Advances in intelligent shield machines reflect an evolving trend from traditional tunnel boring machines(TBMs)to tunnel boring robots(TBRs).This shift aims to address the challenges encountered by the conventional sh...Advances in intelligent shield machines reflect an evolving trend from traditional tunnel boring machines(TBMs)to tunnel boring robots(TBRs).This shift aims to address the challenges encountered by the conventional shield machine industry arising from construction environment and manual operations.This study presents a systematic review of intelligent shield machine technology,with a particular emphasis on its smart operation.Firstly,the definition,meaning,contents,and development modes of intelligent shield machines are proposed.The development status of the intelligent shield machine and its smart operation are then presented.After analyzing the operation process of the shield machine,an autonomous operation framework considering both stand-alone and fleet levels is proposed.Challenges and recommendations are given for achieving autonomous operation.This study offers insights into the essence and developmental framework of intelligent shield machines to propel the advancement of this technology.展开更多
An iterative method is introduced successfully to solve the inverse kinematics of a 6-DOF manipulator of a tunnel drilling rig based on dual quaternion, which is difficult to get the solution by Denavit-Hartenberg(D-H...An iterative method is introduced successfully to solve the inverse kinematics of a 6-DOF manipulator of a tunnel drilling rig based on dual quaternion, which is difficult to get the solution by Denavit-Hartenberg(D-H) based methods. By the intuitive expression of dual quaternion to the orientation of rigid body, the coordinate frames assigned to each joint are established all in the same orientation, which does not need to use the D-H procedure. The compact and simple form of kinematic equations, consisting of position equations and orientation equations, is also the consequence of dual quaternion calculations. The iterative process is basically of two steps which are related to solving the position equations and orientation equations correspondingly. First, assume an initial value of the iterative variable; then, the position equations can be solved because of the reduced number of unknown variables in the position equations and the orientation equations can be solved by applying the solution from the position equations, which obtains an updated value for the iterative variable; finally, repeat the procedure by using the updated iterative variable to the position equations till the prescribed accuracy is obtained. The method proposed has a clear geometric meaning, and the algorithm is simple and direct. Simulation for 100 poses of the end frame shows that the average running time of inverse kinematics calculation for each demanded pose of end-effector is 7.2 ms on an ordinary laptop, which is good enough for practical use. The iteration counts 2-4 cycles generally, which is a quick convergence. The method proposed here has been successfully used in the project of automating a hydraulic rig.展开更多
基金supported by the National Natural Science Foundation of China(No.52105074)the Open Project of State Key Laboratory of Shield Machine and Boring Technology(No.SKLST-2021-K02),China。
文摘Advances in intelligent shield machines reflect an evolving trend from traditional tunnel boring machines(TBMs)to tunnel boring robots(TBRs).This shift aims to address the challenges encountered by the conventional shield machine industry arising from construction environment and manual operations.This study presents a systematic review of intelligent shield machine technology,with a particular emphasis on its smart operation.Firstly,the definition,meaning,contents,and development modes of intelligent shield machines are proposed.The development status of the intelligent shield machine and its smart operation are then presented.After analyzing the operation process of the shield machine,an autonomous operation framework considering both stand-alone and fleet levels is proposed.Challenges and recommendations are given for achieving autonomous operation.This study offers insights into the essence and developmental framework of intelligent shield machines to propel the advancement of this technology.
基金Project(2013CB035504)supported by the National Basic Research Program of China
文摘An iterative method is introduced successfully to solve the inverse kinematics of a 6-DOF manipulator of a tunnel drilling rig based on dual quaternion, which is difficult to get the solution by Denavit-Hartenberg(D-H) based methods. By the intuitive expression of dual quaternion to the orientation of rigid body, the coordinate frames assigned to each joint are established all in the same orientation, which does not need to use the D-H procedure. The compact and simple form of kinematic equations, consisting of position equations and orientation equations, is also the consequence of dual quaternion calculations. The iterative process is basically of two steps which are related to solving the position equations and orientation equations correspondingly. First, assume an initial value of the iterative variable; then, the position equations can be solved because of the reduced number of unknown variables in the position equations and the orientation equations can be solved by applying the solution from the position equations, which obtains an updated value for the iterative variable; finally, repeat the procedure by using the updated iterative variable to the position equations till the prescribed accuracy is obtained. The method proposed has a clear geometric meaning, and the algorithm is simple and direct. Simulation for 100 poses of the end frame shows that the average running time of inverse kinematics calculation for each demanded pose of end-effector is 7.2 ms on an ordinary laptop, which is good enough for practical use. The iteration counts 2-4 cycles generally, which is a quick convergence. The method proposed here has been successfully used in the project of automating a hydraulic rig.