)
14
作者 Peng Qiyou (China Yangtze TGP Development Corporation, Yichang, Hubei\ 443002) 《工程科学(英文版)》 2003年第1期94-99,共6页
In this paper,the dominance of the national enterprise and current situation of project management are analyzed on the basis of sum of Phase Ⅰ Construction management of the Three Gorges Project.From the start point ... In this paper,the dominance of the national enterprise and current situation of project management are analyzed on the basis of sum of Phase Ⅰ Construction management of the Three Gorges Project.From the start point of idea modification and inner reformation of enterprise,some of concrete suggestions enhancing the project management, are offered in the paper. 展开更多
关键词 phase CONSTRUCTION project management MACROSCOPIC decison\|making
下载PDF
A Spectral Projected Gradient-Newton Two Phase Method for Constrained Nonlinear Equations
15
作者 Yuezhe Zhang 《Journal of Applied Mathematics and Physics》 2019年第1期104-110,共7页
In this paper, we proposed a spectral gradient-Newton two phase method for constrained semismooth equations. In the first stage, we use the spectral projected gradient to obtain the global convergence of the algorithm... In this paper, we proposed a spectral gradient-Newton two phase method for constrained semismooth equations. In the first stage, we use the spectral projected gradient to obtain the global convergence of the algorithm, and then use the final point in the first stage as a new initial point to turn to a projected semismooth asymptotically newton method for fast convergence. 展开更多
关键词 CONSTRAINED SEMISMOOTH Equations SPECTRAL projected Gradient METHOD NEWTON METHOD Two-phase
下载PDF
Low side lobe pattern synthesis using projection method with genetic algorithm for truncated cone conformal phased arrays 被引量:7
16
作者 Guoqi Zeng Siyin Li +1 位作者 Yan Zhang Shanwei L 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2014年第4期554-559,共6页
A hybrid method for synthesizing antenna's three dimensional (3D) pattern is proposed to obtain the low sidelobe feature of truncated cone conformal phased arrays. In this method, the elements of truncated cone con... A hybrid method for synthesizing antenna's three dimensional (3D) pattern is proposed to obtain the low sidelobe feature of truncated cone conformal phased arrays. In this method, the elements of truncated cone conformal phased arrays are projected to the tangent plane in one generatrix of the truncated cone. Then two dimensional (2D) Chebyshev amplitude distribution optimization is respectively used in two mutual vertical directions of the tangent plane. According to the location of the elements, the excitation current amplitude distribution of each element on the conformal structure is derived reversely, then the excitation current amplitude is further optimized by using the genetic algorithm (GA). A truncated cone problem with 8x8 elements on it, and a 3D pattern desired side lobe level (SLL) up to 35 dB, is studied. By using the hybrid method, the optimal goal is accomplished with acceptable CPU time, which indicates that this hybrid method for the low sidelobe synthesis is feasible. 展开更多
关键词 conformal phased array low side lobe pattern synthe-sis projection method genetic algorithm optimization.
下载PDF
Comparative Assessment of Impacts of Future Climate Change on Runoff in Upper Daqinghe Basin,China
17
作者 INGABIRE Romaine CHANG Yuru +3 位作者 LIU Xia CAO Bo UMUGWANEZA Adeline SHEN Yanjun 《Chinese Geographical Science》 SCIE CSCD 2024年第3期564-578,共15页
Assessing runoff changes is of great importance especially its responses to the projected future climate change on local scale basins because such analyses are generally done on global and regional scales which may le... Assessing runoff changes is of great importance especially its responses to the projected future climate change on local scale basins because such analyses are generally done on global and regional scales which may lead to generalized conclusions rather than specific ones.Climate change affected the runoff variation in the past in the upper Daqinghe Basin,however,the climate was mainly considered uncertain and still needs further studies,especially its future impacts on runoff for better water resources management and planning.Integrated with a set of climate simulations,a daily conceptual hydrological model(MIKE11-NAM)was applied to assess the impact of climate change on runoff conditions in the Daomaguan,Fuping and Zijingguan basins in the upper Daqinghe Basin.Historical hydrological data(2008–2017)were used to evaluate the applicability of the MIKE11-NAM model.After bias correction,future projected climate change and its impacts on runoff(2025–2054)were analysed and compared to the baseline period(1985–2014)under three shared social economic pathways(SSP1-2.6,SSP2-4.5,and SSP5-8.5)scenarios from Coupled Model Intercomparison Project Phase 6(CMIP6)simulations.The MIKE-11 NAM model was applicable in all three Basins,with both R^(2)and Nash-Sutcliffe Efficiency coefficients greater than 0.6 at daily scale for both calibration(2009–2011)and validation(2012–2017)periods,respectively.Although uncertainties remain,temperature and precipitation are projected to increase compared to the baseline where higher increases in precipitation and temperature are projected to occur under SSP2-4.5 and SSP5-8.5 scenarios,respectively in all the basins.Precipitation changes will range between 12%–19%whereas temperature change will be 2.0℃–2.5℃ under the SSP2-4.5 and SSP5-8.5 scenarios,respectively.In addition,higher warming is projected to occur in colder months than in warmer months.Overall,the runoff of these three basins is projected to respond to projected climate changes differently because runoff is projected to only increase in the Fuping basin under SSP2-4.5 whereas decreases in both Daomaguan and Zijingguan Basins under all scenarios.This study’s findings could be important when setting mitigation strategies for climate change and water resources management. 展开更多
关键词 RUNOFF climate change MIKE11-NAM model Coupled Model Intercomparison project phase 6(CMIP6) upper Daqinghe Basin China
下载PDF
A CMIP6-based assessment of regional climate change in the Chinese Tianshan Mountains
18
作者 LIU Xinyu LI Xuemei +2 位作者 ZHANG Zhengrong ZHAO Kaixin LI Lanhai 《Journal of Arid Land》 SCIE CSCD 2024年第2期195-219,共25页
Climate warming profoundly affects hydrological changes,agricultural production,and human society.Arid and semi-arid areas of China are currently displaying a marked trend of warming and wetting.The Chinese Tianshan M... Climate warming profoundly affects hydrological changes,agricultural production,and human society.Arid and semi-arid areas of China are currently displaying a marked trend of warming and wetting.The Chinese Tianshan Mountains(CTM)have a high climate sensitivity,rendering the region particularly vulnerable to the effects of climate warming.In this study,we used monthly average temperature and monthly precipitation data from the CN05.1 gridded dataset(1961-2014)and 24 global climate models(GCMs)of the Coupled Model Intercomparison Project Phase 6(CMIP6)to assess the applicability of the CMIP6 GCMs in the CTM at the regional scale.Based on this,we conducted a systematic review of the interannual trends,dry-wet transitions(based on the standardized precipitation index(SPI)),and spatial distribution patterns of climate change in the CTM during 1961-2014.We further projected future temperature and precipitation changes over three terms(near-term(2021-2040),mid-term(2041-2060),and long-term(2081-2100))relative to the historical period(1961-2014)under four shared socio-economic pathway(SSP)scenarios(i.e.,SSP1-2.6,SSP2-4.5,SSP3-7.0,and SSP5-8.5).It was found that the CTM had experienced significant warming and wetting from 1961 to 2014,and will also experience warming in the future(2021-2100).Substantial warming in 1997 was captured by both the CN05.1 derived from interpolating meteorological station data and the multi-model ensemble(MME)from the CMIP6 GCMs.The MME simulation results indicated an apparent wetting in 2008,which occurred later than the wetting observed from the CN05.1 in 1989.The GCMs generally underestimated spring temperature and overestimated both winter temperature and spring precipitation in the CTM.Warming and wetting are more rapid in the northern part of the CTM.By the end of the 21st century,all the four SSP scenarios project warmer and wetter conditions in the CTM with multiple dry-wet transitions.However,the rise in precipitation fails to counterbalance the drought induced by escalating temperature in the future,so the nature of the drought in the CTM will not change at all.Additionally,the projected summer precipitation shows negative correlation with the radiative forcing.This study holds practical implications for the awareness of climate change and subsequent research in the CTM. 展开更多
关键词 climate change Coupled Model Intercomparison project phase 6(CMIP6) global climate models(GCMs) shared socio-economic pathway(SSP)scenarios standardized precipitation index(SPI) Chinese Tianshan Mountains
下载PDF
CMIP 6 models simulation of the connection between North/South Pacific Meridional Mode and ENSO
19
作者 Yunlong LU Junqiao FENG Dunxin HU 《Journal of Oceanology and Limnology》 SCIE CAS CSCD 2024年第2期439-453,共15页
The subtropical North and South Pacific Meridional Modes(NPMM and SPMM)are well known precursors of El Niño-Southern Oscillation(ENSO).However,relationship between them is not constant.In the early 1980,the relat... The subtropical North and South Pacific Meridional Modes(NPMM and SPMM)are well known precursors of El Niño-Southern Oscillation(ENSO).However,relationship between them is not constant.In the early 1980,the relationship experienced an interdecadal transition.Changes in this connection can be attributed mainly to the phase change of the Pacific decadal oscillation(PDO).During the positive phase of PDO,a shallower thermocline in the central Pacific is responsible for the stronger trade wind charging(TWC)mechanism,which leads to a stronger equatorial subsurface temperature evolution.This dynamic process strengthens the connection between NPMM and ENSO.Associated with the negative phase of PDO,a shallower thermocline over southeastern Pacific allows an enhanced wind-evaporation-SST(WES)feedback,strengthening the connection between SPMM and ENSO.Using 35 Coupled Model Intercomparison Project Phase 6(CMIP6)models,we examined the NPMM/SPMM performance and its connection with ENSO in the historical runs.The great majority of CMIP6 models can reproduce the pattern of NPMM and SPMM well,but they reveal discrepant ENSO and NPMM/SPMM relationship.The intermodal uncertainty for the connection of NPMM-ENSO is due to different TWC mechanism.A stronger TWC mechanism will enhance NPMM forcing.For SPMM,few models can simulate a good relationship with ENSO.The intermodel spread in the relationship of SPMM and ENSO owing to SST bias in the southeastern Pacific,as WES feedback is stronger when the southeastern Pacific is warmer. 展开更多
关键词 North and South Pacific Meridional Modes(NPMM and SPMM) El Niño-Southern Oscillation(ENSO) Pacific decadal oscillation(PDO) Coupled Model Intercomparison project phase 6(CMIP6)
下载PDF
基于相位补偿核的GNSS-SAR改进后向投影成像算法
20
作者 周鹏 马明玉 +2 位作者 张晰 张振华 张杰 《雷达科学与技术》 北大核心 2024年第3期326-333,340,共9页
在利用全球导航卫星系统反射信号(GNSS-R)的无源合成孔径雷达体制中,目前常采用后向投影算法进行成像处理,但该算法逐点精确聚焦的处理过程使得算法的运算量大。针对上述问题,提出了一种数据分块和构造相位补偿核的改进后向投影算法。... 在利用全球导航卫星系统反射信号(GNSS-R)的无源合成孔径雷达体制中,目前常采用后向投影算法进行成像处理,但该算法逐点精确聚焦的处理过程使得算法的运算量大。针对上述问题,提出了一种数据分块和构造相位补偿核的改进后向投影算法。改进算法对回波矩阵进行分块,将目标区域成像网格点的最长延迟距离与最短延迟距离等间隔划分,建立相位补偿核,通过距离向搜索操作得到各网格点的相位补偿结果,在方位向相干叠加形成子图,递归合并得到最终图像。定量分析得出,改进算法可有效降低运算量,同时节省内存。仿真结果验证了所提算法的有效性。 展开更多
关键词 全球导航卫星系统反射信号 合成孔径雷达 后向投影算法 相位补偿核
下载PDF
上一页 1 2 56 下一页 到第
使用帮助 返回顶部