The safety factor of roof under deep high stress is a quantitative index for evaluating roof stability.Based on the failure mode of surrounding rock of stope roof,the mechanics model of goaf roof is constructed,and th...The safety factor of roof under deep high stress is a quantitative index for evaluating roof stability.Based on the failure mode of surrounding rock of stope roof,the mechanics model of goaf roof is constructed,and the internal force of roof is deduced by the theory of hingeless arch.The calculation method of roof safety factor(K)under the environment of deep mining is proposed in view of compression failure and shear failure of roof.The calculation formulas of shear safety factor(K1),compression safety factor(K2)and comprehensive safety factor(K)of roof are given.The influence of stope span and roof thickness on roof stability is considered in this paper.The results show that when the roof thickness remains constant,the roof safety factor decreases with the increasing of the stope span;when the stope span remains constant,the roof safety factor increases with the increasing of the roof thickness.The deep mining example shows that when the stope span is 30 m and the roof thickness is 10 m,the roof comprehensive safety factor is 1.12,which indicates the roof is in a stable state.展开更多
Study on efficient mining of the steep incline and fractured ore-bodies in Yongshaba mine of Guizhou Kailin Group shows that ore-body is fractured and difficult to support the roadways in-vein.After research of the ac...Study on efficient mining of the steep incline and fractured ore-bodies in Yongshaba mine of Guizhou Kailin Group shows that ore-body is fractured and difficult to support the roadways in-vein.After research of the actual conditions about the ore-bodies,we have made the initial decision to adopt reconstruction of roof downward sublevel cut-and-fill mining.The men work safely under the false roof supporting the top plate.However,the difficult problem is how to determine the strength of the false roof.In this case,the method based on reliability theory has been put forward.Combined with elastic mechanics and field practice,when practical value of reliable probability is 90 %,the value of the false roof strength has been calculated,and the study shows that stope span greatly influences the false roof strength.With the strength of artificial roof,the reasonable reinforcement design ensures the false roof which can supply the demand of strength under large span and load.展开更多
基金Projects(51974135,51704094)supported by the National Natural Science Foundation of ChinaProject(2016YFC0600802)supported by the National Key Research and Development Program of ChinaProject(2020M672226)supported by the China Postdoctoral Science Foundation。
文摘The safety factor of roof under deep high stress is a quantitative index for evaluating roof stability.Based on the failure mode of surrounding rock of stope roof,the mechanics model of goaf roof is constructed,and the internal force of roof is deduced by the theory of hingeless arch.The calculation method of roof safety factor(K)under the environment of deep mining is proposed in view of compression failure and shear failure of roof.The calculation formulas of shear safety factor(K1),compression safety factor(K2)and comprehensive safety factor(K)of roof are given.The influence of stope span and roof thickness on roof stability is considered in this paper.The results show that when the roof thickness remains constant,the roof safety factor decreases with the increasing of the stope span;when the stope span remains constant,the roof safety factor increases with the increasing of the roof thickness.The deep mining example shows that when the stope span is 30 m and the roof thickness is 10 m,the roof comprehensive safety factor is 1.12,which indicates the roof is in a stable state.
基金"973 " Subjects (No. 2010CB732004)National Natural Science Foundation Project (No.50934006)
文摘Study on efficient mining of the steep incline and fractured ore-bodies in Yongshaba mine of Guizhou Kailin Group shows that ore-body is fractured and difficult to support the roadways in-vein.After research of the actual conditions about the ore-bodies,we have made the initial decision to adopt reconstruction of roof downward sublevel cut-and-fill mining.The men work safely under the false roof supporting the top plate.However,the difficult problem is how to determine the strength of the false roof.In this case,the method based on reliability theory has been put forward.Combined with elastic mechanics and field practice,when practical value of reliable probability is 90 %,the value of the false roof strength has been calculated,and the study shows that stope span greatly influences the false roof strength.With the strength of artificial roof,the reasonable reinforcement design ensures the false roof which can supply the demand of strength under large span and load.