期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Application of New Concept Waterproofing in Xiang'an Undersea Tunnel,China 被引量:3
1
作者 陈铁林 张顶力 +1 位作者 曾超 应国刚 《China Ocean Engineering》 SCIE EI CSCD 2013年第1期121-130,共10页
As a kind of transportation mode for crossing channels, undersea tunnel has incomparable advantages for its directness, convenience, fastness, insusceptibility to weather conditions, and smaller influences on environm... As a kind of transportation mode for crossing channels, undersea tunnel has incomparable advantages for its directness, convenience, fastness, insusceptibility to weather conditions, and smaller influences on environments. In recent years, with the development of undersea tunnel construction, the design and construction technologies have been greatly enhanced. The first undersea tunnel in China has just been built. Waterproofing is the key technique of undersea tunneling. A new concept of waterproofing scheme of grouting, sealing, draining and divided sections was adopted in the construction of the tunnel based on the researches, the in-situ geological features, the astuteness of the current technology and the cost of construction. The structural details of the sealing and draining system are introduced to illustrate the salient features of the new waterproofing technique. It is hoped that experiences described in the paper can offer guidance for the construction of the extensive undersea tunnels in the coming years. 展开更多
关键词 undersea tunnel WATERPROOFING sealing-draining system
下载PDF
Long-term Field Corrosion Monitoring in Supporting Structures of China Xiamen Xiangan Subsea Tunnel
2
作者 Chao-Yang Gong Xiao-Yong He +8 位作者 Yong-Wei Li Si-Zhe He Xuan Cheng Liu-Ying Huang Ying Zhang Jiu-Bin Chen Shao-Hui Xu Jian-Bin Zhang Chao Zeng 《Acta Metallurgica Sinica(English Letters)》 SCIE EI CAS CSCD 2017年第4期399-408,共10页
Xiamen Xiangan Subsea Tunnel is the first undersea tunnel constructed in China. It has become the major undersea pathway connecting Xiamen Island and Xiangan District since its operation in 2010. The total length is 6... Xiamen Xiangan Subsea Tunnel is the first undersea tunnel constructed in China. It has become the major undersea pathway connecting Xiamen Island and Xiangan District since its operation in 2010. The total length is 6.05 km with the undersea length of 4.2 km. In an effort to onsite-monitor reinforcement corrosion in concrete structures, the commercially available CorroWatch multiprobe sensors and ERE-20 reference electrodes were pre-embedded in the selected locations and positions of supporting structures during the tunnel constructions. The real-time data have been collected annually by onsite measurements for 6 years. In this paper, the feasibility of the onsite corrosion monitoring system and suitability of the measured parameters including corrosion current, potential and temperature are discussed based on the preliminary results. The measured typical cyclic-type variations in corrosion current and temperature with monitoring time might be related to the seasonal changes during the annual routine measurements. The widely scattered corrosion potentials that are fluctuated complicatedly reflected localized differences in the vicinity of rebar and concrete. These findings, along with the progressively ongoing research, will provide valuable information in structural durability for service life prediction of reinforced concrete structures exposed to marine environments. 展开更多
关键词 Corrosion monitor Corrosion current Corrosion behavior SENSORS
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部