期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Project risk control of underground engineering geological disaster in pumped-storage power station
1
作者 Luo Shaoji 《Engineering Sciences》 EI 2014年第3期2-8,共7页
This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitor... This paper introduced the construction of the pumped-storage power station (PSPS). In the excava- tion of underground power house, the principle of excavation in thin layer and support in time with real time monitoring are adopted. The excavation blasting parameters are adjusted timely. Through these, the excavation quality can be guaranteed, the surrounding rock can be prevented from being damaged and the deformation of power house side wall can be controlled. Five security defense lines have been adopted to solve anti-seepage and drainage in the major underground projects. 展开更多
关键词 PSPS TUNNEL : PROJECT RISK CONTROL drainage CONTROL SYSTEM
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部