The initial shape of the secondary arc considerably influences its subsequent shape.To establish the model for the arcing time of the secondary arc and modify the single-phase reclosing sequence,theoretical and experi...The initial shape of the secondary arc considerably influences its subsequent shape.To establish the model for the arcing time of the secondary arc and modify the single-phase reclosing sequence,theoretical and experimental analysis of the evolution process of the short-circuit arc to the secondary arc is critical.In this study,an improved charge simulation method was used to develop the internal-space electric-field model of the short-circuit arc.The intensity of the electric field was used as an independent variable to describe the initial shape of the secondary arc.A secondary arc evolution model was developed based on this model.Moreover,the accuracy of the model was evaluated by comparison with physical experimental results.When the secondary arc current increased,the arcing time and dispersion increased.There is an overall trend of increasing arc length with increasing arcing time.Nevertheless,there is a reduction in arc length during arc ignition due to short circuits between the arc columns.Furthermore,the arcing time decreased in the range of 0°-90°as the angle between the wind direction and the x-axis increased.This work investigated the method by which short-circuit arcs evolve into secondary arcs.The results can be used to develop the secondary arc evolution model and to provide both a technical and theoretical basis for secondary arc suppression.展开更多
Aiming at the problemthat the traditional short-circuit current calculationmethod is not applicable to Distributed Generation(DG)accessing the distribution network,the paper proposes a short-circuit current partitioni...Aiming at the problemthat the traditional short-circuit current calculationmethod is not applicable to Distributed Generation(DG)accessing the distribution network,the paper proposes a short-circuit current partitioning calculation method considering the degree of voltage drop at the grid-connected point of DG.Firstly,the output characteristics of DG in the process of low voltage ride through are analyzed,and the equivalent output model of DG in the fault state is obtained.Secondly,by studying the network voltage distribution law after fault in distribution networks under different DG penetration rates,the degree of voltage drop at the grid-connected point of DG is used as a partition index to partition the distribution network.Then,iterative computation is performed within each partition,and data are transferred between partitions through split nodes to realize the fast partition calculation of short-circuit current for high proportion DG access to distribution network,which solves the problems of long iteration time and large calculation error of traditional short-circuit current.Finally,a 62-node real distribution network model containing a high proportion of DG access is constructed onMATLAB/Simulink,and the simulation verifies the effectiveness of the short-circuit current partitioning calculation method proposed in the paper,and its calculation speed is improved by 48.35%compared with the global iteration method.展开更多
In gas metal arc welding(GMAW)process,the short-circuit transition was the most typical transition observed in molten metal droplets.This paper used orthogonal tests to explore the coupling effect law of welding proce...In gas metal arc welding(GMAW)process,the short-circuit transition was the most typical transition observed in molten metal droplets.This paper used orthogonal tests to explore the coupling effect law of welding process parameters on the quality of weld forming under short-circuit transition,the design of 3 factors and 3 levels of a total of 9 groups of orthogonal tests,welding current,welding voltage,welding speed as input parameters:effective area ratio,humps,actual linear power density,aspect ratio,Vickers hardness as output paramet-ers(response targets).Using range analysis and trend charts,we can visually depict the relationship between input parameters and a single output parameter,ultimately determining the optimal process parameters that impact the single output index.Then combined with gray the-ory to transform the three response targets into a single gray relational grade(GRG)for analysis,the optimal combination of the weld mor-phology parameters as follows:welding current 100 A,welding voltage 25 V,welding speed 30 cm/min.Finally,validation experiments were conducted,and the results showed that the error between the gray relational grade and the predicted value was 2.74%.It was observed that the effective area ratio of the response target significantly improved,validating the reliability of the orthogonal gray relational method.展开更多
Base on the arc phase and short-circuit phase and their relationship, the paper considers the changes of the extension of wire, the arc length, liquid bridge resistance and mass of liquid bridge, combines the improved...Base on the arc phase and short-circuit phase and their relationship, the paper considers the changes of the extension of wire, the arc length, liquid bridge resistance and mass of liquid bridge, combines the improved “mass-spring” model with the loop model of welding power system, puts forward the critical judgment condition of droplet transition, and establishes a more accurate dynamic model for describing the short-circuit transition process. The dynamic changes of short-circuit transfer frequency, welding current and voltage, contact droplet and residual droplet equivalent radius and droplet equivalent radius at different wire feeding speeds were calculated and analyzed, and compared with the experimental results. It shows that the fluctuation of droplet displacement, velocity and wire extension length at the optimal arc starting point is the smallest. The smaller the initial liquid bridge curvature radius is, the better the stability of short-circuit transfer is.展开更多
Inter-turn fault is a serious stator winding short-circuit fault of permanent magnet synchronous machine(PMSM). Once it occurs, it produces a huge short-circuit current that poses a great risk to the safe operation of...Inter-turn fault is a serious stator winding short-circuit fault of permanent magnet synchronous machine(PMSM). Once it occurs, it produces a huge short-circuit current that poses a great risk to the safe operation of PMSM. Thus, an inter-turn short-circuit fault(ITSCF) diagnosis method based on high frequency(HF) voltage residual is proposed in this paper with proper HF signal injection. First, the analytical models of PMSM after the ITSCF are deduced. Based on the model, the voltage residual at low frequency(LF) and HF can be obtained. It is revealed that the HF voltage residual has a stronger ITSCF detection capability compared to the LF voltage residual. To obtain optimal fault signature, a 3-phase symmetrical HF voltage is injected into the machine drive system, and the HF voltage residuals are extracted. The fault indicator is defined as the standard deviation of the 3-phase HF voltage residuals. The effectiveness of the proposed ITSCF diagnosis method is verified by experiments on a triple 3-phase PMSM. It is worth noting that no extra hardware equipment is required to implement the proposed method.展开更多
Based on the phase space reconstruction of welding current in short-circuiting transfer arc welding under carbon dioxide, the approximate entropy of welding current and its standard deviation have been calculated and ...Based on the phase space reconstruction of welding current in short-circuiting transfer arc welding under carbon dioxide, the approximate entropy of welding current and its standard deviation have been calculated and analyzed at different welding speeds and different electrode extensions respectively. The experimental and calculated results show that at a certain arc voltage, wire feeding rate and gas flow rate, welding speed and electrode extension have significant effects not only on the approximate entropy of welding current, but also on the stability of welding process. Further analysis proves that when the welding speed and electrode extension are in an appropriate range respectively, the welding current approximate entropy attains maximum and its standard deviation minimum. Just under such circumstances, the welding process is in the most stable state.展开更多
Half-wavelength AC transmission(HWACT) is an ultra-long distance AC transmission technology, whose electrical distance is close to half-wavelength at the system power frequency. It is very important for the constructi...Half-wavelength AC transmission(HWACT) is an ultra-long distance AC transmission technology, whose electrical distance is close to half-wavelength at the system power frequency. It is very important for the construction and operation of HWACT to analyze its fault features and corresponding protection technology. In this paper, the steady-state voltage and current characteristics of the bus bar and fault point and the steady-state overvoltage distribution along the line will be analyzed when a three-phase symmetrical short-circuit fault occurs on an HWACT line. On this basis, the threephase fault characteristics for longer transmission lines are also studied.展开更多
A fault-tolerant permanent-magnet vernier(FT-PMV)machine incorporates the merits of high fault-tolerant capability and high torque density.In this paper,a remedial phase-angle control(RPAC)strategy is proposed for a f...A fault-tolerant permanent-magnet vernier(FT-PMV)machine incorporates the merits of high fault-tolerant capability and high torque density.In this paper,a remedial phase-angle control(RPAC)strategy is proposed for a five-phase FT-PMV machine with short-circuit fault.Firstly,the proposed strategy can reduce the amount of unknown quantities by structuring the phase-angles of the normal phases.It can simplify the calculation of the remedial currents.Then,in order to obtain the desired torque,only the amplitudes of the remedial currents need to be calculated.Based on the principle of instantaneous electrical input power and mechanical output power balance condition,the real components are used to maintain the torque capability,while the reactive components are limited zero to minimize the torque ripple.Both simulations and experiments are presented to verify the proposed RPAC strategy.展开更多
A simulation model is introduced about the non-linearity process of short-circuiting transfer in CO2 arc welding for displaying the interaction between the inverter power source and welding arc under waveform control....A simulation model is introduced about the non-linearity process of short-circuiting transfer in CO2 arc welding for displaying the interaction between the inverter power source and welding arc under waveform control. In the simulation model, the feedback signals of current and voltage are taken respectively at the different phase in a short circuit periodic time and applied to the PWM (pulse width modulation) module in a model of inverter power source to control the output of power source. The simulation operation about the dynamic process of CO2 short-circuiting transfer welding is implemented on the founded simulation model with a peak arc current of 400 A and a peak voltage of 35 V, producing the dynamic arc waveforms which can embody the effect of inverter harmonic wave. The simulating waveforms are close to that of welding experiments.展开更多
In this paper a short-circuit computation(SCC) procedure for large-scale distribution systems with high penetration of distributed generators based on contemporary technologies is proposed. The procedure is suitable f...In this paper a short-circuit computation(SCC) procedure for large-scale distribution systems with high penetration of distributed generators based on contemporary technologies is proposed. The procedure is suitable for real-time calculations.Modeling of modern distributed generators differs from the modeling of traditional synchronous and induction generators.Hence, SCC procedures found on the presumption of distribution systems with only traditional generators are not suitable in nowadays systems. In the work presented in this paper, for computation of the state of the system with short-circuit, the improved backward/forward sweep(IBFS) procedure is used.Computation results show that the IBFS procedure is much more robust than previous SCC procedures, as it takes into account all distribution system elements, including modern distributed generators.展开更多
The behavior of matrix converter(MC) drive systems under the condition of MC short-circuit faults is comprehensively investigated. Two isolation strategies using semiconductors and high speed fuses(HSFs) for MC short-...The behavior of matrix converter(MC) drive systems under the condition of MC short-circuit faults is comprehensively investigated. Two isolation strategies using semiconductors and high speed fuses(HSFs) for MC short-circuit faults are examined and their performances are compared. The behavior of MC drive systems during the fuse action time under different operating conditions is explored. The feasibility of fault-tolerant operation during the fuse action time is also studied. The basic selection laws for the HSFs and the requirements for the passive components of the MC drive system from the point view of short-circuit faults are also discussed. Simulation results are used to demonstrate the feasibility of the proposed isolation strategies.展开更多
An intelligent fuzzy c-means system for process monitoring and recognition of process disturbances during short- circuiting gas metal arc welding (GMAW) is introduced in this paper. The raw measured and statisticall...An intelligent fuzzy c-means system for process monitoring and recognition of process disturbances during short- circuiting gas metal arc welding (GMAW) is introduced in this paper. The raw measured and statistically test data of probability density distribution ( PDD ) and class frequency distribution ( CFD ) of welding electrical parameters are further processed into a 7-dimensional array which is designed to describe various welding conditions, and is employed as input vector of the intelligent fuzzy c-means system. The fuzzy c-means system is used to conduct process monitoring and automatic recognition. The correct recognition rate of 24 test data under 8 kinds of welding condition is 92%.展开更多
After cumulative discharge of gas discharge tube(GDT),it is easy to form a short circuit pathway between the two electrodes,which increases the failure risk and causes severe influences on the protected object.To redu...After cumulative discharge of gas discharge tube(GDT),it is easy to form a short circuit pathway between the two electrodes,which increases the failure risk and causes severe influences on the protected object.To reduce the failure risk of GDT and improve cumulative discharge times before failure,this work aims to suppress the formation of two short-circuit pathways by optimizing the tube wall structure,the electrode materials and the electrode structure.A total of five improved GDT samples are designed by focusing on the insulation resistance change that occurs after the improvement;then,by combining these designs with the microscopic morphology changes inside the cavity and the differences in deposition composition,the reasons for the differences in the GDT failure risk are also analyzed.The experimental results show that compared with GDT of traditional structure and material,the method of adding grooves at both ends of the tube wall can effectively block the deposition pathway of the tube wall,and the cumulative discharge time before device failure is increased by 149%.On this basis,when the iron-nickel electrode is replaced with a tungsten-copper electrode,the difference in the electrode’s surface splash characteristics further extends the discharge time before failure by 183%.In addition,when compared with the traditional electrode structure,the method of adding an annular structure at the electrode edge to block the splashing pathway for the particles on the electrode surface shows no positive effect,and the cumulative discharge time before the failure of the two structures is reduced by 22.8%and 49.7%,respectively.Among these improved structures,the samples with grooves at both ends of the tube wall and tungsten-copper as their electrode material have the lowest failure risk.展开更多
The ?method is used in this paper to calculate the leakage magnetic field of SSZ11-50000/110 Power transformer, and by which the structures’ influences to the main leakage flux are analyzed. Through the combination o...The ?method is used in this paper to calculate the leakage magnetic field of SSZ11-50000/110 Power transformer, and by which the structures’ influences to the main leakage flux are analyzed. Through the combination of the product and TEAM Problem 21B, the surface impedance method shows its great advantage in the calculation of eddy current loss.展开更多
A novel 1200 V SiC super-junction(SJ)MOSFET with a partially widened pillar structure is proposed and investi-gated by using the two-dimensional numerical simulation tool.Based on the SiC SJ MOSFET structure,a partial...A novel 1200 V SiC super-junction(SJ)MOSFET with a partially widened pillar structure is proposed and investi-gated by using the two-dimensional numerical simulation tool.Based on the SiC SJ MOSFET structure,a partially widened P-region is added at the SJ pillar region to improve the short-circuit(SC)ability.After investigating the position and doping concentration of the widened P-region,an optimal structure is determined.From the simulation results,the SC withstand times(SCWTs)of the conventional trench MOSFET(CT-MOSFET),the SJ MOSFET,and the proposed structure at 800 V DC bus voltage are 15μs,17μs,and 24μs,respectively.The SCWTs of the proposed structure are increased by 60%and 41.2%in comparison with that of the other two structures.The main reason for the proposed structure with an enhanced SC capability is related to the effective suppression of saturation current at the high DC bias conditions by using a modu-lated P-pillar region.Meanwhile,a good Baliga's FOM(BV^(2)/R_(on))also can be achieved in the proposed structure due to the advantage of the SJ structure.In addition,the fabrication technology of the proposed structure is compatible with the standard epitaxy growth method used in the SJ MOSFET.As a result,the SJ structure with this feasible optimization skill presents an effect on improving the SC reliability of the SiC SJ MOSFET without the degeneration of the Baliga's FOM.展开更多
It is difficult to accurately calculate the short-circuit impedance, due to the complexity of axial dual-low-voltage split-winding transformer winding structure. In this paper, firstly, the leakage magnetic field and ...It is difficult to accurately calculate the short-circuit impedance, due to the complexity of axial dual-low-voltage split-winding transformer winding structure. In this paper, firstly, the leakage magnetic field and short-circuit impedance model of axial dual-low-voltage split-winding transformer is established, and then the 2D and 3D leakage magnetic field are analyzed. Secondly, the short-circuit impedance and split parallel branch current distribution in different working conditions are calculated, which is based on field-circuit coupled method. At last, effectiveness and feasibility of the proposed model is verified by comparison between experiment, analysis and simulation. The results showed that the 3D analysis method is a better approach to calculate the short-circuit impedance, since its analytical value is more closer to the experimental value compared with the 2D analysis results, the finite element method calculation error is less than 2%, while the leakage flux method maximum error is 7.2%.展开更多
When using the ATP-EMTP software to simulate the electromagnetic transient of local line or nearby line for a large area power grid, it is necessary to divide the area grid into internal network and external network s...When using the ATP-EMTP software to simulate the electromagnetic transient of local line or nearby line for a large area power grid, it is necessary to divide the area grid into internal network and external network so as to make the external network simple for the restriction of the simulation calculation scale of software. Based on the existing equivalence method, in this paper we proposed a practical equivalent method using the short-circuit calculation program of PSASP. In this way, we completed the equivalence of northwest power grid operating at the large mode of summer 2016. By comparing the power flow and the characteristics of short-circuit in the system before and after the equivalence, this equivalent method is proved to be correct.展开更多
Analysis of the short-circuit characteristics of SiC metal-oxide-semiconductor field-effect transistors(MOSFETs)is very important for their practical application.This paper studies the SiC MOSFET short-circuit charact...Analysis of the short-circuit characteristics of SiC metal-oxide-semiconductor field-effect transistors(MOSFETs)is very important for their practical application.This paper studies the SiC MOSFET short-circuit characteristics with an improved test setup under different conditions.A high-current Si insulated gate bipolar transistor is used as a circuit breaker in the test circuit rather than the usual short-circuit test conducted without a circuit breaker.The test platform with a circuit breaker does not influence the calculation results regarding the shortcircuitwithstand time and energy,but the SiCMOSFETwill switch off after failure in a very short time.In addition,the degree of failure will be limited and confined to a small area,such that the damage to the chip will be clearly observable,which is significant for short-circuit failure analysis.展开更多
We review the short-circuit testing of distribution and power transformers, and include a list of 110-220kV power transformers tested up to February 2002.
System control and safety reliability are important links of the marine DC (Direct Current) power system. The simulationmodel is built by Matlab/Simulink, the battery and super-capacitor are supplied to the system thr...System control and safety reliability are important links of the marine DC (Direct Current) power system. The simulationmodel is built by Matlab/Simulink, the battery and super-capacitor are supplied to the system through a three-phase interleaved DC/DCconverter, the fuse and disconnector switch combination are used as the protection device, and the short-circuit point is set betweeneach branch and the DC distribution board, performing short-circuit simulation. This paper also proposes a short-circuit calculationmethod for super-capacitors based on the simplified model of series RC (Resistors & Capacitors), and verifies its correctness throughsimulation data. The results show that the introduction of a three-phase interleaved DC/DC converter reduces the current ripple andmakes the system control more convenient;short-circuit calculation and simulation have determined the short-circuit withstandcapability of the DC distribution board, and verified the feasibility of the fuse selection method and the short-circuit calculation methodof the super-capacitor. This provides reliable verification for the application and calculation of the actual project.展开更多
基金supported by National Natural Science Foundation of China(Nos.92066108 and 51277061)。
文摘The initial shape of the secondary arc considerably influences its subsequent shape.To establish the model for the arcing time of the secondary arc and modify the single-phase reclosing sequence,theoretical and experimental analysis of the evolution process of the short-circuit arc to the secondary arc is critical.In this study,an improved charge simulation method was used to develop the internal-space electric-field model of the short-circuit arc.The intensity of the electric field was used as an independent variable to describe the initial shape of the secondary arc.A secondary arc evolution model was developed based on this model.Moreover,the accuracy of the model was evaluated by comparison with physical experimental results.When the secondary arc current increased,the arcing time and dispersion increased.There is an overall trend of increasing arc length with increasing arcing time.Nevertheless,there is a reduction in arc length during arc ignition due to short circuits between the arc columns.Furthermore,the arcing time decreased in the range of 0°-90°as the angle between the wind direction and the x-axis increased.This work investigated the method by which short-circuit arcs evolve into secondary arcs.The results can be used to develop the secondary arc evolution model and to provide both a technical and theoretical basis for secondary arc suppression.
基金funded by the National Natural Science Foundation of China(52077004)Anhui Electric Power Company of the State Grid(52120021N00L).
文摘Aiming at the problemthat the traditional short-circuit current calculationmethod is not applicable to Distributed Generation(DG)accessing the distribution network,the paper proposes a short-circuit current partitioning calculation method considering the degree of voltage drop at the grid-connected point of DG.Firstly,the output characteristics of DG in the process of low voltage ride through are analyzed,and the equivalent output model of DG in the fault state is obtained.Secondly,by studying the network voltage distribution law after fault in distribution networks under different DG penetration rates,the degree of voltage drop at the grid-connected point of DG is used as a partition index to partition the distribution network.Then,iterative computation is performed within each partition,and data are transferred between partitions through split nodes to realize the fast partition calculation of short-circuit current for high proportion DG access to distribution network,which solves the problems of long iteration time and large calculation error of traditional short-circuit current.Finally,a 62-node real distribution network model containing a high proportion of DG access is constructed onMATLAB/Simulink,and the simulation verifies the effectiveness of the short-circuit current partitioning calculation method proposed in the paper,and its calculation speed is improved by 48.35%compared with the global iteration method.
基金supported by Major Special Projects of Science and Technology in Fujian Province,(Grant No.2020HZ03018)Natural Science Foundation of Fujian Province(Grant No.2020J01873).
文摘In gas metal arc welding(GMAW)process,the short-circuit transition was the most typical transition observed in molten metal droplets.This paper used orthogonal tests to explore the coupling effect law of welding process parameters on the quality of weld forming under short-circuit transition,the design of 3 factors and 3 levels of a total of 9 groups of orthogonal tests,welding current,welding voltage,welding speed as input parameters:effective area ratio,humps,actual linear power density,aspect ratio,Vickers hardness as output paramet-ers(response targets).Using range analysis and trend charts,we can visually depict the relationship between input parameters and a single output parameter,ultimately determining the optimal process parameters that impact the single output index.Then combined with gray the-ory to transform the three response targets into a single gray relational grade(GRG)for analysis,the optimal combination of the weld mor-phology parameters as follows:welding current 100 A,welding voltage 25 V,welding speed 30 cm/min.Finally,validation experiments were conducted,and the results showed that the error between the gray relational grade and the predicted value was 2.74%.It was observed that the effective area ratio of the response target significantly improved,validating the reliability of the orthogonal gray relational method.
基金the Natural Science Foundation Project of Guizhou Province([2019]1069)Guizhou Province Cultivation Project([2017]5788-42)+1 种基金Guizhou Province Science and Technology Support Plan General Project([2022]051)Guizhou University Talent Introduction Plan((2017)28).
文摘Base on the arc phase and short-circuit phase and their relationship, the paper considers the changes of the extension of wire, the arc length, liquid bridge resistance and mass of liquid bridge, combines the improved “mass-spring” model with the loop model of welding power system, puts forward the critical judgment condition of droplet transition, and establishes a more accurate dynamic model for describing the short-circuit transition process. The dynamic changes of short-circuit transfer frequency, welding current and voltage, contact droplet and residual droplet equivalent radius and droplet equivalent radius at different wire feeding speeds were calculated and analyzed, and compared with the experimental results. It shows that the fluctuation of droplet displacement, velocity and wire extension length at the optimal arc starting point is the smallest. The smaller the initial liquid bridge curvature radius is, the better the stability of short-circuit transfer is.
基金supported in part by the Jiangsu Carbon Peak Carbon Neutralization Science and Technology Innovation Special Fund under Grant BE2022032-1National Natural Science Foundation of China under Grant 52277035, Grant 51937006 and Grant 51907028the “SEU Zhishan Young Scholars” Program of Southeast University。
文摘Inter-turn fault is a serious stator winding short-circuit fault of permanent magnet synchronous machine(PMSM). Once it occurs, it produces a huge short-circuit current that poses a great risk to the safe operation of PMSM. Thus, an inter-turn short-circuit fault(ITSCF) diagnosis method based on high frequency(HF) voltage residual is proposed in this paper with proper HF signal injection. First, the analytical models of PMSM after the ITSCF are deduced. Based on the model, the voltage residual at low frequency(LF) and HF can be obtained. It is revealed that the HF voltage residual has a stronger ITSCF detection capability compared to the LF voltage residual. To obtain optimal fault signature, a 3-phase symmetrical HF voltage is injected into the machine drive system, and the HF voltage residuals are extracted. The fault indicator is defined as the standard deviation of the 3-phase HF voltage residuals. The effectiveness of the proposed ITSCF diagnosis method is verified by experiments on a triple 3-phase PMSM. It is worth noting that no extra hardware equipment is required to implement the proposed method.
基金Supported by Project of the National Natural Science Foundation of China(50375053,50575077)
文摘Based on the phase space reconstruction of welding current in short-circuiting transfer arc welding under carbon dioxide, the approximate entropy of welding current and its standard deviation have been calculated and analyzed at different welding speeds and different electrode extensions respectively. The experimental and calculated results show that at a certain arc voltage, wire feeding rate and gas flow rate, welding speed and electrode extension have significant effects not only on the approximate entropy of welding current, but also on the stability of welding process. Further analysis proves that when the welding speed and electrode extension are in an appropriate range respectively, the welding current approximate entropy attains maximum and its standard deviation minimum. Just under such circumstances, the welding process is in the most stable state.
基金supported by National Key Research and Development Program of China(2016YFB0900100)
文摘Half-wavelength AC transmission(HWACT) is an ultra-long distance AC transmission technology, whose electrical distance is close to half-wavelength at the system power frequency. It is very important for the construction and operation of HWACT to analyze its fault features and corresponding protection technology. In this paper, the steady-state voltage and current characteristics of the bus bar and fault point and the steady-state overvoltage distribution along the line will be analyzed when a three-phase symmetrical short-circuit fault occurs on an HWACT line. On this basis, the threephase fault characteristics for longer transmission lines are also studied.
基金This work was supported by the National Natural Science Foundation of China(51422702)by the by the Qing Lan Project,and by the Priority Academic Program Development of Jiangsu Higher Education Institutions.
文摘A fault-tolerant permanent-magnet vernier(FT-PMV)machine incorporates the merits of high fault-tolerant capability and high torque density.In this paper,a remedial phase-angle control(RPAC)strategy is proposed for a five-phase FT-PMV machine with short-circuit fault.Firstly,the proposed strategy can reduce the amount of unknown quantities by structuring the phase-angles of the normal phases.It can simplify the calculation of the remedial currents.Then,in order to obtain the desired torque,only the amplitudes of the remedial currents need to be calculated.Based on the principle of instantaneous electrical input power and mechanical output power balance condition,the real components are used to maintain the torque capability,while the reactive components are limited zero to minimize the torque ripple.Both simulations and experiments are presented to verify the proposed RPAC strategy.
基金Supported by National Natural Science Foundation of China ( No59975068)Natural Science Foundation of Tianjin ( No993602911)
文摘A simulation model is introduced about the non-linearity process of short-circuiting transfer in CO2 arc welding for displaying the interaction between the inverter power source and welding arc under waveform control. In the simulation model, the feedback signals of current and voltage are taken respectively at the different phase in a short circuit periodic time and applied to the PWM (pulse width modulation) module in a model of inverter power source to control the output of power source. The simulation operation about the dynamic process of CO2 short-circuiting transfer welding is implemented on the founded simulation model with a peak arc current of 400 A and a peak voltage of 35 V, producing the dynamic arc waveforms which can embody the effect of inverter harmonic wave. The simulating waveforms are close to that of welding experiments.
文摘In this paper a short-circuit computation(SCC) procedure for large-scale distribution systems with high penetration of distributed generators based on contemporary technologies is proposed. The procedure is suitable for real-time calculations.Modeling of modern distributed generators differs from the modeling of traditional synchronous and induction generators.Hence, SCC procedures found on the presumption of distribution systems with only traditional generators are not suitable in nowadays systems. In the work presented in this paper, for computation of the state of the system with short-circuit, the improved backward/forward sweep(IBFS) procedure is used.Computation results show that the IBFS procedure is much more robust than previous SCC procedures, as it takes into account all distribution system elements, including modern distributed generators.
基金Project(50807002) supported by the National Natural Science Foundation of ChinaProject(SKLD10KM05) supported by Opening Fund of State Key Laboratory of Power System and Generation EquipmentsProject(201206025007) supported by the National Scholarship Fund,China
文摘The behavior of matrix converter(MC) drive systems under the condition of MC short-circuit faults is comprehensively investigated. Two isolation strategies using semiconductors and high speed fuses(HSFs) for MC short-circuit faults are examined and their performances are compared. The behavior of MC drive systems during the fuse action time under different operating conditions is explored. The feasibility of fault-tolerant operation during the fuse action time is also studied. The basic selection laws for the HSFs and the requirements for the passive components of the MC drive system from the point view of short-circuit faults are also discussed. Simulation results are used to demonstrate the feasibility of the proposed isolation strategies.
基金The authors are grateful to the financial support provided by the National Natural Science Foundation of China under grant No. 51005106, Research Fund for the Doctoral Program of Jiangsu Uni- versity of Science and Technology under grant No. 35060902, A Project Funded by the Priority Academic Program Development of Jiangsu Higher Education Institutions.
文摘An intelligent fuzzy c-means system for process monitoring and recognition of process disturbances during short- circuiting gas metal arc welding (GMAW) is introduced in this paper. The raw measured and statistically test data of probability density distribution ( PDD ) and class frequency distribution ( CFD ) of welding electrical parameters are further processed into a 7-dimensional array which is designed to describe various welding conditions, and is employed as input vector of the intelligent fuzzy c-means system. The fuzzy c-means system is used to conduct process monitoring and automatic recognition. The correct recognition rate of 24 test data under 8 kinds of welding condition is 92%.
基金supported by National Natural Science Foundation of China(No.U1834204)。
文摘After cumulative discharge of gas discharge tube(GDT),it is easy to form a short circuit pathway between the two electrodes,which increases the failure risk and causes severe influences on the protected object.To reduce the failure risk of GDT and improve cumulative discharge times before failure,this work aims to suppress the formation of two short-circuit pathways by optimizing the tube wall structure,the electrode materials and the electrode structure.A total of five improved GDT samples are designed by focusing on the insulation resistance change that occurs after the improvement;then,by combining these designs with the microscopic morphology changes inside the cavity and the differences in deposition composition,the reasons for the differences in the GDT failure risk are also analyzed.The experimental results show that compared with GDT of traditional structure and material,the method of adding grooves at both ends of the tube wall can effectively block the deposition pathway of the tube wall,and the cumulative discharge time before device failure is increased by 149%.On this basis,when the iron-nickel electrode is replaced with a tungsten-copper electrode,the difference in the electrode’s surface splash characteristics further extends the discharge time before failure by 183%.In addition,when compared with the traditional electrode structure,the method of adding an annular structure at the electrode edge to block the splashing pathway for the particles on the electrode surface shows no positive effect,and the cumulative discharge time before the failure of the two structures is reduced by 22.8%and 49.7%,respectively.Among these improved structures,the samples with grooves at both ends of the tube wall and tungsten-copper as their electrode material have the lowest failure risk.
文摘The ?method is used in this paper to calculate the leakage magnetic field of SSZ11-50000/110 Power transformer, and by which the structures’ influences to the main leakage flux are analyzed. Through the combination of the product and TEAM Problem 21B, the surface impedance method shows its great advantage in the calculation of eddy current loss.
基金Project supported by the Key Research and Development Program of Guangdong Province,China(Grant No.2019B090917010).
文摘A novel 1200 V SiC super-junction(SJ)MOSFET with a partially widened pillar structure is proposed and investi-gated by using the two-dimensional numerical simulation tool.Based on the SiC SJ MOSFET structure,a partially widened P-region is added at the SJ pillar region to improve the short-circuit(SC)ability.After investigating the position and doping concentration of the widened P-region,an optimal structure is determined.From the simulation results,the SC withstand times(SCWTs)of the conventional trench MOSFET(CT-MOSFET),the SJ MOSFET,and the proposed structure at 800 V DC bus voltage are 15μs,17μs,and 24μs,respectively.The SCWTs of the proposed structure are increased by 60%and 41.2%in comparison with that of the other two structures.The main reason for the proposed structure with an enhanced SC capability is related to the effective suppression of saturation current at the high DC bias conditions by using a modu-lated P-pillar region.Meanwhile,a good Baliga's FOM(BV^(2)/R_(on))also can be achieved in the proposed structure due to the advantage of the SJ structure.In addition,the fabrication technology of the proposed structure is compatible with the standard epitaxy growth method used in the SJ MOSFET.As a result,the SJ structure with this feasible optimization skill presents an effect on improving the SC reliability of the SiC SJ MOSFET without the degeneration of the Baliga's FOM.
文摘It is difficult to accurately calculate the short-circuit impedance, due to the complexity of axial dual-low-voltage split-winding transformer winding structure. In this paper, firstly, the leakage magnetic field and short-circuit impedance model of axial dual-low-voltage split-winding transformer is established, and then the 2D and 3D leakage magnetic field are analyzed. Secondly, the short-circuit impedance and split parallel branch current distribution in different working conditions are calculated, which is based on field-circuit coupled method. At last, effectiveness and feasibility of the proposed model is verified by comparison between experiment, analysis and simulation. The results showed that the 3D analysis method is a better approach to calculate the short-circuit impedance, since its analytical value is more closer to the experimental value compared with the 2D analysis results, the finite element method calculation error is less than 2%, while the leakage flux method maximum error is 7.2%.
文摘When using the ATP-EMTP software to simulate the electromagnetic transient of local line or nearby line for a large area power grid, it is necessary to divide the area grid into internal network and external network so as to make the external network simple for the restriction of the simulation calculation scale of software. Based on the existing equivalence method, in this paper we proposed a practical equivalent method using the short-circuit calculation program of PSASP. In this way, we completed the equivalence of northwest power grid operating at the large mode of summer 2016. By comparing the power flow and the characteristics of short-circuit in the system before and after the equivalence, this equivalent method is proved to be correct.
基金This work was supported by the Shenzhen Science and Technology Program[Grant No.KQTD2017033016491218].
文摘Analysis of the short-circuit characteristics of SiC metal-oxide-semiconductor field-effect transistors(MOSFETs)is very important for their practical application.This paper studies the SiC MOSFET short-circuit characteristics with an improved test setup under different conditions.A high-current Si insulated gate bipolar transistor is used as a circuit breaker in the test circuit rather than the usual short-circuit test conducted without a circuit breaker.The test platform with a circuit breaker does not influence the calculation results regarding the shortcircuitwithstand time and energy,but the SiCMOSFETwill switch off after failure in a very short time.In addition,the degree of failure will be limited and confined to a small area,such that the damage to the chip will be clearly observable,which is significant for short-circuit failure analysis.
文摘We review the short-circuit testing of distribution and power transformers, and include a list of 110-220kV power transformers tested up to February 2002.
文摘System control and safety reliability are important links of the marine DC (Direct Current) power system. The simulationmodel is built by Matlab/Simulink, the battery and super-capacitor are supplied to the system through a three-phase interleaved DC/DCconverter, the fuse and disconnector switch combination are used as the protection device, and the short-circuit point is set betweeneach branch and the DC distribution board, performing short-circuit simulation. This paper also proposes a short-circuit calculationmethod for super-capacitors based on the simplified model of series RC (Resistors & Capacitors), and verifies its correctness throughsimulation data. The results show that the introduction of a three-phase interleaved DC/DC converter reduces the current ripple andmakes the system control more convenient;short-circuit calculation and simulation have determined the short-circuit withstandcapability of the DC distribution board, and verified the feasibility of the fuse selection method and the short-circuit calculation methodof the super-capacitor. This provides reliable verification for the application and calculation of the actual project.