Elastoplastic pipe-soil interaction analyses of partially-supported jointed water mains 被引量:4
1
作者 Yu SHAO Tu-qiao ZHANG 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2008年第11期1497-1506,共10页
Water distribution networks are essential components of water supply systems. The combination of pipe structural deterioration and mechanics leads to the failure of pipelines. A physical model for estimating the pipe ... Water distribution networks are essential components of water supply systems. The combination of pipe structural deterioration and mechanics leads to the failure of pipelines. A physical model for estimating the pipe failure must include both the pipe deterioration model and mechanics model. Winkler pipe-soil interaction (WPSI), an analytical mechanics model developed by Rajani and Tesfamariam (2004), takes external and internal loads, temperature changes, loss of bedding support, and the elastoplastic effect of soil into consideration. Based on the WPSI model, a method to evaluate the elastic and plastic areas was proposed in the present study. An FEM model based on pipe-soil interaction (PSI) element was used to verify the analytical model. Sensitivity analyses indicate that the soft soil, long pipe and high temperature induced the axial plastic deformation more likely, which, however, may not occur in normal scenarios. The soft soil, pipes in small diameters, long unsupported bedding are prone to form flexural plastic area. The results show that the pipes subjected to the same loads have smaller stresses in the elastoplastic analysis than elastic analysis. The difference, however, is slight. 展开更多
关键词 Elastoplastic soil Winkler pipe-soil interaction (WPSI) Jointed water mains
下载PDF
Water System Condition and Asset Replacement Prioritization
2
作者 Frederick Bloetscher Zachary Farmer +3 位作者 James Barton Teresa Chapman Paula Fonseca Monica Shaner 《Journal of Water Resource and Protection》 CAS 2023年第5期165-178,共14页
The goal of asset management is to identify and track the maintenance and replacement of assets that have reached their useful life. For that reason, gathering data and collecting information is a critical step when d... The goal of asset management is to identify and track the maintenance and replacement of assets that have reached their useful life. For that reason, gathering data and collecting information is a critical step when developing an asset management plan. Such data gathering includes physical and operational properties of the assets as well as collecting and tracking important events during the lifespan of the asset (i.e., pipe breaks, replacement year, maintenance performed, etc.). Critical factors in the asset management plan may be overlooked when there is no data or poor quality data. However, many utilities lack the resources for examining buried infrastructure and lack good quality work order data, so other methods of data collection are needed. The concept for this paper was to develop a means to acquire data on the assets for a condition assessment to identify pipes that were most likely to break and those with the highest consequences for same. Three utilities were used as examples. It was found that for buried infrastructure, much more information was known than anticipated but the actual predictions relied on only a few factors related to pipe type. However, there is a need to track the consequences, in this case breaks, which would indicate a failure. The latter would be useful for predicting future maintenance needs and the most at-risk assets, but is often missing in utility systems as many utilities do not adequately track breaks sufficiently. In this case two utilities were analyzed and predication on a third was developed. 展开更多
关键词 water Main Predicted Failure Asset Management Pipe Failure water Distributions
下载PDF
The Design of Water-reusing Network with a Hybrid Structure Through Mathematical Programming 被引量:4
3
作者 刘永忠 段海涛 冯霄 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2008年第1期1-10,共10页
A new design method for a water-reusing network, with a hybrid structure, to reduce the complexity of the network and to minimize freshwater consumption, is proposed. The unique feature of the methodology proposed .i... A new design method for a water-reusing network, with a hybrid structure, to reduce the complexity of the network and to minimize freshwater consumption, is proposed. The unique feature of the methodology proposed .in this article is to control the complexity of the water network by regulation of the control number in a water-reusing system. It combines the advantages of a conventional water-reusing network and a water-reusing net work with internal water mains. To illustrate the proposed method, a single contaminant system and a multiple contaminant system serve as examples of the problems. 展开更多
关键词 water-reusing network internal water main hybrid structure OPTIMIZATION
下载PDF
Parameter selection and model research on remote sensing evaluation for nearshore water quality 被引量:1
4
作者 LEI Guibin ZHANG Ying +2 位作者 PAN Delu WANG Difeng FU Dongyang 《Acta Oceanologica Sinica》 SCIE CAS CSCD 2016年第1期114-117,共4页
Using remote sensing technology for water quality evaluation is an inevitable trend in marine environmental monitoring. However, fewer categories of water quality parameters can be monitored by remote sensing technolo... Using remote sensing technology for water quality evaluation is an inevitable trend in marine environmental monitoring. However, fewer categories of water quality parameters can be monitored by remote sensing technology than the 35 specified in GB3097-1997 Marine Water Quality Standard. Therefore, we considered which parameters must be selected by remote sensing and how to model for water quality evaluation using the finite parameters. In this paper, focused on Leizhou Peninsula nearshore waters, we found N, P, COD, PH and DO to be the dominant parameters of water quality by analyzing measured data. Then, mathematical statistics was used to determine that the relationship among the five parameters was COD〉DO〉P〉N〉pH. Finally, five-parameter, fourparameter and three-parameter water quality evaluation models were established and compared. The results showed that COD, DO, P and N were the necessary parameters for remote sensing evaluation of the Leizhou Peninsula nearshore water quality, and the optimal comprehensive water quality evaluation model was the four- parameter model. This work may serve as a reference for monitoring the quality of other marine waters by remote sensing. 展开更多
关键词 main water quality parameters water quality parameter selection comprehensive water qualityevaluation model Leizhou Peninsula nearshore waters
下载PDF
Estimation of water volume transports through the main straits of the East China Sea 被引量:1
5
作者 Zhao Baoren and Fang Guohong Institute of Oceanology, Academia Sinica, Qingdao, 266071, China 《Acta Oceanologica Sinica》 SCIE CAS CSCD 1991年第1期1-13,共13页
The structure of current speed and the variability of volume transports of the Kuroshio in the Tokara-kaikyo and Osumi-kaikyo are discussed on the basis of data of KER in the period from 1977 to 1984. The average geos... The structure of current speed and the variability of volume transports of the Kuroshio in the Tokara-kaikyo and Osumi-kaikyo are discussed on the basis of data of KER in the period from 1977 to 1984. The average geostrophic transport through these two straits is estimated to be 24. 5×106 m3/s and only 1/12 of the transport is through the Osumi-kaiky5. Countercurrents on both sides of the Kuroshio trunk are observed in the Tokara-kaikyo. Calculation indicates that the average geostrophic current speed is less than the GEK current speed, systematically. On the basis of the current measurements, the northward transports through the Taiwan Strait in winter and summer are estimated to be 1. 05×106and 3. 16×106m3/s, respectively. From Chu's data (1976) the average transport of the Kuroshio flowing into the East China Sea passing through the passage east of Taiwan is about 29. 3×106m3/s. From Miita and Ogawa's data (1984) the average transport through the Tsushima-kaikyo is 3. 6×106m3/s. Thus the volume transports through the above four straits are roughly in balance, the total outflowing transport is slightly larger than the total inflowing transport. The possible reasons resulting in the difference of transports are also discussed. 展开更多
关键词 Estimation of water volume transports through the main straits of the East China Sea GEK
下载PDF
A Value Engineering Analysis of Head Loss in Pumping Mains
6
作者 Andrew Cobbe Rodney McDermott 《Engineering(科研)》 CAS 2022年第12期613-631,共19页
With net zero carbon emissions targets approaching over the next 20 to 30 years, the water industry must act now to develop energy efficient techniques and designs to reduce emissions and reduce the carbon footprint o... With net zero carbon emissions targets approaching over the next 20 to 30 years, the water industry must act now to develop energy efficient techniques and designs to reduce emissions and reduce the carbon footprint of water utility providers. There is also the potential for significant energy and therefore financial savings to be realised from the adoption of more energy efficient designs approaches. Water utility providers account for a significant proportion of national electricity consumption. The purpose of this research is to determine if, over the long term, opting for a larger diameter pipe at design stage can lead to significant financial and emissions savings for water utility providers when considering pumping mains. Pumping mains are widely used throughout the water and wastewater industry where a gravity solution is not possible. 72 hypothetical water main design scenarios were analysed and the long term financial and environmental impact of each hypothetical water main was assessed. It was found across all design scenarios that larger diameter water mains were capable of delivering the same rate of flow of smaller diameter pipes at a much reduced velocity and requiring reduced pumping power. It was concluded that pumped mains of larger diameters can ultimately be more energy efficient and cost effective over the long term when selected in favour of smaller diameter pumped mains in otherwise identical design scenarios. 展开更多
关键词 Value Engineering Head Loss Pumping Main water Main Design Pipe Diameter Energy Reduction Carbon Reduction
下载PDF
The Main Task of Water Transportation in 2004
7
《交通建设与管理》 2004年第Z1期13-13,共1页
The coastal port deep-water berths from existing 135 berths increase to 164 berths, and the throughput capacity will rising from current 231 million tons to 340 million tons which include build container berths from c... The coastal port deep-water berths from existing 135 berths increase to 164 berths, and the throughput capacity will rising from current 231 million tons to 340 million tons which include build container berths from current 54 berths increase to 69 berths, the throughput capacity will from current 12 million TEUs increase to 19.4 million TEUs. In the final stage of Tenth Five-year plan, the quantity of national coastal port deep-water berths will from current 800 berths increase to 展开更多
关键词 The Main Task of water Transportation in 2004 WILL
下载PDF
The main characteristics,motion of bedrock water and the problems of bedrock water resources
8
《Global Geology》 1998年第1期66-66,共1页
关键词 The main characteristics motion of bedrock water and the problems of bedrock water resources
下载PDF
PRODUCTIVITY AND WATER UTILITY FOR MAIN CROPS IN LOESSAL HILL.REGION, SOUTHERN NINGXIA
9
作者 山崙 孙纪斌 《Chinese Science Bulletin》 SCIE EI CAS 1986年第16期1151-1152,共2页
The loessal hill region in southern Ningxia is a semiarid and severe eroded area with developed agriculture and animal husbandry. It has long been an argument whether there might be more potentiality of farming and wh... The loessal hill region in southern Ningxia is a semiarid and severe eroded area with developed agriculture and animal husbandry. It has long been an argument whether there might be more potentiality of farming and whether food production can be sustained at a level of local sufficiency. 展开更多
关键词 SOUTHERN NINGXIA PRODUCTIVITY AND water UTILITY FOR MAIN CROPS IN LOESSAL HILL.REGION
下载PDF
Main Water Resource Development Goals for The Next Five Years
10
《Beijing Review》 2011年第8期25-25,共1页
The system for flood control and disaster relief should be upgraded. Flood- control systems for major rivers and lakes should be built. Broken dikes for water reservoirs should be repaired. An
关键词 GDP Main water Resource Development Goals for The Next Five Years